geoinformatics infrastructure › 2013 › pdf › vivek kale.pdf · 2014-04-14 · chainage 0.000...

36
Geoinformatics in Infrastructure Geoinformatics in Infrastructure Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential. Vivek S. Kale M.Sc. Ph.D., FGSI, FIGU. Vivek S. Kale M.Sc. Ph.D., FGSI, FIGU. Kalyani Global Engineering Pvt. Ltd. Industry House, Mundhwa, PUNE 411 036. Kalyani Global Engineering Pvt. Ltd. Industry House, Mundhwa, PUNE 411 036.

Upload: others

Post on 03-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

Geoinformaticsin

Infrastructure

Geoinformaticsin

Infrastructure

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

InfrastructureInfrastructureVivek S. Kale

M.Sc. Ph.D., FGSI, FIGU.

Vivek S. KaleM.Sc. Ph.D., FGSI, FIGU.

Kalyani Global Engineering Pvt. Ltd.Industry House, Mundhwa,

PUNE 411 036.

Kalyani Global Engineering Pvt. Ltd.Industry House, Mundhwa,

PUNE 411 036.

Page 2: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

GEOSPATIAL TECHNOLOGYGEOSPATIAL TECHNOLOGY

ENRICH THE DECISION MAKING PROCESS BY PROVIDING THE KNOWLEDGE OF

““““WHERE” WHERE” WHERE” WHERE”

ENRICH THE DECISION MAKING PROCESS BY PROVIDING THE KNOWLEDGE OF

““““WHERE” WHERE” WHERE” WHERE”

THUS, PROVIDING AN UNSCRAMBLED VIEW

OF THE EARTH, ITS SYSTEMS & PROCESSES

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

OF THE EARTH, ITS SYSTEMS & PROCESSES

Page 3: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

GEOSPATIAL TECHNOLOGYGEOSPATIAL TECHNOLOGYHOLDS EVEN GREATER RELEVANCE ININFRASTRUCTURE PROJECTS. HOLDS EVEN GREATER RELEVANCE ININFRASTRUCTURE PROJECTS.

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

WHERE SITE-SPECIFIC

INFORMATION IS

THE CRITICAL

BACKBONE FOR

SUCCESSFUL

EXECUTION

Page 4: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

From site planning to

asbuilts,

A A technology / system technology / system that has efficacy that has efficacy across across the the Project Project Life CLife C ycleycle

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

asbuilts, GEOINFORMATICS

allows you to manageand integrate

disparate data types.

Page 5: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

With direct data access ,

transformation & export capabilities,

one can easily use &

A A technology / system technology / system that has efficacy that has efficacy across across the the Project Project Life CLife C ycleycle

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

one can easily use & distribute your data in

many formatsthus serving

MULTIPLE USERS&

USER NEEDS.

Page 6: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

33--D DESIGN & BIM : The value chain.D DESIGN & BIM : The value chain.

Rendering & Visualization

Volumetrics&

Construction Planning & Monitoring

Integration with Reporting & Finance

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

Site Site Site Site selectionselectionselectionselection

Plan / Plan / Plan / Plan / LayoutLayoutLayoutLayout

Design

Visualization(Walk-through; 360o Turn-

table)

& Estimations

Page 7: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

• User ignorance……….• User resistance…….• User indifference

(intuitive / threat perception)

• Cost fear……..??

ROAD-BLOCKS

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

• Cost fear……..??IS STRONGEST IN

CONSTRUCTION INDUSTY !!

And finally…..

Has this technology tried to reach out to the Construction industry and demonstrate the benefits?

Page 8: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

CASE STUDY 1: KHED CITY CASE STUDY 1: KHED CITY KHED CITY is one of India’s largest integrated development projects spread over 4500 hectares in northern Pune District.

KHED CITY is being developed by Khed Economic Infrastructure Pvt. Ltd. (KEIPL), a Kalyani Group – MIDC

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

Kalyani Group – MIDC joint venture. The Project, developed with a core infrastructure investment of about Rs. 12,500 crore(for phase I) is expected generate 120,000 new employment opportunities, host an integrated township with a population of more than 10 million.

