us20 cag3 presentation draft 091018 pptx...us20_cag3_presentation_draft_091018_pptx created date...

62
Welcome Community Advisory Group Meeting 9/11/2018

Upload: others

Post on 11-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

WelcomeCommunity Advisory Group Meeting

9/11/2018

Page 2: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

2

Introductions and Project Overview IL 31 UpdateRoadway Improvements• Nesler Road to Old Barn Road• Longcommon Parkway• Grace St. Interchange• Fox River Bridge Other Project Components• Noise Analysis• Drainage Improvements• Multi-use Trail • Right-of-way Acquisition• Cost EstimateNext StepsSmall Group Discussion

Meeting Agenda

Page 3: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Introductions

3

Page 4: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Resources 4

Website: us20elginstudy.com

Page 5: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Project Overview

5

Page 6: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Study Area 6

Page 7: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

7Existing Average Daily Traffic Volumes

Page 8: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM
Page 9: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM
Page 10: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM
Page 11: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

11

Page 12: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Phase I• Preliminary engineering • Environmental studies

TIMELINE2013-2018

Phase II*• Contract plan preparation• Right-of-way acquisition

TIMELINESchedule to be determined. *Phase II for the IL 31 bridge replacement over US 20 is scheduled to begin in 2018. Phase II for the full US 20 corridor is not currently included in the Department’s FY 2019-2024 Proposed Multi-Modal Transportation Improvement Program.

Phase III**• ConstructionTIMELINESchedule to be determined. **Construction of the IL 31 bridge replacement over US 20 is scheduled to begin in 2022. Phase III for the remainder of the US 20 corridor is not currently included in the Department’s FY 2019-2024 Proposed Highway Improvement Program.

Project Schedule 12

= We Are here

Page 13: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Phase I Milestones 13

Page 14: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Public Information Meeting #1October 29, 2013

Majority of the comments received were related to safety, noise, and congestion.

14

48People attended the meeting

10Comment forms were submitted

20People signed up to join the CAG

Page 15: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

CAG Meeting #1February 20, 2014

15

At the first meeting, the following issues and concerns were identified:• Safety • Bike/pedestrian facilities• Economic development• Public transportation• Environmental/community areas

to preserve

Page 16: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

PROBLEM STATEMENTTransportation problems along US 20 from Randall Road to Shales Parkway include safety, mobility, and access for all transportation modes. There is a lack of efficient access for emergency vehicles, and there are limited non-motorized crossings and connections. Providing opportunity areas for aesthetic treatments to enhance economic opportunities is also important. Improvement alternatives are limited to maintenance activities.

16

Page 17: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

The purpose of the proposed improvement is to extend the service life of the US 20 mainline and bridges, enhance safety, and address mobility issues. In addition to serving the motoring public, the proposed action will also address the need for emergency vehicle access and safe access for pedestrians and bicyclists crossing the US 20 corridor.

17

PURPOSE AND NEED STATEMENT

Page 18: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

CAG Meeting #2December 2, 2014

18

At the second meeting, we discussed:• The Problem statement and

Purpose & Need statement• Evaluation criteria for roadway

segments and bridges• Potential improvements

Page 19: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

What has IDOT done since the last meeting?

19

• Completed the Phase I study for the IL 31 bridge near US 20. • A concept for a new Fox River Bridge has been developed.• A noise study was completed for the US 20 project.• Minor design revisions throughout the study area

Page 20: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Illinois Route 31 Update

Page 21: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

IL 31 (State St.)

Page 22: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

IL 31 (State St.)

Page 23: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

The project is included in the Department’s FY 2019-2024 Proposed Multi-Modal Transportation Improvement Program.

23IL 31 (State St.)

ESTIMATED CONSTRUCTION COST $10.6 M

Alternative 3, presented at CAG #2, is the approved alternative.

Page 24: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

New dedicated turn lanes from IL 31 to rampsNew shared use path on the west side of bridgeAccommodates future widening and shoulders on US 20

24IL 31 (State St.)

IMPROVEMENTS

1

2

3

IL 31 Bridge Replaced1

2

1

1

13 US 20

Page 25: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

25IL 31 (State St.)

Page 26: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

26IL 31 (State St.)

Page 27: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

27IL 31 (State St.)

Three types of land acquisition:

• Fee Simple– Acquisition of all rights and interest

• Permanent Easement• Ownership retained by property owner• IDOT allowed permanent use of property to construct

and maintain facilities• Temporary Easement

• Ownership retained by property owner• Temporary use to construct minor improvements

Determine Ownership

Prepare Plat of Survey

Prepare Independent Appraisal

Negotiations with Property Owners

Court Proceedings if Necessary

Page 28: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

28IL 31 (State St.)Right-of-Way AcquisitionROW Acquisition shown in yellow • Four parcels (0.81

acres) in the SW and SE quadrants

• Includes 690’ long by 30’ wide strip (0.48 acres) for new sewer in SE quadrant

• No buildings will be acquired

Temporary construction easements shown in blue• Ten parcels (0.43 acres)

in all four quadrants

Page 29: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

29IL 31 (State St.)Right-of-Way AcquisitionROW Acquisition shown in yellow • 690’ long by 30’ wide strip

(0.48 acres) for new sewer • Two parcels in SW quadrant

(0.30 acres) • One parcel in SE quadrant

(0.02 acres)• No buildings will be acquired

Temporary construction easements shown in blue• One parcel (0.21 acres) in SE

quadrant • Two parcels in SW quadrant

(0.13 acres)

Page 30: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

30IL 31 (State St.)Right-of-Way AcquisitionTemporary construction easements shown in blue• Six parcels (0.07 acres) on

the east side of IL 31• One parcel (0.02 acres) on

the west side of IL 31

Page 31: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

US 20 Roadway Improvements

31

Page 32: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

32

Nesler Rd. to Old Barn Rd.IMPROVEMENTS

Right turn lane from US 20 to Nesler Rd

1

1

BP

Page 33: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

33

IMPROVEMENTS

Right turn only from SB Weld Rd. to US 20

“Restricted Crossing U-Turn” (RCUT) for SB to EB traffic. Also known as “Michigan Left.”

