timesheet(mar 2012)
DESCRIPTION
Time sheets for SabickTRANSCRIPT
Issue date:20/01/08Rev.0
Time sheet for the Month of : Mar-2012 Affilliate: Vendor: Dar Al-Riyadh
CONTRACTOR EMPLOYEE NAME : Mahmood Ahmad Bhatti(B-351) DEPARTMENT : Process Engineering
BADGE NO. : C58119 COST CENTER : 1504001
JOB TITLE : Process Engineer P.O NO : 4800741702
Day Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed |Thu Fri Sat
Date 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 29 30
Reg.HR 8 0 8 8 8 8 8 8 0 8 8 8 8 8 8 0 8 8 8 8 8 8 0 8 8 8 8 8 8 0 8 208 208
00
0
Leaves
Legends Leave type : Sick leave (SL) , annual leave (AN) Unauthorized leave (UNL)
Mahmood A. Bhatti Date : Approved by :Name A.H. Al-Qahtani Job Title: Process Mgr Date:
Signature Signature
Remark (if any)
SES NO : PO LINE ITEM :
PO NO. SES AMOUNT :
F/P NAME : TEL. NO.: SIGN
Total HRS
GrandTotalHRS
OT(150%)
OT(200%)
Prepared by :Name:
NOTE: * Approved time sheets must be submitted to the Focal Point with all required information above on the last working day ( every month)
This section to be completed & evaluated by SABIC focal point then submitte to Vendor Representative