thesill bldgservices scheme design

Upload: stanjack99

Post on 05-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/16/2019 Thesill Bldgservices Scheme Design

    1/23

    Planning Application for the demolition of existing National Park Visitor Centre (D1),

    Offices (B1), Retail (A1) and Café (A3) and 79 bed Youth Hostel (Sui Generis) andassociated car parking, and redevelopment of site as new Landscape DiscoveryCentre incorporating Exhibition Space (D1), Retail (A1), Café (A3), Offices (B1) and86 bed Youth Hostel (Sui Generis) together with 87 Permanent Car Parking Spaces,93 Overflow car parking spaces, associated landscaping, substation and crossing

    The Sill 

  • 8/16/2019 Thesill Bldgservices Scheme Design

    2/23

     

    Building Services Scheme Design

    RIBA Stage D

    The Sill

    Document: 473949-RPT-004-P1 

    Northumberland National ParkAuthority

    December 2013

    This document has been issued and amended as follows:

    Version Date Description Created by Verified by Approvedby

    P0 16/12/13 P S D R T H

    S

    D D

    P1 19/12/13 P S D R T H

    S

    D D

    Contents

    1.1  Design Approach 1 

    1.2  Utilities & Incoming Supplies 2 

    1.3  Load Assessment 3 

    1.4 

    Mechanical 4 

    1.5  Plumbing and Drainage 10 

    1.6  Electrical 11 

    1.7  Sustainability Strategy 17 

    1.8  BREEAM 18 

    1.9  Energy Strategy 18 

    1.10  Codes & Standards 21 

  • 8/16/2019 Thesill Bldgservices Scheme Design

    3/23

    T S MEP S D R

    1

    1 Building Services

    1.1 Design Approach

    IntroductionT B S E

    .

    I B S S D

    B S .

    T

    B S .

    T

    .

    Project Description

    T S L D C HA H. T

    2,500

    N N P H W H S.

    T 79 O B H N

    P C :

        / ( ), , , ,

    ;

        AV

    ;

        ;

        28 , , , ,

    .

        , , ;

        L/ .

    E N N P C O B

  • 8/16/2019 Thesill Bldgservices Scheme Design

    4/23

  • 8/16/2019 Thesill Bldgservices Scheme Design

    5/23

  • 8/16/2019 Thesill Bldgservices Scheme Design

    6/23

  • 8/16/2019 Thesill Bldgservices Scheme Design

    7/23

  • 8/16/2019 Thesill Bldgservices Scheme Design

    8/23

  • 8/16/2019 Thesill Bldgservices Scheme Design

    9/23

  • 8/16/2019 Thesill Bldgservices Scheme Design

    10/23

  • 8/16/2019 Thesill Bldgservices Scheme Design

    11/23

    T S MEP S D R

    9

    AHU Ventilation Systems

    E CO2 . W

    , AHU .

    F / . A

    .

    T

    .

    Plant Replacement Strategy

    A ,

    . A

    .

  • 8/16/2019 Thesill Bldgservices Scheme Design

    12/23

  • 8/16/2019 Thesill Bldgservices Scheme Design

    13/23

  • 8/16/2019 Thesill Bldgservices Scheme Design

    14/23

  • 8/16/2019 Thesill Bldgservices Scheme Design

    15/23

  • 8/16/2019 Thesill Bldgservices Scheme Design

    16/23

  • 8/16/2019 Thesill Bldgservices Scheme Design

    17/23

  • 8/16/2019 Thesill Bldgservices Scheme Design

    18/23

  • 8/16/2019 Thesill Bldgservices Scheme Design

    19/23

    T S MEP S D R

    17

    1.7 Sustainability Strategy

    H G L RIBA S A

    BREEAM , , T S P

    H W N N P. O

    , BREEAM E , NNPA D G SPD S

    D.

    T H

    , .

    T S S C S P 1

    . T

    :

    1.  C N P.

    2.  M , , .

    3.  P

    N P.

    4.  P

    .

    5.  R ,

    .

    6.  D

    .

    7.  P , ,

    .

    8.  C .

    T BREEAM E

    .

    F S S, RIBA S D, T S P, D:473949D003 V: 1, .

    A .

    S

    S

    S

    S

    BREEAM AP

    & I S

    D G SPD

    (NNPA)

    BREEAM

    P

    A

    S D

    S C

  • 8/16/2019 Thesill Bldgservices Scheme Design

    20/23

    T S MEP S D R

  • 8/16/2019 Thesill Bldgservices Scheme Design

    21/23

    T S MEP S D R

    19

    PV Panels

    T PV CO2 

    . T PV

    PV .

    PV S D .

    T S R .  

    Biomass Boilers

    B

    . T

    , , . T

    .RHI . A 20

    500,000 20 .

    B S D.

    T S P S D D E

    Solar Thermal Panels

    S . I

    12 13%

     .

    S RHI . B 47,000 20 .

    S .

    S W H

    Summary

    B S D

    :

    T E R (TER) 18.5 CO2/ 2

    B E R (BER): 12.8 CO 2/ 2

    T P L 2010 R.

    A 30% (BER/TER)

    BREEAM E .

    I 45 . T

    10% .

    T S MEP S D R

  • 8/16/2019 Thesill Bldgservices Scheme Design

    22/23

    T S MEP S D R

    20

    T S T S E , PV

    F E S, D: 473949D001 V: 1, T S

    D C, J 2014 S D

    .

                                                             

                            

                    

                                           

                 

                                

                                                           

                                                      

                       

                                        

                                                     

                 

                         

          

    T S MEP S D R

  • 8/16/2019 Thesill Bldgservices Scheme Design

    23/23

    T S MEP S D R

    21

    1.10 Codes & Standards

    General

    T B S .

    •  HA B G

    •  R L A

    o  E H D

    o  B C O

    •  B R P L2A 2010 L B W

    •  R B S C P

    •  L E CIBSE G

    •  17 E IET R

    •  CIBSE T M M

    •  H S W

    •  R C A A

    •  R

    •  COSHH (C S H H) R

    •  R E B.

      L E IOP G

    •  W B

    •  R F A F.O.C.

    •  T .

    o  T ( ) H S

      H (G) 70:1991

    o  T 1991.

    o  M TM13:1991