appendix 8.1 - station pier formwork drawings

7
3600 S/S 1200 1200 3600 S/S 1200 1200 600 A B A B 600 1790 1790 2170 2170 1981 1981 1981 1981 1981 1981 1200 1200 1200 1200 1200 1200 600 600 C 1981 1981 1981 1981 1981 1485 1981 1981 1981 1981 1981 720 1 1 2 2 3 C 2170 2170 1790 1790 1200 990 2700 S/S 720 S/S 3600 S/S 3600 S/S 720 6 3 600 900 600 2170 1790 1485 1485 1485 1790 1790 1200 1200 1200 /S Not checked for erection Status Preliminary For discussion ! RMD Kwikform Registered Company RMD Kwikform Ltd. A Member of Interserve Plc. Middle East www.rmdkwikform.com Conditions Amendments Rev By Auth Date Drawing Description Reviewed by Drawn by Designed by Scale A1 Drawing Number - 1: Revision Scale A3 1: Date - - - NTS NTS ADL/LOM TL JFD 07.04.15 STEEL SHUTTER STATION EDGE PIER-STEM PLAN & SECTION RIYADH METRO LINE 3 ARRIYADH NEW MOBILITY KPR006320 13 29 100 01 C PIER STEAM (ELEVATION 1-1) SECTION A-A (SHOWING KWIKSTAGE SUPPORT) SECTION B-B (SHOWING KWIKSTAGE WORKING PLATFORM) Application Notes : Wall Formwork Concrete Pressure Maximum Concrete Pressure not to exceed : kN/m2 87 900 1000 1500 2000 1200 1800 2400 1470 1470 2170 2560 1790 1790 2170 2730 2170 2170 2560 3030 Bay width Lift height 1470 Bracing Chart and Detail Kwikstage Propping - Loading Data 55.0kN 40.0kN 27.5kN K/Stage U-Head to S/Slim Soldier Connection Det. S/Slim Soldier to S/Slim Soldier Connection Detail Detail of Superslim Soldier to Handrail Connection Falsework Stability Customer Drawing Reference RMDK Drawing Reference S/Slim Soldier End to End Connection Detail S/Slim Soldier to Strut Adaptor Connection Detail Plan Legend A B C

Upload: imteyaz-ali

Post on 13-Apr-2017

94 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Appendix 8.1 - Station Pier Formwork Drawings

3600 S/S

1200 1200

3600 S/S

12001200600

A

B

A

B

600

1

7

9

0

1

7

9

0

2

1

7

0

2

1

7

0

19

81

19

81

19

81

19

81

19

81

19

81

1200 1200

1200 1200 12001200

600

600

C

19

81

19

81

19

81

19

81

19

81

14

85

19

81

19

81

19

81

19

81

19

81

720

1 1

2

2 3

C

2

1

7

0

2

1

7

0

1

7

9

0

1

7

9

0

1200

99

0

2700 S/S 720 S/S

3

6

0

0

S

/

S

3

6

0

0

S

/

S

7

2

0

6

3

600 900 600

2

1

7

0

1

7

9

0

14

85

14

85

14

85

1

7

9

0

1

7

9

0

1200

1200 1200

720 S/S

Not checked for erection

Status

Preliminary For discussion

!

RMD Kwikform

Registered Company RMD Kwikform Ltd.

A Member of Interserve Plc.

Middle East

www.rmdkwikform.com

Conditions

Amendments

Rev By Auth Date

Drawing Description

Reviewed byDrawn by

Designed by

Scale A1

Drawing Number

-

1:

Revision

Scale A3 1: Date

- - -

NTS

NTS

ADL/LOM

TL

JFD

07.04.15

STEEL SHUTTER

STATION EDGE PIER-STEM PLAN & SECTION

RIYADH METRO LINE 3

ARRIYADH NEW MOBILITY

KPR006320 13 29 100 01 C

PIER STEAM (ELEVATION 1-1)

SECTION A-A (SHOWING KWIKSTAGE SUPPORT)

SECTION B-B (SHOWING KWIKSTAGE WORKING PLATFORM)

Application Notes : Wall Formwork

Concrete Pressure

Maximum Concrete Pressure not to exceed : kN/m287

900

1000

1500

2000

1200 1800 2400

1470 1470 2170 2560

1790 1790 2170 2730

2170 2170 2560 3030

Bay width

Lift height

1470

Bracing Chart and Detail

Kwikstage Propping - Loading Data

55.0kN

40.0kN

27.5kN

K/Stage U-Head to S/Slim Soldier Connection Det.

