FACET Status ESTB 2011 Workshop
Christine ClarkeMarch 17th 2011
![Page 2: FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d2d5503460f94a03c86/html5/thumbnails/2.jpg)
FACET StatusPage 2
The FACET Project
Facilities for Accelerator science and Experimental Test beams.
FACET
ESA
ESB
![Page 3: FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d2d5503460f94a03c86/html5/thumbnails/3.jpg)
Beam at FACET
FACET StatusPage 3
At IP
• FACET uses the first two-thirds of the linac• Energy = 23 GeV• 3.2 nC• Sigma x = 14 um• Sigma y = 6 um• Sigma z = 14 um minimum (20 um typical)• Bunch length can be increased up to a factor of 3• Electrons and positrons
![Page 4: FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d2d5503460f94a03c86/html5/thumbnails/4.jpg)
The Facility
FACET StatusPage 4
Stairway in Sector 19
User Trailer Experiments Dump
Towards end of linacBeam Direction
![Page 5: FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d2d5503460f94a03c86/html5/thumbnails/5.jpg)
Plan – THz and IP Tables
FACET StatusPage 5
• Optical Tables for experimenters to mount hardware
• Optics set up for each experiment• Small beam spots in IP region
THz Table (Experimental Area 1)
IP Table (Experimental Area 2)
Beam Direction
![Page 6: FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d2d5503460f94a03c86/html5/thumbnails/6.jpg)
THz and IP Optical Tables
FACET StatusPage 6
THz Table (looking east towards dump)
IP Table (looking east towards dump)
• Photos taken Feb 11 (Mark Hogan)
• Magnets installed since then.
![Page 7: FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d2d5503460f94a03c86/html5/thumbnails/7.jpg)
Current Status
• Magnets installed in sector 20 – photo taken yesterday:
FACET StatusPage 7
THz Table (looking east towards dump)
IP Table
![Page 8: FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d2d5503460f94a03c86/html5/thumbnails/8.jpg)
Plan – Dump Table
FACET StatusPage 8
Dump Table(Experiment Area 3)
• Beam size: 55um x 25um
![Page 9: FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d2d5503460f94a03c86/html5/thumbnails/9.jpg)
Plasma Wakefield Acceleration
FACET StatusPage 9
• Continuation of very successful FFTB experiments
• Heat-pipe oven to be installed this summer
• Lithium metal vaporized at 800ºC• Length of plasma controllable by
controlling heaters and pressure of helium buffer gas
• Isolated by Be windows
![Page 10: FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d2d5503460f94a03c86/html5/thumbnails/10.jpg)
Plasma Wakefield Acceleration cont.
FACET StatusPage 10
• What is maximum energy gain available?
• Instabilities?• Self-injected particles?• Phase One: Begin with single electron
bunch in field ionized lithium plasma.• Phase Two: Single bunch in field
ionized cesium plasma.• Phase Three: Use Notch Collimator.• Phase Four: Two electron bunches
(drive and witness) in field ionized cesium plasma.
• After first year, pre-ionized plasma, positrons, positrons and electrons.
![Page 11: FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d2d5503460f94a03c86/html5/thumbnails/11.jpg)
Smith Purcell
FACET StatusPage 11
• Bunch Time Profile measurements with Coherent Smith-Purcell Radiation
• Moderate band-width terahertz
• Beam passes by grating which has a dispersive effect
• Continuation of experiment at ESA
• Not sensitive to beam spot size (will be situated upstream of IP).
• Non-destructive (parasitic running).
![Page 12: FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d2d5503460f94a03c86/html5/thumbnails/12.jpg)
Wakefield Acceleration in Dielectric Structures
FACET StatusPage 12
• GV/m class DWA for use in linear colliders and future light sources.
• Previous work at FFTB/SLAC, UCLA, BNL.• High gradient regime at FACET.• FACET beam sent through prototype
dielectric wakefield acceleration structures.• Parametric breakdown studies and lifetime
effects.• Vary structures (dimensions, materials etc). • Use drive and witness bunches to observe
acceleration.• Use coherent Cerenkov radiation• Next year, use protons.
![Page 13: FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d2d5503460f94a03c86/html5/thumbnails/13.jpg)
Ultrafast Magnetic Switching
• Continuation of FFTB work.• Change in magnetization of a sample on ultrafast
timescales• Change pulse-lengths with constant Q - do longer
pulse-lengths have more energy deposition?• Expose sample to electron bunch• Then image with spin-sensitive scanning electron
microscope.• Different patterns on same film indicate different
physical processes.• Chaos cannot be explained• Need to rule out experimental artefacts.
FACET StatusPage 13
2.3ps
70fs
![Page 14: FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d2d5503460f94a03c86/html5/thumbnails/14.jpg)
Other Experiments
• Metallic Periodic Structures– Short-pulse, high fields to study breakdown physics.
• CLIC Studies (letter of intent)– Dispersion-free steering – Accelerating structure Wakefield Studies– Collimator Wakefield Studies
• THz extraction (expression of interest)– Power meter and thermal camera to measure the THz
from the existing FACET bunch length monitor foil. – Extract radiation to an experimental area
FACET StatusPage 14
30cm High Power test structure (CLIC Studies)
Suggested extraction of THz
Short Metallic Accelerating Structure
![Page 15: FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d2d5503460f94a03c86/html5/thumbnails/15.jpg)
Schedule 2011
• Construction Phase 1 will be complete in May.• Beam Commissioning starts June 13th
• Transitioning to…• User-aided commissioning/Experimental program in July and
August• Users meeting in August• Next round of proposals coming up• Second SAREC review likely October• Construction Phase 2… positron arm of the bunch compressor
in S10• Experimental PPS zone
FACET StatusPage 15
![Page 16: FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d2d5503460f94a03c86/html5/thumbnails/16.jpg)
Schedule 2012 and Beyond
• FACET will run for 4 months each year for the next five years.• In 2012 the 4 months are likely to be February - June.• Electron beams and positron beams will be available to the
experimenters.• Sector 20 has areas in which experiments can be installed with good
support.• Very flexible facility
• 2013? Phase Three: positron arm of the bunch compressor in S20 (aka the sailboat chicane) for simultaneous electron and positron beams
FACET StatusPage 16
![Page 17: FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d2d5503460f94a03c86/html5/thumbnails/17.jpg)
Summary
• FACET is a test facility for Plasma Wakefield experiment with flexibility to serve many other experiments.
• Unique high power beams• Installation on track• First Beam June 13th
• Approximately 2 weeks of beam commissioning• User aided commissioning / first science, July and August.• New round of proposals for 2012 due (provisionally) October.• 4 months of FACET running in 2012 and every year until 2017.
• See you at the FACET satellite Meeting at PAC? Marriott Marquis Tuesday March 29, 2011 from 6:00pm-8:00pm in the Brecht Room on the 4th Floor.
FACET StatusPage 17