uthmaniyah co2-eor demonstration project · pdf file4 • the 1st in the kingdom •...

15
Uthmaniyah CO 2 -EOR demonstration project KHALED AL BURAIK SAUDI ARAMCO

Upload: hakien

Post on 19-Mar-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Uthmaniyah CO2-EOR demonstration project · PDF file4 • The 1st in the Kingdom • Largest of its kind in the Middle East • Capture ~800,000 tonnes of CO2 per year • CSLF recognized

Uthmaniyah CO2-EOR demonstration project

KHALED AL BURAIK

SAUDI ARAMCO

Page 2: Uthmaniyah CO2-EOR demonstration project · PDF file4 • The 1st in the Kingdom • Largest of its kind in the Middle East • Capture ~800,000 tonnes of CO2 per year • CSLF recognized

2

Because we care

Page 3: Uthmaniyah CO2-EOR demonstration project · PDF file4 • The 1st in the Kingdom • Largest of its kind in the Middle East • Capture ~800,000 tonnes of CO2 per year • CSLF recognized

3

Reduce gas flaring

Energy efficiency

Zero discharge mandate

Renewables

Carbon management

Saudi Aramco environmental stewardship

Page 4: Uthmaniyah CO2-EOR demonstration project · PDF file4 • The 1st in the Kingdom • Largest of its kind in the Middle East • Capture ~800,000 tonnes of CO2 per year • CSLF recognized

4

• The 1st in the Kingdom

• Largest of its kind in theMiddle East

• Capture ~800,000 tonnes of CO2 per year

• CSLF recognized project

• Awarded “EOR Project of the Year” by Oil & Gas Middle East

Carbon managementUthmaniyah CO2-EOR demonstration project

Page 5: Uthmaniyah CO2-EOR demonstration project · PDF file4 • The 1st in the Kingdom • Largest of its kind in the Middle East • Capture ~800,000 tonnes of CO2 per year • CSLF recognized

5

CO2

Hawiyah NGL Plant(CO2 Capture Plant)

85 Km

Page 6: Uthmaniyah CO2-EOR demonstration project · PDF file4 • The 1st in the Kingdom • Largest of its kind in the Middle East • Capture ~800,000 tonnes of CO2 per year • CSLF recognized

6

Milestones

2006

2007

2008

2009

2010 2011

2012

2013

2014

2015

2016 20172018

Inception/Roadmap

Screening Studies

Lab Studies

Simulation Studies

Pilot Design

Drilling of Wells

Baseline Testing

M&S in Full Swing

CO2 injection started

Demonstration Project Evaluation

Page 7: Uthmaniyah CO2-EOR demonstration project · PDF file4 • The 1st in the Kingdom • Largest of its kind in the Middle East • Capture ~800,000 tonnes of CO2 per year • CSLF recognized

7

Our unique approachMonitoring & Surveillance

• Seismic monitoring

• Electromagnetic surveys

• Borehole and surface gravity

• Inter-well tracer tests

Our unique approachMonitoring & Surveillance

Seismic monitoring

Electromagnetic surveys

Borehole and surface gravity

Inter-well tracer tests

Page 8: Uthmaniyah CO2-EOR demonstration project · PDF file4 • The 1st in the Kingdom • Largest of its kind in the Middle East • Capture ~800,000 tonnes of CO2 per year • CSLF recognized

8

Monitoring & Surveillance

Monitoring Parameters:

Plume evolution

Oil saturation monitoring

Sequestered CO2

CO2 Migration

Page 9: Uthmaniyah CO2-EOR demonstration project · PDF file4 • The 1st in the Kingdom • Largest of its kind in the Middle East • Capture ~800,000 tonnes of CO2 per year • CSLF recognized

9

Monitoring & Surveillance

• Seismic sensors

1st continuous seismic monitoring

1000 seismic sensors

Tracks plume propagation

Page 10: Uthmaniyah CO2-EOR demonstration project · PDF file4 • The 1st in the Kingdom • Largest of its kind in the Middle East • Capture ~800,000 tonnes of CO2 per year • CSLF recognized

10

Monitoring & Surveillance

• Seismic sensors

• Cross-well Electromagnetic

CO2 plume betweentwo wells

Page 11: Uthmaniyah CO2-EOR demonstration project · PDF file4 • The 1st in the Kingdom • Largest of its kind in the Middle East • Capture ~800,000 tonnes of CO2 per year • CSLF recognized

11

Monitoring & Surveillance

• Seismic sensors

• Cross-well Electromagnetic

• Borehole and surface gravity

track CO2 plume in the reservoir

detect inadvertent CO2leakage into shallow

aquifers

Page 12: Uthmaniyah CO2-EOR demonstration project · PDF file4 • The 1st in the Kingdom • Largest of its kind in the Middle East • Capture ~800,000 tonnes of CO2 per year • CSLF recognized

12

Monitoring & Surveillance

• Seismic sensors

• Cross-well Electromagnetic

• Borehole and surface gravity

• Tracers

CO2 flow path and breakthrough speed

Page 13: Uthmaniyah CO2-EOR demonstration project · PDF file4 • The 1st in the Kingdom • Largest of its kind in the Middle East • Capture ~800,000 tonnes of CO2 per year • CSLF recognized

13

Intelligent Project

24/7Real-Time

Monitoring by highly

qualified ExpertsWells are Intelligent

Field compliant

Monitor and ControlIntelligent Field Center

Data routed toGOSP

Page 14: Uthmaniyah CO2-EOR demonstration project · PDF file4 • The 1st in the Kingdom • Largest of its kind in the Middle East • Capture ~800,000 tonnes of CO2 per year • CSLF recognized

Out of the box innovationOut of the box innovationDisruptive TechnologyDisruptive Technology

Carbon managementUthmaniyah CO2-EOR demonstration project

Page 15: Uthmaniyah CO2-EOR demonstration project · PDF file4 • The 1st in the Kingdom • Largest of its kind in the Middle East • Capture ~800,000 tonnes of CO2 per year • CSLF recognized

15

“I believe there isenough technologyto sequester CO2and to take CO2out of theatmosphere.”

H.E. Ali Al-Naimi