The Transition from ESTB to EGNOS: Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium Dr Javier Ventura-Traveset, ESA EGNOS PO, France Mr Cristoforo Montefusco, ESA EGNOS PO, France

Upload: others

Post on 25-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

The Transition from ESTB to EGNOS: Managing User Expectation

Dr Sally Basker, Helios Technology Ltd

Mr Giorgio Solari, ESA GISS, Belgium

Dr Javier Ventura-Traveset, ESA EGNOS PO, France

Mr Cristoforo Montefusco, ESA EGNOS PO, France

Page 2: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

2

Contents

! Introduction

! EGNOS and ESTB

! The Transition to EGNOS

! The User Experience

Page 3: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

3

Introduction

Page 4: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

4

EGNOS is nearing completion after six years of intense effort

1997

1998

1999

2000

2001

2002

2003

2004

2005

1997SystemDesignStarted

1998Preliminary

DesignReview

2002CriticalDesignReview

2004OperationalReadiness

Review

Today

ESTB has been developed in parallel as an EGNOS prototype providing pre-operational signals from February 2000

ESTBOperations

EGNOSOperations

Page 5: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

5

2003 is going to be a year of change and we need to ensure a smooth transition from ESTB to EGNOS

! We need to ensure that user perception meets user expectation in terms of performance

! User perception is driven by" signal broadcast by the geostationary (GEO) satellites" the wide area differential corrections (WAD) & integrity data

! The limiting factor here is the number of GEOs available for both systems

! We need to manage this transition so that users understand which GEO is being used by which system (ESTB or EGNOS) and the level of performance provided

Page 6: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

6

EGNOS and ESTB

!EGNOS

!ESTB

Page 7: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

7

EGNOS – the European GeostationaryNavigation Overlay Service - does what it says on the box!

! European coverage, standardised, and quality assured

! Broadcasts GPS look-alike signals from three GEOsatellites to augment GPS for navigation" 5m vertical, 1m horizontal" 6 second integrity time to alarm

! Highly compatible overlay to GPS so a single receiver and antenna can process GPS and EGNOS

! Services the needs of mission/safety critical users

Users will benefit from improved performance, removing the need for local-area differential in many cases

Page 8: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

8

The EGNOS architecture is highly redundant

! 34 RIMS – reference & integrity monitoring stations" each satellite has to be monitored by multiple RIMS before

corrections and integrity messages are generated

! 4 MCCs - mission control centres" one active and three hot spares

! 6 NLES – navigation land earth stations" one active and one hot spare per GEO

! Supporting infrastructure includes" PACF – performance assessment check-out facility" ASQF – application specific qualification facility

Page 9: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

-40 -30 -20 -10 0 10 20 30 4020

30

40

50

60

70

Longitude (°)

Latit

ude

(°)

AOR-EIOR

Artemis

RIMS

MCC

NLES

PACFASQF

LAN

GVL

ALB

HBK (South Africa)

ZUR

LAP

WRS

SCZ

ROMTOR

AUS

GON

RKK

PAR

KOU (French Guyana)

SWA

EGI

GLG

CRK

TRO

TRD

ACR MLG

PDM GOL

BRN

CNR

SDC

LSB

MAD

SOF

KIR

DJA

DAB

TLS

CTN

BNG (India)

NDH(Mauritania)

MON(Canada)

Page 10: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

10

The three GEOs provide triple coverage over Europe, the Mediterranean and Africa

Optimalperformance

Standardperformance

in GBA

Page 11: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

11

EGNOS and ESTB

!EGNOS

!ESTB

Page 12: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

12

The ESTB provides a pre-operational service and allows us to prepare both for EGNOS from 2004 and for Galileo later this decade

Page 13: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

13

The differences between ESTB and EGNOS for the same coverage area emphasise the pre-operational nature of the ESTB

YesNoService Guarantee

YesNoIntegrity

1m 95% throughout coverage area

1m 95% limited by RIMS densityAccuracy

62Number NLES

3412Number RIMS

41Number MCS

EGNOSESTBParameter

Page 14: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

14

The Transition to EGNOS

!Overview

!Signal Structure

!Using the GEO satellites

!RIMS Deployment

!SISNET

Page 15: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

15

We need to consider both the user and system needs during the transition period ! User expectation is performance specific while user

perception is driven by the quality of the WAD and integrity data received from the GEO satellites

! The WAD and integrity data quality are dependent on the distribution and density of the RIMS network

! ESA aims to ensure continuity of the ESTB service at least until EGNOS is declared operational, but at the same time it needs to deploy and test EGNOS

! The limiting factor is the number of GEOs available

It is crucial that users understand which GEO is being used by which system and the performance provided

Page 16: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

16

The Transition to EGNOS

! Overview

! Signal Structure

! Using the GEO satellites

! RIMS Deployment

! SISNET

Page 17: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

17

The EGNOS signal is similar to GPS and only slight modifications are required for a GPS receiver to track EGNOS

! Similar signal to GPS" Same frequency (1575.42 MHz) and ranging codes" Different data format (250 bps)

! Integrity" Coarse use / don’t use for all satellites (inc GEOs)" σ2

UDRE and σ2UIVE that are estimates of the errors remaining

after the WAD corrections used to compute error bounds

! WAD corrections" Separate terms for orbits, clocks and ionosphere" Fast and slow corrections for temporal de-correlation

Page 18: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

18

Cycle 2 Cycle 1

FS

EGNOSMCC

To Users

MessageSchedule

FS

Fast Corrections

Slow Corrections

PositionIntegrity

F S S S S F F S S S S F F S S S

GPS

Page 19: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

19

The EGNOS signal has three key benefits

! Compliant with international standards and interoperable with similar systems

! Design based on GPS" EGNOS range measurements enhance availability" EGNOS corrections can be used without purchasing an

additional receiver

! Provides enhanced accuracy and integrity

Page 20: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

20

Recent changes to the ESTB signal improve interoperability with other systems and allow all SBAS receivers to process ESTB