Page 9: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

CASE STUDY 1: KHED CITY CASE STUDY 1: KHED CITY

The importance of geospatial technology was appreciated from the time of site-selection and all ‘best-practices’ were deployed (from surveys though facilities & town-planning) from Day 1.

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

One of the first lessons in this was that the entire Geospatial team had to learn the language of town-planners, construction industry and contractors!!

Page 10: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

CASE STUDY 1: KHED CITY CASE STUDY 1: KHED CITY KEY CHALLENGE:A rough, undulating terrain, essentially a barren grass-land. Very high requirement of land-grading, which could have seen costs spiral out of control at the start of the project itself.

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

Page 11: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

CASE STUDY 1: KHED CITY CASE STUDY 1: KHED CITY KEY CHALLENGE:A rough, undulating terrain, essentially a barren grass-land. Very high requirement of land-grading, which could have seen costs spiral out of control at the start of the project itself.

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

Page 12: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

KHED CITY: Plot-wise grading plans KHED CITY: Plot-wise grading plans

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

Page 13: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

KHED CITY : Spine Road in Phase I KHED CITY : Spine Road in Phase I

DEM FROM CONTOURS SATELLITE IMAGE

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

SIDE ELEVATION VIEW SIDE ELEVATION VIEW

Page 14: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

LAYOUT PLAN

KHED CITY : Spine Road in Phase I KHED CITY : Spine Road in Phase I

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

GRADIENT VIEW

CUT-FILL OPTIMISATIONEXCAVATION TRACKING & BILLING

Page 15: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

Chainage 0.00

0

0.20

0

0.40

0

0.60

0

0.80

0

1.00

0

1.20

0

1.40

0

1.60

0

1.80

0

2.00

0

2.20

0

2.40

0

2.60

0

2.80

0

3.00

0

3.20

0

3.40

0

3.60

0

3.80

0

3.90

0

ActivityLength in

KmCompleted Achivement

Soft Shoulder

Bituminous Concrete (BC)

Dense Bituminous Macadam (DBM)

LAYOUT PLANTools used:AUTODESK IDSBENTLEY ROAD MXPRIMAVERASAPTRIMBLE ETS+ MS PROJECTS / OFFICE

KHED CITY : Spine Road in Phase I KHED CITY : Spine Road in Phase I

STRIP CHART

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

Macadam (DBM)

Bituminous Concrete (BC)

5.93 0 0.00%

Dense Bituminous Macadam (DBM)

5.93 1.5 25.30%

Median Kerb Fixing 5.93 1.4 23.61%

Wet Mix Macadam (WMM)

5.93 1.5 25.30%

Granular Sub Base (GSB)

5.93 1.7 28.67%

Alignment Re-verification 5.93 2.2 37.10%Revise alignment approved by KEIPL on dt.12.12.12

Sub Grade Top 7.2 5.5 76.39%

Excavation / Embankment

7.2 7.0 97.22%

Box Culvert (Ch.) Pipe Culvert (Ch.) Box Ch. 1100 0.00 0.80 0.280 0.760 1.120 1.220 1.560 1.660 Spillway 2.060 2.700 3.520

Slab Pipe Laying 1.0 1.00 100.00%

Dra

win

g A

wai

ted

from

KE

IPL

100%

Walls PCC below Pipe Pipe

Raft Head wall 12.0 9.0 75.00%d/s 20% 100% 100% 100% 100% 100%

100%

PCC PCCCleaning & Grubbing

5.93 7.0 118.04%

Drawing Issued By KEIPL

Bund Location

Approval of Alignment from KEIPL

5.93 5.70 96.12%

Disputed Land

Alignment Marking 5.93 5.93 100.00%

Location of CD Work

0.80

0

0.28

0

0.76

0

1.12

0

1.22

0

1.56

0

1.66

0

2.70

0

3.52

0

Page 16: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

Monthly Status Report for Construction – Sept. 2011

Sr. No.

