estb end station test beam design, performance, infrastructure, status mauro pivi, slac national...

27
ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD Status Meeting, SLAC April 14, 2011

Upload: lee-short

Post on 13-Dec-2015

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

ESTB End Station Test Beam Design, Performance, Infrastructure, Status

Mauro Pivi, SLAC National Accelerator Laboratory

on behalf of ESTB/ESA team

ARD Status Meeting, SLACApril 14, 2011

Page 2: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

SLAC End Station A Test Beam (ESTB)

• ESTB will be a unique HEP resource

- World’s only high-energy primary electron beam for large scale Linear Collider MDI and beam instrumentation studies

- Exceptionally clean and well-defined primary and secondary electron beams for detector development

- Secondary hadron beam planned as an upgrade

• R. Erickson, T. Fieguth, C. Hast, J. Jaros, D. MacFarlane, T. Maruyama, Y. Nosochkov, T. Raubenheimer, J. Sheppard, D.Walz, and M. Woods, “ESTB proposal” July 2009- L. Keller, myself joined at end 2010

Carsten Hast, SLAC, ALCPG112

Page 3: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

ESTB Workshop at SLAC

1st ESTB User Workshop in March 2011– 50 participants from 16 institutions and 5

countries– 13 short presentations for proposed test beam uses– 8 requests received (already before the workshop)

Underlines the broad interest by the community

3

Page 4: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

LCLS and ESA

Use pulsed magnets in the beam switchyard to send LCLS beam to ESA

4

Page 5: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

Carsten Hast, SLAC, ESA Test Beam

ESA

A-Line

LCLS

BSY

Page 6: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

LCLS/ESTB Beams

LCLS beam– Energy: 3.5 –13.6 GeV– Repetition rate: 120Hz– Beam current: 20 to 250 pC

• 150 pC preferred by LCLS Users these days

– 350 pC @ 120Hz has been provided• This is the current upper limit for the present cathode• Radiation Safety approved 600 pC running!

– Beam availability > 95%!

ESTB beam– Kick the LCLS beam into ESA @ 5 Hz– Primary beam 3.5 -13.6 GeV

• Determined by LCLS• <1.5 x 109 e-/pulse (250 pC)

– Clean secondary electrons• 1 GeV to 13.6 GeV, 0.1 e-/pulse to 109 e-/pulse

6

Page 7: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

Additional Availability

Upstream of the LCLS undulator, BYKIK kicker is used to park the beam out of the beam line.

When BYKIK turns “ON”, the BSY kickers will also fire “ON” to re-direct the LCLS beam in ESA

A-line ESTB

If LCLS experiments don’t need full 120 Hz rate, the remaining beam is parked out

Extra 5% of beam time at 120Hz (!) possible

Mauro Pivi SLAC, ARD Status Meeting, April 2011 7

Page 8: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

8

ESTB Hardware Needed

• 4 new kicker magnets including power supplies and modulators and vacuum chambers are designed and components are being ordered and manufactured

• Build new PPS system and install new beam dump

Page 9: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

Building 61: ESA

Beam

9

Page 10: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

End Station A Experimental Area

10

Page 11: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

Radiation Physics: Work on ESA Beam DumpRadiation Physics: Work on ESA Beam Dump

● Assessing current dose equivalent rates due to 2 kW of 17 GeV electron beam hitting an unshielded copper dump. Needs very careful investigations

● Identifying main contribution to the dose depending on the locations as well as spectra of particles.

● Testing a dump shielding to mitigate the prompt dose outside ESA building. Huge volume (70 m long), with thick shieldings. Requires computational time to determine reliably the dose to personal in far places (ESA counting house and second floor of blg. 131.)

● Assess residual dose rate levels.

● Environmental impact: tritium production, ozone production, concrete, air and ground water activation.

Needed for production runs: max. credible beam, operational beam parameters.

Total dose eq. (mrem/h)completed - undergoing

Ludovic Nicolas, SLAC

Page 12: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

ESTB Stage I: Primary and secondary beams

• Primary e- Beam operations – Full intensity, 4 - 13 GeV, LCLS beam into ESA

• Secondary e- beams– 4 - 13 GeV, up to 10-4 momentum resolution– 1 GeV (maybe) and 2 GeV (most likely)– Adjusting 2 collimators: 0.1 - 109 electrons/pulse

• Tagged photon beams– developing the needed infrastructure

Mauro Pivi SLAC, ARD Status Meeting, April 2011

Page 13: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

13

ESTB Stage II: Hadron Production

• Add Be target, beam dump, analyzing magnet, momentum slit, and quadrupole doublets to produce a secondary hadron beam

• Production angle = 1.35O and Acceptance = 10 sr

• p produced at rate 1 p / 250 pC beam

• Protons and Kaons at ~ 0.02 / 250 pC

Production of Hadrons would add desirable capabilities to ESTB,

But currently is Not Funded.

We need User requests!

