Page 1: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

Vernon L. Davis Contractor Liaison

The Pennsylvania State UniversityOffice of Physical Plant

SEDA COG NOV 2015

Page 2: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

2

Penn State Campuses

Page 3: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

Contracting Methods

Contract Administration Projects

Design & Construction

Construction&

Construction Related Projects

1-C

Contract Administration Projects2-C

CM

JOC

Construction Management Projects

Job Order Contracting

Page 4: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

4

Contracting Methods Overview

• CA 1-C– Projects with in-depth scope

– Projects typically over $250K

– Prequalification Required for Prime Bidders

– Advertised on Web

• CA 2-C / PO– Projects with lighter scope

– Projects typically under $500K

– Prequalification typically not required

– Not Advertised

• CM– Multiple bid packages

– Typically largest project

– Prequalification Required for Prime Bidders

– Advertised on Web

• JOC– New contracting method

– Contractor(s) already in-place

– Prequalification typically not required

– Not Advertised

Page 5: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

5

Contract Administration 2-C• How Does It Work?

– Any general construction service (labor and material) valued between $25,000 and $500,000 and handled by Project Managers / Assistant Project Managers / Project Coordinators

• Project Leader in conjunction w/Contract Administration solicit minimum 3 bidders

• DBE contractors are added if not present (M/W/V)

• Project is bid electronically via Quest CDN

• Winning contractor signs 2C-Contracthttp://opp.psu.edu/planning-construction/design_and_construction_standards/documents/2-c-form-of-agreement-4-2015-sample/view

Page 6: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

6

How Can I Get Involved (2-C)

Network with the Penn State Project Managers and Project Coordinators

Visit the campus and make your presence known

Remember projects are not advertised

Network Network Network!!!!

Page 7: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

7

Purchase Order (Non-Construction Related)

• How Does It Work?– Projects < $10K

• No Competitive Bidding Necessary

• Each Campus can solicit their own bids. Do not have to bid through Purchasing Agent

– $10K < Projects < $25K• Competitive Bidding

• Each Campus can solicit their own bids. Do not have to bid through Purchasing Agent

– $25K < Projects < $250K• Competitive Bidding

Page 8: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

Certificate of Insurance

Page 9: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

9

How Can I Get Involved (PO’s)

• How do I get Involved? Network with the Penn State Project Purchasing

Agents

Visit the campus and make your presence known

Remember projects are not advertised

Network Network Network!!!!

Page 10: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

10

Job Order Contracting (JOC)

• How Does It Work?– Five Contractors have been selected based upon

proposals submitted

•G.M. McCrossin

•SP McCarls

•TMG Builders

•HRI

•Leonard S. Fiore

Page 11: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

11

How Can I Get Involved (JOC)G.M.McCrossinBusiness Address:                           2780 Benner Pike, Bellefonte, PA 16823Area of Specialty/Focus:               General Construction/Mechanical/ElectricalContact Name:                                 Bill Waugh(JOC Contact)Phone:                                              814-574-0081(Bill’s Cell) 814-355-4848(Office)E-mail:                                             [email protected]

S.P. McCarl & Company, Inc.Business Address:                           2221 Ninth Avenue   Altoona, PA   16602Area of Specialty/Focus:               Mechanical/HVAC ConstructionContact Name:                                  Craig DeckerPhone:                                               814-329-1018Email:                                               [email protected]

•TMG Builders, Inc.

•Business Address:                           P.O. Box 806   Bellefonte, PA   16823

•Area of Specialty/Focus:               General Construction

•Contact Name:                                  Randy Laslow

•Phone:                                               814-280-3854

•Email:                                                [email protected]

•                                                          [email protected]

Page 12: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

12

How Can I Get Involved (JOC)HRI, Inc.Business Address:                           1750 W. College Ave.   State College, PA   16801Area of Specialty/Focus:               Site & Civil ConstructionContact Name:                                  Kristin SewellPhone:                                               814-571-4522Email:                                               [email protected]

Leonard S. Fiore, Inc.Business Address:                           5506 6th Avenue   Altoona, PA  16602Area of Specialty/Focus:               General ConstructionContact Name:                                  Jeffrey LucasPhone:                                               814-880-0287Email:                                               [email protected]                                                         [email protected]

Page 13: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

13

Homepage – www.opp.psu.edu

Page 14: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

14

Contract Administration (CA)

• How Does It Work?– Projects are released for bid

– Prequalified Contractor submit bid

– PSU makes award

Page 15: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

15

How Can I Get Involved (CA)

• Do you plan to bid as a Prime Bidder? Get prequalified Visit Website for Projects Out to Bid Review/purchase bid documents Attend Prebid meeting Bid the work

• Are you a subcontractor or supplier Network with the potential prime bidders Attend Prebid meeting Review/purchase bid documents Submit quotes to prime bidders

Page 16: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

16

Construction Management (CM)• How Does It Work?

– PSU hires CM Firm

– CM Firm breaks project down into several bid packages

– CM Firm prequalify contractors (except for Asbestos, Demo/Hauling, & Telecom)

– Project is broken down into multiple packages for awarded

Page 17: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

17

CM Projects

Project Link

Page 18: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

18

How Can I Get Involved (CM)

• Do you plan to bid as a Prime Bidder? Get prequalified per requirements in specification Visit Website for Projects Out to Bid Review/purchase bid documents ATTEND PREBID MEETING Bid the work

• Are you a subcontractor or supplier Network with the potential prime bidders ATTEND PREBID MEETING Review/purchase bid documents Submit quotes to prime bidders

Page 19: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

19

Architect SelectionMinor Construction?

Projects Under $1M

Project Leader makes selection Projects $1M - $4.9M

RFP Issued Long list to short list

Interviews

Selection Process (Project Leader, Univ Architect, & User Group)

•Major Construction Projects >$5M

Letter of Interest, Long list, Short List, & Interviews Screening Committee (Univ Arch., Dir Campus Planning

& Design, Project Leader, Dir. SALA, User Group)

Page 20: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

20

Architect Selection• Major Construction

Letter of Interest - Posted on website Screening Committee creates long list RFP is posted identifying long listed firms Screening Committee creates short list for interviews Screening Committee ranks short listed firms and makes

recommendation to BOT for selection

Page 21: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

21

Contacts

Vernon L. Davis, Contractor Liaison Phone: (814) 863-2520 / Email: [email protected]

Todd Webber, Construction & Contract Specialist Phone: (814) 865-6876/ Email: [email protected]

Jesse Wells, Facilities Contract Admin Specialist Phone: (814) 863-3807/ Email: [email protected]

RustyAnn Echard, Facilities Contract Admin Specialist Phone: (814) 865-1331/ Email: [email protected]

Page 22: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015

22