S/Slim Soldier to S/Slim Soldier Connection Detail

Detail of Superslim Soldier to Handrail Connection

Falsework Stability

Customer Drawing Reference

RMDK Drawing Reference

S/Slim Soldier End to End Connection Detail

S/Slim Soldier to Strut Adaptor Connection Detail

Plan Legend

A

B

C

Page 2: Appendix 8.1 - Station Pier Formwork Drawings

DD

C

24

00

24

00

24

00

24

00

24

00

24

00

24

00

24

00

12

00

12

00

12

00

12

00

12

00

12

00

1200 1200

1200 1200

1200 1200

1200 1200

600 600

600

Bra

ce

Brace

Brace

Brace

Brace

Bra

ce

600

Brace

Brace Brace

Brace

12

00

1200

1200

12

00

1200

1200

Bra

ce

Bra

ce

12

00

12

00

12

00

1500 Tube

2

0

0

0

T

u

b

e

Bra

ce

Bra

ce

Bra

ce

6

90

0

90

0

90

0

12

00

Bra

ce

90

0

600 900 600

600 900 600

600 900 600

2

0

0

0

T

u

b

e

2

0

0

0

T

u

b

e

2

0

0

0

T

u

b

e

Bra

ce

Bra

ce

Bra

ce

Bra

ce

12

00

12

00

12

00

Bra

ce

Bra

ce

Bra

ce

90

0

90

0

90

0

12

00

Bra

ce

90

0

600 900 600

600 900 600

600 900 600

1500 Tube

1500 Tube1500 Tube

Brace

Brace

Brace

Brace

Brace

Brace

3600 S/S

1200

1200

3600 S/S

1200

1200

1800

1200

1200

1

7

9

0

2

1

7

0

2

5

6

0

2

1

7

0

600

19

81

19

81

19

81

19

81

19

81

19

81

19

81

19

81

19

81

19

81

19

81

1200

1200 1200

1800

1200

19

81

19

81

14

85

6

19

81

19

81

1800

1200

1800

1200

1800

1200

720

720 S/S2700 S/S

2

1

7

0

2

1

7

0

1

7

9

0

1

7

9

0

99

0

900

900

900

900

900

900

2

1

7

0

1

7

9

0

14

85

14

85

14

85

99

01

48

51

48

51

48

5

2

2

3

3

1 1

2500 Tube

2500 Tube

15

00

T

ub

e

720 S/S

720

Not checked for erection

Status

Preliminary For discussion

!

RMD Kwikform

Registered Company RMD Kwikform Ltd.

A Member of Interserve Plc.

Middle East

www.rmdkwikform.com

Conditions

Amendments

Rev By Auth Date

PIER STEM (ELEVATION 2-2)

SECTION C-C (SHOWING STEM WORKING PLATFORM)

SECTION D-D (SHOWING KWIKSTAGE SUPPORT)

900

1000

1500

2000

1200 1800 2400

1470 1470 2170 2560

1790 1790 2170 2730

2170 2170 2560 3030

Bay width

Lift height

1470

Bracing Chart and Detail

Kwikstage Propping - Loading Data

55.0kN

40.0kN

27.5kN

K/Stage U-Head to S/Slim Soldier Connection Det.

S/Slim Soldier to S/Slim Soldier Connection Detail

80

Lift Height Safe Working Load

1500

60

2000

Detail of Superslim Soldier to Handrail Connection

Customer Drawing Reference

RMDK Drawing Reference

S/Slim Soldier End to End Connection Detail

S/Slim Soldier to Strut Adaptor Connection Detail

Application Notes : Wall Formwork

Concrete Pressure

Maximum Concrete Pressure not to exceed : kN/m287

Falsework Stability

STARTING PANEL ELEVATION

SCAFFOLD BOARD CLAMP

A

B

Drawing Description

Reviewed byDrawn by

Designed by

Scale A1

Drawing Number

-

1:

