jelsa project 25.06.2009. primary crusher – 2.600 t/h feed from two sides 25.06.2009

15
Jelsa Project 25.06.2009

Upload: keegan-thaxter

Post on 31-Mar-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009

Jelsa Project

25.06.2009

Page 2: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009

Primary Crusher – 2.600 t/h feed from two sides

25.06.2009

Page 3: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009

Material flow from PPP to SPP – mostly direct feed

Page 4: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009

Secondary plant – Building Ensemble

Page 5: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009

Tertiary plant feed stock – Total 250.000 tons for 5 process days

Page 6: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009

Tertiary Screening + Crushing – Compact Design

Page 7: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009

Crusher Building

Page 8: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009

Screening Building – 2 parallel processing lines

Page 9: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009

Wet Sand – Free loading access from all sides

Page 10: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009

Dry Sand – Dust reduction through complete covering

Page 11: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009

Stock Area – 500.000 tons on 2 x 450m tunnels possible

Page 12: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009

Stacker – Flexible two arm stock feeding

Page 13: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009

Off-Shore stock – 150.000 tons for 4 vessels

Page 14: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009

Shiploader – High flexibility for short ship loading time

Page 15: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009