Vernon L. Davis Contractor Liaison
The Pennsylvania State UniversityOffice of Physical Plant
SEDA COG NOV 2015
![Page 2: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/2.jpg)
2
Penn State Campuses
![Page 3: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/3.jpg)
Contracting Methods
Contract Administration Projects
Design & Construction
Construction&
Construction Related Projects
1-C
Contract Administration Projects2-C
CM
JOC
Construction Management Projects
Job Order Contracting
![Page 4: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/4.jpg)
4
Contracting Methods Overview
• CA 1-C– Projects with in-depth scope
– Projects typically over $250K
– Prequalification Required for Prime Bidders
– Advertised on Web
• CA 2-C / PO– Projects with lighter scope
– Projects typically under $500K
– Prequalification typically not required
– Not Advertised
• CM– Multiple bid packages
– Typically largest project
– Prequalification Required for Prime Bidders
– Advertised on Web
• JOC– New contracting method
– Contractor(s) already in-place
– Prequalification typically not required
– Not Advertised
![Page 5: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/5.jpg)
5
Contract Administration 2-C• How Does It Work?
– Any general construction service (labor and material) valued between $25,000 and $500,000 and handled by Project Managers / Assistant Project Managers / Project Coordinators
• Project Leader in conjunction w/Contract Administration solicit minimum 3 bidders
• DBE contractors are added if not present (M/W/V)
• Project is bid electronically via Quest CDN
• Winning contractor signs 2C-Contracthttp://opp.psu.edu/planning-construction/design_and_construction_standards/documents/2-c-form-of-agreement-4-2015-sample/view
![Page 6: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/6.jpg)
6
How Can I Get Involved (2-C)
Network with the Penn State Project Managers and Project Coordinators
Visit the campus and make your presence known
Remember projects are not advertised
Network Network Network!!!!
![Page 7: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/7.jpg)
7
Purchase Order (Non-Construction Related)
• How Does It Work?– Projects < $10K
• No Competitive Bidding Necessary
• Each Campus can solicit their own bids. Do not have to bid through Purchasing Agent
– $10K < Projects < $25K• Competitive Bidding
• Each Campus can solicit their own bids. Do not have to bid through Purchasing Agent
– $25K < Projects < $250K• Competitive Bidding
![Page 8: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/8.jpg)
Certificate of Insurance
![Page 9: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/9.jpg)
9
How Can I Get Involved (PO’s)
• How do I get Involved? Network with the Penn State Project Purchasing
Agents
Visit the campus and make your presence known
Remember projects are not advertised
Network Network Network!!!!
![Page 10: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/10.jpg)
10
Job Order Contracting (JOC)
• How Does It Work?– Five Contractors have been selected based upon
proposals submitted
•G.M. McCrossin
•SP McCarls
•TMG Builders
•HRI
•Leonard S. Fiore
![Page 11: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/11.jpg)
11
How Can I Get Involved (JOC)G.M.McCrossinBusiness Address: 2780 Benner Pike, Bellefonte, PA 16823Area of Specialty/Focus: General Construction/Mechanical/ElectricalContact Name: Bill Waugh(JOC Contact)Phone: 814-574-0081(Bill’s Cell) 814-355-4848(Office)E-mail: [email protected]
S.P. McCarl & Company, Inc.Business Address: 2221 Ninth Avenue Altoona, PA 16602Area of Specialty/Focus: Mechanical/HVAC ConstructionContact Name: Craig DeckerPhone: 814-329-1018Email: [email protected]
•TMG Builders, Inc.
•Business Address: P.O. Box 806 Bellefonte, PA 16823
•Area of Specialty/Focus: General Construction
•Contact Name: Randy Laslow
•Phone: 814-280-3854
•Email: [email protected]
![Page 12: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/12.jpg)
12
How Can I Get Involved (JOC)HRI, Inc.Business Address: 1750 W. College Ave. State College, PA 16801Area of Specialty/Focus: Site & Civil ConstructionContact Name: Kristin SewellPhone: 814-571-4522Email: [email protected]
Leonard S. Fiore, Inc.Business Address: 5506 6th Avenue Altoona, PA 16602Area of Specialty/Focus: General ConstructionContact Name: Jeffrey LucasPhone: 814-880-0287Email: [email protected] [email protected]
![Page 13: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/13.jpg)
13
Homepage – www.opp.psu.edu
![Page 14: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/14.jpg)
14
Contract Administration (CA)
• How Does It Work?– Projects are released for bid
– Prequalified Contractor submit bid
– PSU makes award
![Page 15: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/15.jpg)
15
How Can I Get Involved (CA)
• Do you plan to bid as a Prime Bidder? Get prequalified Visit Website for Projects Out to Bid Review/purchase bid documents Attend Prebid meeting Bid the work
• Are you a subcontractor or supplier Network with the potential prime bidders Attend Prebid meeting Review/purchase bid documents Submit quotes to prime bidders
![Page 16: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/16.jpg)
16
Construction Management (CM)• How Does It Work?
– PSU hires CM Firm
– CM Firm breaks project down into several bid packages
– CM Firm prequalify contractors (except for Asbestos, Demo/Hauling, & Telecom)
– Project is broken down into multiple packages for awarded
![Page 17: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/17.jpg)
17
CM Projects
Project Link
![Page 18: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/18.jpg)
18
How Can I Get Involved (CM)
• Do you plan to bid as a Prime Bidder? Get prequalified per requirements in specification Visit Website for Projects Out to Bid Review/purchase bid documents ATTEND PREBID MEETING Bid the work
• Are you a subcontractor or supplier Network with the potential prime bidders ATTEND PREBID MEETING Review/purchase bid documents Submit quotes to prime bidders
![Page 19: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/19.jpg)
19
Architect SelectionMinor Construction?
Projects Under $1M
Project Leader makes selection Projects $1M - $4.9M
RFP Issued Long list to short list
Interviews
Selection Process (Project Leader, Univ Architect, & User Group)
•Major Construction Projects >$5M
Letter of Interest, Long list, Short List, & Interviews Screening Committee (Univ Arch., Dir Campus Planning
& Design, Project Leader, Dir. SALA, User Group)
![Page 20: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/20.jpg)
20
Architect Selection• Major Construction
Letter of Interest - Posted on website Screening Committee creates long list RFP is posted identifying long listed firms Screening Committee creates short list for interviews Screening Committee ranks short listed firms and makes
recommendation to BOT for selection
![Page 21: Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015](https://reader035.vdocuments.us/reader035/viewer/2022062322/5697bfa01a28abf838c951be/html5/thumbnails/21.jpg)
21
Contacts
Vernon L. Davis, Contractor Liaison Phone: (814) 863-2520 / Email: [email protected]
Todd Webber, Construction & Contract Specialist Phone: (814) 865-6876/ Email: [email protected]
Jesse Wells, Facilities Contract Admin Specialist Phone: (814) 863-3807/ Email: [email protected]
RustyAnn Echard, Facilities Contract Admin Specialist Phone: (814) 865-1331/ Email: [email protected]