Copyright © 2016 Pinnacle Infotech, Inc. Global Leader in BIM Services www.pinnaclecad.com BIM Start Date February, 2016 Architect 2 Engineers HKS Architects, Inc. Team Size BIM End Date May, 2016 innacle created the 3D Model of Ballpark of the P Palm Beaches - an under-construction baseball stadium located in West Palm Beach, Florida and was also responsible for coordination of the Electrical Services. The completion of stadium construction is planned for Spring of 2017 and the facility is designed to hold 6,500 fixed seats, and 1,000 more on the outfield berm. The stadium is expected to host two Major League Baseball teams annually for spring training beginning in 2017 - the Houston Astros and Washington Nationals. The Astros clubhouse will be located on the north side of the complex and the Nationals will be on the south side. The construction cost of the project is around $148.6 Million. Scope of Work Our scope of work for the project included 3D Modeling of Electrical Equipment, Coordination and Constructability Analysis. Virtual Construction of the project in BIM enabled independent review of the constructability issues. We have highlighted discrepancies in drawings and inadequate information at the preconstruction stage through RFIs, accompanied with proposed solutions. Trades Covered: Electrical Software Used: Revit 2015 LOD: 300 WSP Global, Inc. MEP Engineer Main Contractor* ACAI Associates Pinnacle’s Value Addition We have successfully completed the 3D Models and Coordination of the Stadium, undergoing thorough checking for design discrepancies, adherence to codes, constructability and coordination issues. We have resolved clashes like Cable Tray clashing with other services. We have run conduit above footing and routed utilities to avoid elevator pit. Our Electrical BIM Models contained all information required for speedy and error free erection and our electrical coordination ensured fast and error free construction, reducing field generated change orders and rework. Clashes Identified HW Spring Training Complex, LLC. Developer/Owner “This time, I've the opportunity of working with Siva and his team. My experience working with them has been excellent. They are always on time, very responsible, and the quality of work as well, customer service are great! Thank you.” Client’s Feedback Project Coordinator

Upload: others

Post on 04-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Ballpark Of the Palm Beaches Stadium West Palm Beach ...€¦ · THE BALLPARK OF THE PALM BEACHES West Palm Beach, Florida, USA [Stadium] Developer/Owner HW Spring Training Complex,

Copyright © 2016 Pinnacle Infotech, Inc.

Global Leader in BIM Serviceswww.pinnaclecad.com

BIM Start Date February, 2016

Architect

2 Engineers

HKS Architects, Inc.

Team Size

BIM End Date May, 2016

innacle created the 3D Model of Ballpark of the PPalm Beaches - an under-construction baseball stadium located in West Palm Beach, Florida

and was also responsible for coordination of the Electrical Services. The completion of stadium construction is planned for Spring of 2017 and the facility is designed to hold 6,500 fixed seats, and 1,000 more on the outfield berm. The stadium is expected to host two Major League Baseball teams annually for spring training beginning in 2017 - the Houston Astros and Washington Nationals. The Astros clubhouse will be located on the north side of the complex and the Nationals will be on the south side. The construction cost of the project is around $148.6 Million.

Scope of Work

Our scope of work for the project included 3D Modeling of Electrical Equipment, Coordination and Constructability Analysis. Virtual Construction of the project in BIM enabled independent review of the constructability issues. We have highlighted discrepancies in drawings and inadequate information at the preconstruction stage through RFIs, accompanied with proposed solutions.

Trades Covered: Electrical

Software Used: Revit 2015

LOD: 300

WSP Global, Inc.MEP Engineer

Main Contractor* ACAI Associates

Pinnacle’s Value Addition

We have successfully completed the 3D Models and Coordination of the Stadium, undergoing thorough checking for design discrepancies, adherence to codes, constructability and coordination issues. We have resolved clashes like Cable Tray clashing with other services. We have run conduit above footing and routed utilities to avoid elevator pit. Our Electrical BIM Models contained all information required for speedy and error free erection and our electrical coordination ensured fast and error free construction, reducing field generated change orders and rework.

Clashes Identified

THE BALLPARK OF THE PALM BEACHES

West Palm Beach, Florida, USA

[Stadium]

HW Spring Training Complex, LLC.Developer/Owner

“This time, I've the opportunity of working with Siva and his team. My experience working with them has been excellent. They are always on time, very responsible, and the quality of work as well, customer service are great! Thank you.”

Client’s Feedback

Project Coordinator