Revision

Scale A3 1: Date

- - -

NTS

NTS

ADL/LOM

TL

JFD

07.04.15

STEEL SHUTTER

STATION EDGE PIER-STEM PLAN & SECTION

RIYADH METRO LINE 3

ARRIYADH NEW MOBILITY

KPR006320 13 29 100 02 C

C

Page 3: Appendix 8.1 - Station Pier Formwork Drawings

3600 S/S3600 S/S

EE

3600 S/S3600 S/S

1800

1

7

9

0

2

1

7

0

600

1981

1981

C 6

1200

1200

2700 S/S 720 S/S

1485

7

2

0

1

8

0

0

S

/

S

1

7

9

0

1981

1200

1485

1485

2

1

7

0

720 720

1981

1981

1981

1981

1981

1981

1485

1485

1485

1981

1981

1981

1981

1981

1981

1981

1485

1485

1485

1485

1981

120012006001200 1200 600

120012006001200 1200 600

2

1

7

0

2

1

7

0

2

1

7

0

2

1

7

0

2

1

7

0

2

1

7

0

1981

1981

1981

1981

1981

1981

1485

1485

1485

1485

1981

1981

1981

1981

1981

1981

1981

1485

1485

1485

1981

1200 1200

1200 1200

2

1

7

0

2

1

7

0

2

1

7

0

2

1

7

0

2

1

7

0

2

1

7

0

990

990

1

7

9

0

1

4

7

0

1

7

9

0

1

4

7

0

1

4

7

0

1

4

7

0

1485

900

900

900

900

900

600 900 600

600 900 600

600 900 600

2

1

7

0

2

1

7

0

2

1

7

0

1

7

9

0

1

4

7

0

2

0

0

0

T

u

b

e

2

0

0

0

T

u

b

e

Not checked for erection

Status

Preliminary For discussion

!

RMD Kwikform

Registered Company RMD Kwikform Ltd.

A Member of Interserve Plc.

Middle East

www.rmdkwikform.com

Conditions

Amendments

Rev By Auth Date

PIER CROWN (ELEVATION 1-1)

SECTION E-E (SHOWING CROWN PLATFORM)

PIER CROWN (ELEVATION 3-3)TYPICAL STAIR CASE ELEVATION

STAIR CASE UNIT (ALUMINUM VERSION)

Application Notes : Wall Formwork

Concrete Pressure

Maximum Concrete Pressure not to exceed : kN/m287

Falsework Stability

A

B

Drawing Description

Reviewed byDrawn by

Designed by

Scale A1

Drawing Number

-

1:

Revision

Scale A3 1: Date

- - -

NTS

NTS

ADL/LOM

TL

JFD

07.04.15

STEEL SHUTTER

STATION EDGE PIER-CROWN DETAIL

RIYADH METRO LINE 3

ARRIYADH NEW MOBILITY

KPR006320 13 29 100 03 C

C

Page 4: Appendix 8.1 - Station Pier Formwork Drawings

600

1200

Brace

1800

1200

Brace

1800

600

1200

600 600

1200

900

1800

1800

900

900

1200

2

1

7

0

1

7

9

0

2500

2000

3000

2000

3000

1981

1981

1981

1981

1981

1981

1981

1981

1981

1981

1200

2

1

7

0

900

1

7

9

0

2 2

1

1

1200 1200

A A

B B

1800

600

C

1

7

9

0

1

7

9

0

2

5

6

0

2

1

7

0

C

1200

720

2

1

7

0

2

1

7

0

1981

1981

1485

1485

1485

1485

Not checked for erection

Status

Preliminary For discussion

!

RMD Kwikform

Registered Company RMD Kwikform Ltd.

A Member of Interserve Plc.