! SBAS Interoperability Working Group has developed SARPS1 for system developers and MOPS2 for receiver manufacturers

! Some initial confusion from test-messages" ESTB used Message Type 0 with all 0s" WAAS used MT2 data in MT 0

! Both approaches are allowed in the MOPS

! At 7:30 UTC on 1 April 2003 ESTB moved to the second format allowing all users equipped with GPS/SBAS receivers to benefit from ESTB & WAAS

1. Standards And Recommended Practices2. Minimum Operational Performance Standards

Page 21: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

21

The Transition to EGNOS

! Overview

! Signal Structure

! Using the GEO satellites

! RIMS Deployment

! SISNET

Page 22: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

22

AOR-E

IOR

ARTEMIS

IOR-W

July 03 October 03 December 03 April 04(ORR)

April 03

65.5° E, PRN 131

There are four GEOs currently available to support the transition from ESTB to EGNOS

EGNOSOperations

15.5° W, PRN 120

21.5° E, PRN 124

25° E, PRN 126

Page 23: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

23

The Transition to EGNOS

!Overview

!Signal Structure

!Using the GEO satellites

!RIMS Deployment

Page 24: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

24

RIMS deployment has been designed to deliver incremental improvements

! SIS 0 (Today) – end to end tests, message compliance, no performance objective" 6 RIMS, 1MCC, 1NLES

! SIS 1 (Q3 2003) – Level 2 performance (NPA/APV1)" 10-15 RIMS, 1MCC, 1NLES

! SIS 2 (Q4 2003) – Level 3 performance (APV2)" >25 RIMS, 2MCCs, 2NLES

HEALTH WARNING: all dates are preliminary and indicative, signals are subject to testing, do not use for operations until after ORR

Page 25: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

25

The Transition to EGNOS

! Overview

! Signal Structure

! Using the GEO satellites

! RIMS Deployment

! SISNET

Page 26: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

26

SISNeT solves EGNOS delivery problems in urban and other challenging environments

! Aviation and maritime users generally find it easy to maintain contact with the EGNOS GEOs to receive the WAD and integrity data

! It is far harder for land-mobile users because urban canyons block the GEO signals

! Critically, this is where EGNOS can bring real benefits to GPS" WAD corrections can deliver 10m (95%) with high

availability

Page 27: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

27

SISNeT allows users to access EGNOS in real-time over the internet

Page 28: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

28

It brings real benefits to users and can be accessed using mass market technology

! The EGNOS signal is available even if GEOs are not visible

! The data rate (< 1kbps) is ideal for GSM/GPRS

! An EGNOS receiver is not needed, only a link to the Internet

! Pedestrian or land mobile-users benefit from improved performance at higher mask angles

Page 29: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

29

The User Experience

! Receivers

! Expected performance

! Finding the latest information

Page 30: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

30

There are more than 120 receivers and 90 chipsets available – critically they must be compatible with the GPS/SBAS MOPS

! Receivers should be compatible with the GPS/SBAS MOPS (DO-229C)

! A WAAS receiver that is DO229-C will track EGNOS

! If you are in the EGNOS coverage area" Your receiver will track signals from other SBAS GEOs" Range measurements are valid if monitored by EGNOS" Only EGNOS WAD and integrity is valid

! Otherwise the receiver works normally" As an SBAS receiver if in SBAS coverage" As a GPS-only receiver elsewhere

Page 31: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

31

SBAS data processing is more complex than GPS

Estimate corrections for satellite clock and

ephemeris and the σσσσ2UDRE

Predict the ionospheric delay from the grid and

determine σσσσ2UIVE

WAD & Integrity Data

Correct the position solution

Compute a certified error bound (integrity)

Prudent users with commercial or safety critical applications will value the added confidence from EGNOS guaranteed services

Page 32: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

32

The User Experience

! Receivers

! Expected performance

! Finding the latest information

Page 33: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

33

The expected performance achievable from a specific GEO is dependent on the RIMS deployment and satellite/system selected

AOR-E

IOR

ARTEMIS

IOR-W

EGNOSOperations

Q3 2003 Q4 2003 Q1 2004

SIS - 1

SIS - 1

Q2 2003

SIS - 2

SIS - 2

SIS – 2

SIS – 2SIS - 0

ESTB

ESTB ESTB ESTB

ESTB/SIS - 2 ESTB/SIS - 2

Page 34: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

34

Expected EGNOS coverage for a high accuracy service (1m – 3m horizontal)

Page 35: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

35

Expected coverage for an APV service (equivalent to the current WAAS)

Page 36: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

36

The User Experience

! Receivers

! Expected performance

! Finding the latest information

Page 37: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

37

There are four ways for users to receive reliable and timely information

! ESA Helpdesk" Accessed through email

! ESA’s ESTB web pages" Links to EGNOS, ESTB, Galileo …

! EGNOS News" Hard copy, email circulation, download from web

! EGNOS CD ROM" Available here and from ESA

Page 38: The Transition from ESTB to EGNOS: Managing User Expectation 2003/ESTB... · Managing User Expectation Dr Sally Basker, Helios Technology Ltd Mr Giorgio Solari, ESA GISS, Belgium

38

Useful EGNOS-related links

[email protected] News

[email protected] ESTB Helpdesk

www.esa.int/SISNETESA SISNET Web Page

www.esa.int/ESTBESA ESTB Web Page

www.esa.int/EGNOSESA EGNOS Web Page

www.esa.int/navigationESA Navigation Web Page