INDONESIA GAS RESERVES INDONESIA GAS RESERVES INDONESIA GAS RESERVES INDONESIA GAS RESERVES
Copyright © BPH Migas 2014, All Rights ReservedSource: Ministry of Energy & Mineral Resources of Republic Indonesia
-
INDONESIA GAS BALANCE (2014 INDONESIA GAS BALANCE (2014 –– 2030)2030)INDONESIA GAS BALANCE (2014 INDONESIA GAS BALANCE (2014 –– 2030)2030)
Copyright © BPH Migas 2014, All Rights ReservedSource: SKK Migas
-
MASTER PLAN OF MASTER PLAN OF NATIONAL NATURAL GASNATIONAL NATURAL GAS
TRANSMISSION AND DISTRIBUTION NETWORKTRANSMISSION AND DISTRIBUTION NETWORK
MASTER PLAN OF MASTER PLAN OF NATIONAL NATURAL GASNATIONAL NATURAL GAS
TRANSMISSION AND DISTRIBUTION NETWORKTRANSMISSION AND DISTRIBUTION NETWORK
Copyright © BPH Migas 2014, All Rights Reserved
-
GAS PIPELINE ON PROGRESS OF CONSTRUCTIONGAS PIPELINE ON PROGRESS OF CONSTRUCTIONGAS PIPELINE ON PROGRESS OF CONSTRUCTIONGAS PIPELINE ON PROGRESS OF CONSTRUCTION
SectionSectionLengthLength(km)(km)
DiameterDiameter(inch)(inch)
Developed Developed ByBy
RemarksRemarks(on(on stream)stream)
ProgressProgress
Gresik – Semarang 267 28PT Pertamina
GasConstruction Preparation
(Q1 2016)24.89%
Arun – Belawan – KIM – KEK Medan 480 24PT Pertamina
Gas
Commissioning(Arbel 11 Dec 2014)
Construction100% (Arun – Belawan)54.22% (Belawan – KIM)
Copyright © BPH Migas 2014, All Rights Reserved
Gas Construction(KIM-KEK May 2015)
54.22% (Belawan – KIM)
Muara Karang – Muara Tawar –Tegal Gede 70 24PT Pertamina
GasConstruction Phase
(July 2015)24.63%
Porong - Grati 56 18PT Pertamina
GasConstruction Phase(November 2015)
36.83%
Duri – Dumai76.555.9
2420, 16, 12, 8
PT PGN (Persero)Tbk
Construction Phase(December 2015)
On Progress EPC bidding
Muara Bekasi – MuaraTawar –Tegal Gede 44 24PT PGN
(Persero)TbkConstruction Phase
(June 2015)24%
-
GAS PIPELINE ON PROGRESS OF CONSTRUCTIONGAS PIPELINE ON PROGRESS OF CONSTRUCTIONGAS PIPELINE ON PROGRESS OF CONSTRUCTIONGAS PIPELINE ON PROGRESS OF CONSTRUCTION
SectionSectionLengthLength(km)(km)
DiameterDiameter(inch)(inch)
Developed ByDeveloped ByRemarksRemarks
(on(on stream)stream)ProgressProgress
Kalija I (Kepodang –Tambak Lorok) 207 14 PT Kalimantan Jawa GasConstruction Phase
(August 2015)36.7%
Pemping - Batam 13.5 16 PT PLN Batam – PT UBEConstruction Phase
(April 2015)100%
Copyright © BPH Migas 2014, All Rights Reserved
Lampung High Pressure Distribution Main Pipeline
80 16 PT PGN (Persero)Tbk Completed 100%
Gundih – Semarang 140 20 PT Sumber Petrindo Perkasa Completed 100%
Has been built FSRU in Jakarta Bay and Lampung
Planned to be built West Java FSRU, Bali FSRU and Middle Java FSRU
Planned to be built Gas Refueling Station, City Gas Pipeline Network, 20 million LPG cylinders and 50.000 Converter Kit to convert Fuel subsidies
-
GAS DISTRIBUTION NETWORK AREA TO BE AUCTIONEDGAS DISTRIBUTION NETWORK AREA TO BE AUCTIONEDGAS DISTRIBUTION NETWORK AREA TO BE AUCTIONEDGAS DISTRIBUTION NETWORK AREA TO BE AUCTIONED
1. BPH Migas planned to auction 3 Gas Distribution Network
Area.
2. The 3 Gas Distribution Network Area, are:
1. Lampung Gas Distribution Network Area;
Copyright © BPH Migas 2014, All Rights Reserved
1. Lampung Gas Distribution Network Area;
2. Semarang Gas Distribution Network Area; and
3. Jambi Gas Distribution Network Area.
-
POOL ARRANGEMENT INSTITUTIONALPOOL ARRANGEMENT INSTITUTIONALPOOL ARRANGEMENT INSTITUTIONALPOOL ARRANGEMENT INSTITUTIONAL
Copyright © BPH Migas 2014, All Rights Reserved
-
EXAMPLE OF GAS POOL PRICE DETERMINATIONEXAMPLE OF GAS POOL PRICE DETERMINATIONEXAMPLE OF GAS POOL PRICE DETERMINATIONEXAMPLE OF GAS POOL PRICE DETERMINATION
Copyright © BPH Migas 2014, All Rights Reserved
-
CONCLUSIONCONCLUSIONCONCLUSIONCONCLUSION
1) Need to simplify (diminish licensing & boost up the process) license & regulation through the One-door
Integrated Services (PelayananTerpadu Satu Pintu);
2) Specifically for LNG transportation, Indonesia requires 1 vessel;
3) All the business entity dispute in order to be submitted in parallel to the government, Energy & Mineral
Resources Minister c.q. Directorate General of Oil & Gas, SKK Migas & BPH Migas;
Copyright © BPH Migas 2014, All Rights Reserved
Resources Minister c.q. Directorate General of Oil & Gas, SKK Migas & BPH Migas;
4) All the gas infrastructure projects are better reported to the government (Directorate General of Oil &
Gas, SKK Migas & BPH Migas) to be used as a National Gas Development Infrastructure Road Map, and
also to get support from government.
-