Description of Activity Start Date Finish DateStatus

Remark

1 Issue of GFC Drawing - 25-Aug-11 GFC Drawing Issued

2 Site Clearance 14-Jul-11 11-Aug-11 Encroachment Removal Completed

3 Utility Shifting 14-Jul-11 15-Oct-11

Electrical Line, Water supply line shifting in progress. Tree cutting Permission Received. PWD Auction for Tree Cutting on 19-Sep-11.

4 A Earth Work – One Side 26-Jul-11 31-Aug-11Earth work – LHS 3.1 Km Completed

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

4 A Earth Work – One Side 26-Jul-11 31-Aug-11Earth work – LHS 3.1 Km Completed Earth work – RHS 2.1 Km Completed

4 B Earth Work - Balance Side 01-Sep-11 25-Sep-11

5 Sub-Base / Base Course 15-Sep-11 25-Nov-11GSB – LHS 2.5 Km CompletedGSB – RHS 2.1 Km Completed

6 Bituminous Work 11-Oct-11 17-Dec-11 -

7 Widening of Pipe Culvert - 7 Nos. 14-Jul-11 25-Oct-11 6 Culvert Pipe Culvert Completed.

8 Drainage & Protection Work 02-Sep-11 07-Dec-11 -

9 Road Furniture 16-Nov-11 09-Jan-12 -

Page 17: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

CASE STUDY 2: MUNDRACASE STUDY 2: MUNDRA� BFL – ALSTOM JV is setting up a manufacturing plant for Power Plant Equipment at a 120 acres plot in Mundra SEZ, Gujarat.

� Plant and equipment of the unit would be sensitive to temperature, humidity and salinity conditions and hence appropriate protective

AdaniWilmar

Plot Location

ZERO POINT

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

appropriate protective measures required.

� Amongst other critical requirements, a strut-mounted crane with a capacity of 5000 Tons had to be installed within the plant.

� Foundation and design requirements were designed on this basis.

Page 18: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

Plot Location

ENVIRONMENTAL FACTORS: WIND

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

Location ofCoal HandlingWest Port

Location of Thermal Power Plants

COASTAL WINDS

Page 19: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

Plot Location

ENVIRONMENTAL FACTORS: SALINITY INCURSIONS

Stabilised dune

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

Frontal dune

Frontal dune

Page 20: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

GEOTECHNICAL INVESTIGATIONS:TEST DRILLING : 12 initial bore-holes for sampling (45 m depth each) + 7 subsequent ‘foundation specific’ bore-holes (up to 78 m depth).

PLATE-LOAD TESTING : 2 Dynamic loading tests up to 300 T point load

RESISTIVITY SOUNDING: 2 mutually perpendicular soundings for validation of the drilling results and extrapolation of the same.

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

No solid rock encountered up to depth of 75 m BGL

Page 21: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

BASIC PARAMETER:

Land grading (including fill of up to 7 m thickness) to remain above HFL. All roads / drains / etc have to have reinforced lining to ensure structural stability.

All structural foundations had to be located on “Piles”. A total of 2400 piles (max depth =28 m, 600 mm / 750 mm dia).

All ground level plinths will rest on RCC slabs that in turn rest

STRUCTURAL DESIGN:

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

All ground level plinths will rest on RCC slabs that in turn rest on Pre-cast pile-caps (9m x 9 m).

ERECTION PLAN :

All superstructures to be PEB structures (to ensure speed of erection = 24 months to commissioning)

THE CHALLENGE : PRECISION IN POSITIONING

In land fill and grading & from individual pile locations upwards.

Page 22: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

SATELLITE IMAGERY OF THE PLOT when acquired

DEM Generated from topographic contours

ACCURATE

COMPUTATION

AND

EXECUTION

MONITORING

OF LAND

GRADING AND

LAND GRADING

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

SATELLITE IMAGERY APRIL, 2011After land grading & filling

DEM Generated after grading andfilling of plot

GRADING AND

FILLING

YIELDED A

SAVING OF

> Rs. 3.0 Million

in cost of filling

material alone

(est Rs. 54 M.