Middle East

www.rmdkwikform.com

Conditions

A

Amendments

Rev By Auth Date

Drawing Description

Reviewed byDrawn by

Designed by

Scale A1

Drawing Number

-

1:

Revision

Scale A3 1: Date

- - -

NTS

NTS

NCC

TL

JD

--

Pier Stem-Steel Panel, K/Stage Access-Sheet 1 of 2

Central Station Piers

Package-2, Line-3, Riyadh Metro

Ar Riyadh New Mobility

KPR006320 14 29 100 01 C

PIER STEM ELEVATION 2-2

Kwikstage Propping - Loading Data

55.0kN

40.0kN

27.5kN

K/Stage U-Head to S/Slim Soldier Connection Det. S/Slim Soldier to S/Slim Soldier Connection DetailS/Slim Soldier End to End Connection Detail

S/Slim Soldier to Strut Adaptor Connection Detail

Detail of Superslim Soldier to Handrail Connection

Customer Drawing Reference

Falsework Stability

PLAN A-A (SHOWING KWIKSTAGE SUPPORT LAYOUT)

PLAN B-B

Product Notes : Kwikstage Access / Kwikstair

RMDK Drawing Reference

(SHOWING KWIKSTAGE WORKING PLATFORM SUPPORT )

PLAN C-C

(SHOWING TOP WORKING PLATFORM)

!

Note:

All dimensions and elevations

to be confirmed by Customer

!

All bolt holes on steel panels

to be used with specified bolts

Denotes s/slim prop assembly location

Application Notes : Wall Formwork

Concrete Pressure

Maximum Concrete Pressure not to exceed : kN/m287.0

Pier Stem Elevation 1-1 - Showing Kicker Panel

B

C

Page 5: Appendix 8.1 - Station Pier Formwork Drawings

3

3

1200

B

B

2

1

7

0

1

7

9

0

2

1

7

0

1981

1981

1200

2

1

7

0

900

1981

1981

1981

1981

1981

1981

1981

1981

1981

1485

1485

1485

1485

1

7

9

0

3000

3000

3000

3000

3000

3000

3000

3000

540

180

1800 S/S900 S/S

540

1800 S/S 900 S/S 540

3600 S

/S

2700 S

/S

3600 S

/S

2700 S

/S

2700 S/S

1800 S

/S

2700 S/S

180

Not checked for erection

Status

Preliminary For discussion

!

RMD Kwikform

Registered Company RMD Kwikform Ltd.

A Member of Interserve Plc.

Middle East

www.rmdkwikform.com

Conditions

A

Amendments

Rev By Auth Date

Kwikstage Propping - Loading Data

55.0kN

40.0kN

27.5kN

K/Stage U-Head to S/Slim Soldier Connection Det.

S/Slim Soldier to S/Slim Soldier Connection DetailS/Slim Soldier End to End Connection DetailS/Slim Soldier to Strut Adaptor Connection Detail Detail of Superslim Soldier to Handrail Connection

Customer Drawing Reference

Falsework Stability

Product Notes : Kwikstage Access / Kwikstair

RMDK Drawing Reference

PIER STEM (ELEVATION 3-3) - FIRST POUR

PLAN B-B

RAPIDSHOR STAIR UNIT (ALUMINUM VERSION)

Product Notes : Rapidshor

!

Note:

All dimensions and elevations

to be confirmed by Customer

!

All bolt holes on steel panels

to be used with specified bolts

Application Notes : Wall Formwork

Concrete Pressure

Maximum Concrete Pressure not to exceed : kN/m287.0

DENOTES S/SLIM PROP ASSEMBLY LOCATION

PLAN B-B (SHOWING PRIMARY BEAM)

B

C

Drawing Description

Reviewed byDrawn by

Designed by

Scale A1

Drawing Number

-

1:

Revision

Scale A3 1: Date

- - -

NTS

NTS

NCC

TL

JD

--

Pier Stem-Steel Panel, K/Stage Access-Sheet 2 of 2

Central Station Piers

Package-2, Line-3, Riyadh Metro

Ar Riyadh New Mobility

KPR006320 14 29 100 02 C

Page 6: Appendix 8.1 - Station Pier Formwork Drawings

44

D D

1200

2

1

7

0

2

1

7

0

1

7

9

0

1

4

7

0

1200

2

1

7

0

2

1

7

0

1

7

9

0

1

4

7

0

E E

1981

1981

1981

1981

1981

1981

1981

1981

1485

1485

1485

1485

1485

600

3500 Tube

3500 Tube

3500 Tube

3500 Tube

1500

3000

3000

3000

3000

3000

3000

3000

3000

1500

3000

3000

3000

3000

3000

3000

3000

3000

900

Not checked for erection

Status

Preliminary For discussion

!

