Jelsa Project

25.06.2009

Primary Crusher – 2.600 t/h feed from two sides

25.06.2009

Material flow from PPP to SPP – mostly direct feed

Secondary plant – Building Ensemble

Tertiary plant feed stock – Total 250.000 tons for 5 process days

Tertiary Screening + Crushing – Compact Design

Crusher Building

Screening Building – 2 parallel processing lines

Wet Sand – Free loading access from all sides

Dry Sand – Dust reduction through complete covering

Stock Area – 500.000 tons on 2 x 450m tunnels possible

Stacker – Flexible two arm stock feeding

Off-Shore stock – 150.000 tons for 4 vessels

Shiploader – High flexibility for short ship loading time