estb test beam upgrades hadrons shorter bunch length
DESCRIPTION
ESTB Test Beam Upgrades Hadrons Shorter bunch length. Carsten Hast March 17 th 2011. Beam Properties at Detector Plane. x =1mm. y =1.4mm. E/E=1.3%. Secondary Hadron Beam Properties. Divide by 4 for 250 pC. ESTB Stage II: Hadron Production. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: ESTB Test Beam Upgrades Hadrons Shorter bunch length](https://reader030.vdocuments.us/reader030/viewer/2022033102/56815fbd550346895dceb91e/html5/thumbnails/1.jpg)
ESTB Test Beam Upgrades
HadronsShorter bunch length
Carsten HastMarch 17th 2011
![Page 2: ESTB Test Beam Upgrades Hadrons Shorter bunch length](https://reader030.vdocuments.us/reader030/viewer/2022033102/56815fbd550346895dceb91e/html5/thumbnails/2.jpg)
C.Hast, ESTB Workshop SLAC, March 2011 2
Secondary Hadron Beam Properties
Beam Properties at Detector Plane
x=1mm y=1.4mm
E/E=1.3%
Divide by 4 for 250 pC
![Page 3: ESTB Test Beam Upgrades Hadrons Shorter bunch length](https://reader030.vdocuments.us/reader030/viewer/2022033102/56815fbd550346895dceb91e/html5/thumbnails/3.jpg)
C.Hast, ESTB Workshop SLAC, March 2011 3
ESTB Stage II: Hadron Production
• Add Be target, beam dump, analyzing magnet, momentum slit, and quadrupole doublets to produce a secondary hadron beam
• Production angle = 1.35O and Acceptance = 10 sr
![Page 4: ESTB Test Beam Upgrades Hadrons Shorter bunch length](https://reader030.vdocuments.us/reader030/viewer/2022033102/56815fbd550346895dceb91e/html5/thumbnails/4.jpg)
• Move Collimator (BSY)• Design, build and install Be-target (BSY)• Design, build and install insertable dump / collimator (BSY)• Retrieve and install bend magnet (for momentum selection) (ESA)• Retrieve and install 4 quadrupoles (BSY/ESA)• Design, build and install collimator (ESA)• Additional vacuum system (ESA)• Many any other odds and ends
4C.Hast, ESTB Workshop SLAC, March 2011
ESTB Stage II: Components
Serious effort!Needs to be driven by user demand!
![Page 5: ESTB Test Beam Upgrades Hadrons Shorter bunch length](https://reader030.vdocuments.us/reader030/viewer/2022033102/56815fbd550346895dceb91e/html5/thumbnails/5.jpg)
C.Hast, ESTB Workshop SLAC, March 2011 5
Shorter Bunch Length for ESTB
• Interest for shorter bunches (CLIC, accelerator R&D, etc)
• LCLS ultra-short bunch length: 10 m and shorter
• In A-line, bunch length increases to 280 m due to strong bends (24o) and large (optics) R56
• With existing optics: 20-30 m bunch length is possible if one manages to reduce R56 by a factor 3-4 and keep E=0.02% Lew, Ted and Jury are looking into that
• Possible to preserve short bunches in ESA with adequate $ support by interested parties …
![Page 6: ESTB Test Beam Upgrades Hadrons Shorter bunch length](https://reader030.vdocuments.us/reader030/viewer/2022033102/56815fbd550346895dceb91e/html5/thumbnails/6.jpg)
Summary• Production of Hadrons is possible for late 2012 if
– Demanded by users – Funding is made available
• Short bunch length might be possible– Currently under study– Funding needs to be found
6C.Hast, ESTB Workshop SLAC, March 2011
Production of Hadrons would add
desirable capabilities to ESTB