RMD Kwikform

Registered Company RMD Kwikform Ltd.

A Member of Interserve Plc.

Middle East

www.rmdkwikform.com

Conditions

A

Amendments

Rev By Auth Date

Kwikstage Propping - Loading Data

55.0kN

40.0kN

27.5kN

K/Stage U-Head to S/Slim Soldier Connection Det. S/Slim Soldier to S/Slim Soldier Connection DetailS/Slim Soldier End to End Connection Detail

S/Slim Soldier to Strut Adaptor Connection Detail

Detail of Superslim Soldier to Handrail Connection

Customer Drawing Reference

Falsework Stability

Product Notes : Kwikstage Access / Kwikstair

RMDK Drawing Reference

CORBEL (ELEVATION 4-4) - SECOND POUR

PLAN D-D

(SHOWING KWIKSTAGE WORKING PLATFORM SUPPORT )

PLAN E-E

(SHOWING TOP WORKING PLATFORM)

Product Notes : Rapidshor

!

Note:

All dimensions and elevations

to be confirmed by Customer

!

All bolt holes on steel panels

to be used with specified bolts

DENOTES TURNBUCKLE LOCATION

Application Notes : Wall Formwork

Concrete Pressure

Maximum Concrete Pressure not to exceed : kN/m245

B

C

Drawing Description

Reviewed byDrawn by

Designed by

Scale A1

Drawing Number

-

1:

Revision

Scale A3 1: Date

- - -

NTS

NTS

NCC

TL

JD

--

Corbel-Steel Panel, Kwikstage Access

Central Station Piers

Package-2, Line-3, Riyadh Metro

Ar Riyadh New Mobility

KPR006320 14 29 100 03 C

Page 7: Appendix 8.1 - Station Pier Formwork Drawings

1500

1500

G G

E F

2

1

7

0

2

1

7

0

1200 1200

2

1

7

0

2

1

7

0

1

7

9

0

1

4

7

0

1

7

9

0

4500 Tube

1981

1981

1981

1981

1981

1981

1981

1981

1981

990

1485

1485

1485

1485

600

3500 Tube

3500 Tube

3500 Tube

3500 Tube

1

4

7

0

3000

3000

3000

3000

3000

3000

3000

3000

1500

1500

3000

3000

3000

3000

3000

3000

3000

3000

900

4500 Tube

4500 Tube

5

5

Not checked for erection

Status

Preliminary For discussion

!

RMD Kwikform

Registered Company RMD Kwikform Ltd.

A Member of Interserve Plc.

Middle East

www.rmdkwikform.com

Conditions

A

Amendments

Rev By Auth Date

Kwikstage Propping - Loading Data

55.0kN

40.0kN

27.5kN

K/Stage U-Head to S/Slim Soldier Connection Det. S/Slim Soldier to S/Slim Soldier Connection DetailS/Slim Soldier End to End Connection Detail

S/Slim Soldier to Strut Adaptor Connection Detail

Detail of Superslim Soldier to Handrail Connection

Customer Drawing Reference

Falsework Stability

Product Notes : Kwikstage Access / Kwikstair

RMDK Drawing Reference

PIER CROWN (ELEVATION 5-5) - THIRD POUR

PLAN F-F

(SHOWING KWIKSTAGE WORKING PLATFORM SUPPORT )

PLAN G-G

(SHOWING TOP WORKING PLATFORM)

Product Notes : Rapidshor

!

Note:

All dimensions and elevations

to be confirmed by Customer

!

All bolt holes on steel panels

to be used with specified bolts

DENOTES S/SLIM PROP ASSEMBLY LOCATION

Application Notes : Wall Formwork

Concrete Pressure

Maximum Concrete Pressure not to exceed : kN/m266

B

C

Drawing Description

Reviewed byDrawn by

Designed by

Scale A1

Drawing Number

-

1:

Revision

Scale A3 1: Date

- - -

NTS

NTS

NCC

TL

JD

--

Crown- Steel Panel, Kwikstage Access

Central Station Piers

Package-2, Line-3, Riyadh Metro

Ar Riyadh New Mobility

KPR006320 14 29 100 04 C