Page 14: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

Proposals

• Test of the SSD Electronics for STAR HFT Upgrade

• Pixel Sensors for ATLAS Upgrades• STAR Pixel Detector• Fermi Large Area Telescope• LC detector: Silicon-Tungsten Calorimeter • Super B R&D• Energy Spectrometry• CLIC Wakefield Collimator Studies• Radiation Physics Beam Tests• Beamcal Radiation Damage Study• Geosynchrotron

Radio Emission from Extensive Air Showers• SuperB DCH • Askaryan Effect in High Energy Showers

Howard Matis, LBNL (*)

Philippe Grenier, SLAC (*)Leo Grenier, LBNL (*)Elliott Bloom, SLAC (*)Ray Frey, University of Oregon (*)Jerry Va’Vra, SLACMike Hildreth, Notre Dame University (*)Roger Jones, Cockcroft/Manchester UMario Santana, SLACBruce Schumm, UC Santa Cruz  Konstantin Belov, UCLA

Mike Rooney (*)Peter Gorham, Hawaii U. (*)

14(*) proposal received

Page 15: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD
Page 16: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

Solenoid Tracker at RHIC: search qg plasma.

efficiency and spatial resolution sensors

Page 17: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

Collimator Wakefield MeasurementsR.M. Jones, D. Schulte, R. Tomas, W. Wuensch for the CLIC team

• Bunch length measurement is critical . New electro-optic bunch length instrumentation (CLIC CDR)

• Need BPM resolution in the 100 nm level (partially contributed by CERN)

Page 18: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

Development: Short bunch length

• Interest to short bunches ~50mm (CLIC, accel. R&D..)

• LCLS beam: 10 mm and smaller

• In the A-line, bunch length increases to 280 mm due to 24° bend, large dispersion and large R56

• Solution: installation of 4 available QUADs in A-line

- to reduce R56 (T. Fieguth)- with LCLS beam sE~0.02% (Z. Huang)

- bl = 50 mm or shorter in ESA

Mauro Pivi SLAC, ARD Status Meeting, April 2011

R56<0.1

4 Quadrupoles later

R56~0.46

Existing optics

Page 19: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

Schedule

• This Down Time (now to mid May)– We install one BSY kicker with a stainless steel vacuum chamber

• End of May LCLS starts up and runs until Christmas (one week off in October)

• Mid of June FACET runs until August• Mid of July ESTB can do first test of kicking a 4GeV beam into A-line• ESA PPS becomes available this summer

– 4GeV primary beam to ESA– 4-14GeV secondary electron beam to ESA

• Commissioning of ESA infrastructure September/October• Oct 25th – Nov 1st install 4 BSY kicker magnets with ceramic chambers• First ESTB run in November and December (need commissioning time)• LCLS off from Christmas to end of January• ESTB running resumes February 2012• SLAC downtimes are in Aug/Sept and over Christmas for the next years

19Carsten Hast, SLAC, ALCPG11

Page 20: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

Summary• We are excited to re-start ESA test beams!

- Unique High energy test beam line in the US, with plenty of infrastructures and SLAC support for Users

• Beam parameters determined by LCLS. Availability 5Hz + opportunities to increase rate when not needed for LCLS.

• We install a short-term system, 1 kicker and stst chamber, for e- beams in ESTB by May with commissioning by summer.

• Installation of the full 4 kicker system by end October

- First ESTB run in November / December 2011

• Hadron beam line upgrade needs user requests and funding

20Mauro Pivi SLAC, ARD Status Meeting, April 2011

Page 21: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

Back-up

Page 22: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

ESTB Stage I: Primary e- Beam operations

• A full intensity, high energy e- beam• The beam is focused in the middle of ESA

• sx~sy~7um• sz=280um

• 28 larger than LCLS, large R56 in A-line• 3.5-13.6 GeV, up to 250 (maybe 350) pC

22

Page 23: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

Primary beam can be directed onto a target

• Secondary e- are momentum-selected in A-line

• 1 GeV (maybe, has been done in the past)

• 2 GeV most likely

• 4 - 13 GeV easy, up to 10-4 momentum resolution

• Adjusting 2 existing collimators

• 0.1 - 109 electrons/pulse

Secondary e- Beam Operations

23

Page 24: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

SILICON STRIP DETECTOR

Tagged Photon Beam in ESA

• 2nd e- beam hits thin radiator in ESA• Bend e- off axis and measure displacement energy of e-

tagging the photon energy

We need 10cm by 2cm, 100 mm pitch Si strip detectorDonations welcome!

GLAST/Fermi test 1999

24

Page 25: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

25

Secondary Hadron Beam Properties

Beam Properties at Detector Plane

x=1mm y=1.4mm

E/E=1.3%

Divide by 4 for 250 pC p produced at rate 1 p / 250pC beam

Protons and Kaons at ~ 0.02 / 250pC

Production of Hadrons would add desirable capabilities to ESTB,

But currently is Not Funded.

We need User requests!

Page 26: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

26

• SLAC 10 GeV/c 2nd electrons• Time start from the LINAC RF signal, but

correctable with a local START counter

s ~36ps

Local START time:

Beam spot: s < 1mm

Lead glass:

Jerry Va’vra’s Focusing DIRC Tests

Page 27: ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD

27

18 feet

Wakefield box Wire Scanners rf BPMs

T-487: long. bunch profile

“IP BPMs” T-488

Ceramic gap for EMI studies

BPM energy spectrometer (T-474/491)Synch Stripe energy spectrometer (T-475)Collimator design, wakefields (T-480)Bunch length diagnostics (T-487)Smith-Purcell Radiation

IP BPMs—background studies (T-488)LCLS beam to ESA (T490)Linac BPM prototypesEMI (electro-magnetic interference)Irradiation Experiments

Energy Spectrometer: Dipoles + Wiggler

ESA Past Experiments

We need rf BPMs possibly LCLS-II type