Page 23: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

ACCURATE

COMPUTATION

AND

EXECUTION

MONITORING

OF LAND

GRADING AND

LAND GRADINGLand grading included fill of up

to 7 m thickness.

Completed in 9 weeks including compaction & curing.

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

GRADING AND

FILLING

YIELDED A

SAVING OF

> Rs. 3.0 Million

in cost of filling

material alone

(est Rs. 42 M. On-site: TRIMBLE S3 for live data

Back-end: AUTODESK 3D Civil.

Page 24: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

PLOT PLAN & BUILDING DESIGNS :

BASIC LAYOUT

2D / TURN-TABLE RENDERING

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

3D ELEVATIONS

3D MODEL & BOQ GENERATION

Page 25: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

BUILDING DESIGNS :

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

3D MODEL & BOQ :For both the subsurface s & pile caps

as well as the superstructures. The basic superstructure consists of

pre-erected / pre-constructed columns, struts and walls for the entire plant, including the crane-trolleys.

Page 26: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

BUILDING ERECTIONWork started in Sept, 2011 with the first pile-drilling rig installed.

Scaling up

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

Scaling up to an average of 20 piles per day (note each pile takes a total of 72 hours from start to finish.)

:

Page 27: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

BUILDING ERECTION

At peak time, 39 piles were laid in parallel on a single day!

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

day!

1600 piles (including test-piles) completed in 100 days

Tolerance of positional error was +/- 32 mm

Page 28: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

BUILDING ERECTION

Managing the

drilling slurry

was a major

operational

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

operational

challenge as

well as an

environmental

issue

Page 29: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

BUILDING ERECTION

Clusters of 9 / 6 / 4 piles were clubbed under single pile -caps.

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

pile -caps.

Bolts erected at centres of each pile-cap

Tolerance of positional error for Pile-cap centre was +/- 20 mm

Page 30: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

BUILDING ERECTION

Bolts ready for erection 153 days from 1 st

drilled pile.

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

JV-B building occupying an area of 610 m X 320 m

Tolerance of positional error for BOLTS was +/- 10 mm

Page 31: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

BUILDING ERECTION Day 154 from first drill.

All super-structure elements are pre-fabricated outside the site.

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

outside the site.

Bolt positions had to match PRECISELY; For each column and each beam!!!

Tolerance of positional error for BOLTS was +/- 10 mm

Page 32: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

BUILDING ERECTION

Day 180.

BEFORE THE FIRST

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

THE FIRST HEAVY RAINS of 2012!!!

Tolerance of positional error for BOLTS was +/- 10 mm

Page 33: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

BUILDING ERECTION : FIRST TIME RIGHT

All measurements, markings, validations on-site ca rried out using TRIMBLE Robotic ETS.All data transferred live (with a 2 hour delay) to PUNE (HQ) for processing.Validated using AUTODESK 3D Civil and IDS suites

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

Available live on web-enabled communicators to all stake-holders. Integrated with billing and MIS within 24 hours of validation.

Page 34: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

Key functional aspects that were introduced in the system (after extensive consultations with the stake-holders):

• Same data delivered to users (mgmt, accounts, billing, site engineers, contractors, etc) in formats understood by them.

• Live updates enabled. • Central data repository and processing enabled

accuracy, interoperability and integrity.

Success enablers :

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

accuracy, interoperability and integrity.

Worked as Game changers, making the system a MISSION CRITICAL DECISION SUPPORT SYSTEM

Page 35: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

� INFORM

� DEMONSTRATE

� CO-OPERATE

WAY AHEAD …….

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

� CO-OPERATE

� SYNERGISE

� STANDARDISE

� INTEGRATE

Page 36: Geoinformatics Infrastructure › 2013 › pdf › Vivek Kale.pdf · 2014-04-14 · Chainage 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2.600 2.800

THANK YOU FOR YOUR ATTENTION

Copyright © 2013 Kalyani GROUP. All rights reserved. All information is strictly confidential.

May you have a thumping 2013.