Free flow right turn lane from LongcommonPkwy. to EB US 20

1

2

2

3

1

3

Longcommon Pkwy./Weld Rd.

US 20

Weld

RdLo

ngco

mmon

Pkwy

Page 34: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Benefits of proposed Restricted Crossing U-Turn (RCUT) movement • The design improves safety and access by separating turning conflicts into

two parts:– Right turn from SB Weld only requires gaps in WB traffic– U-turn to EB US 20 only requires gaps in EB traffic

• Maintains traffic flow on US 20• Between 80% to 90% of SB vehicles currently turn right at the intersection

34

Longcommon Pkwy./Weld Rd.

Page 35: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Apex, NC

35

RCUT Examples

Page 36: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Vass, NC

36

RCUT Examples

Page 37: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Loris, SC

37

RCUT Examples

Page 38: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Alternate Route• Traffic from neighborhood can

continue to use Randall Road interchange to access EB US 20

38

Longcommon Pkwy./Weld Rd.

Page 39: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

39US 20 over Fox River

New bridge over Fox River.New auxiliary lanes between IL 31 and IL 25New shared use path over Fox RiverNew shoulders from IL 31 to Grace St provide improved safety and space for emergency vehicles.

IMPROVEMENTS1

1

2

3

4

2

34US 20

Fox R

iver

Page 40: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

40

Benefits of new bridge• Replacing a structure originally constructed in 1961• Increased mobility across river• Pedestrian and bicycle access across river• Two lanes in each direction maintained during construction

US 20 over Fox River

Page 41: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

41

Grace St. Interchange

IMPROVEMENTS

Widen bridge over Raymond St.Extend deceleration lane lengths at Grace St. and Illinois Ave.Extend acceleration lane lengths at Grace St. and Lavoie Ave.

1

2

1

3

23US 20 Gr

ace S

t

Bluff City BlvdSt.

Charl

es S

t

Raym

ond

St

Page 42: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Other Project Components

42

Page 43: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Noise Analysis

43

Page 44: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Noise Analysis44

Traffic noise regulations guide everything we do for our noise analyses. The Federal Highway Administration’s traffic noise regulations are the basis of every state’s individual traffic noise policies and guidance. The IDOT Highway Traffic Noise Assessment Manual is our state’s guidance document for traffic noise work.Manual can be found online at www.idot.illinois.gov

Page 45: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Noise Analysis45

MEASUREexisting noise levels at 13 locations representing 52 “receptors”

PREDICTfuturenoise levels

DETERMINEnoise impacts

CONSIDERnoise walls

The Process

Page 46: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Noise Analysis46

The Outcome

11 noise walls were found to be reasonable and feasible for the corridor.• See exhibit for potential locations • View points from the community on the 11 identified noise walls will be

collected during Phase II design.

Page 47: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Noise Analysis47

Sample noise walls

Page 48: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Multi-use Trail

48

Page 49: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Multi-use Trail

A 5.4-mile long route connecting the southwest side of the City, to the Elgin Sports Complex, and downtown. The IL 31 Bridge will create a connection to Marie GroelichPark and new US 20 Bridge over the Fox River.

49

Bikeway Route 4

The City of Elgin identified several priority bike routes as part of their Bicycle Master Plan.

Page 50: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Right-of-Way Acquisitionand Easements

50

Page 51: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Right-of-Way and Easements51

East of Nesler Rd.

0.11 acres of ROW for drainage

1

1US 20

Page 52: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Right-of-Way and Easements52

1

Page 53: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Right-of-Way and Easements53

West of LongcommonPkwy.

0.31 acres of temporary construction easements

1

1 US 20

Weld

RdLo

ngco

mmon

Pkwy

Page 54: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Right-of-Way and Easements54

West of Longcommon Pkwy.0.31 acres of temporary construction easements 1

US 20

Weld

RdLo

ngco

mmon

Pkwy

1

Page 55: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Right-of-Way and Easements55

IL 31 to Fox River0.95 acres of temporary construction easement in Marie Grolich Park for grading1

Marie GroelichPark

1

Page 56: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Right-of-Way and Easements56

Fox River to Grace St0.33 acres of ROW for bridge widening

1

2 0.36 acres of temporary easement for grading

US 20

Grac

e St

Raym

ond

St1

1

2

22

Page 57: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Cost Estimate

57

Page 58: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Cost Estimate

The proposed roadway improvements include the replacement of the Fox River Bridge, and rehabilitation of other bridges.

58

ESTIMATED CONSTRUCTION COST

$80 M FUNDING

Phase II and III are currently not funded

Page 59: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Next Steps

59

Page 60: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Next Steps1

60

Finalizerecommended alternatives.Informcommunity of upcoming public meeting.Presentalternatives at next public meeting.

2

3

Page 61: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Small Group Discussion

61

Page 62: US20 CAG3 Presentation DRAFT 091018 pptx...US20_CAG3_Presentation_DRAFT_091018_pptx Created Date 9/13/2018 3:14:42 PM

Thank You

62