Page 1: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

System Engineering and System Engineering and Configuration Management Configuration Management

in ITERin ITER

Presented by Stefano Chiocchio ITER JWS

Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio, John How, Akko Maas, Eric Martin, Bill Spears, Eisuke Tada

Page 2: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

System Engineering and Configuration Management

The ITER Challenges

Configuration management elements and tools in ITER

Conclusions

SynopsisSynopsis

Page 3: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

System engineeringSystem engineering

The realization of large civil and industrial construction works,the management of large interconnected systems, big science endeavors, require that

different engineering disciplines and specialized design groups are organised and their efforts converge to the achievement of the common goal.

The scope of the SE is to:

• establish the requirements and physical architecture of the project,

• manage its development from conceptual to detailed definition, and

• assess and control its performance.

Page 4: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

Relationship between System Engineering and Relationship between System Engineering and configuration managementconfiguration management

Page 5: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

Configuration managementConfiguration management

The scope of configuration management (CM) is to ensure that:

accurate information consistent with the physical and operational characteristics of the project is available at any point of time.

The ability to rapidly identify and retrieve this information is vital:

• to ensure that all participants to the design activity use consistent information,

• to assess the implication of design changes during the design and construction,

• to manage the assembly and installation operations,

• to plan for the maintenance operations

• to be able to react to unexpected or emergency situations,

• to support future upgrades,

• to safely manage the decommissioning phase.

Page 6: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

Basic relationship in Config. ManagementBasic relationship in Config. Management

Page 7: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

SE and CM during the ITER design and construction SE and CM during the ITER design and construction processprocess

Time Bar

Conceptual design

Component design

Functional design

Overall architect

ure

Component Procurement &

installation

SystemsIntegrat

ion

Operation

Detailed

design defi

nition

Inte

grate

d desig

n definiti

on

Objectives definition

Parameters selection

Requirements management

Definition of config (envelope) models

Digital mock-up Clash detection

Requirement v

performance check

config control & assembly

Conceptual definition

Detailed design Procurement phase

Value engineering Change (non conformity) control

Concurrent engineering

Page 8: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

The ITER challenges: The ITER challenges: The Scientific The Scientific MissionMission

The Physics parameters are strongly linked to design choices It is a First of a Kind Plant many specialistic skills are required but even more difficult is to find people with a wide knowledge

of the entire plant

Page 9: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

The ITER challenges: The ITER challenges: The TechnologyThe Technology

The tokamak assembly very highly integrated design, small clearances, large number of parts (few millions), few components using well proven

fabrication technology.

The tokamak building many systems, equally important for the mission of

the project, not spatially separated, with many functional interfaces.

Unusual operational conditions (nuclear, vacuum, cryogenic, magnetic) and processes (e.g. heavy items handling, remote maintenance,etc)

Page 10: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

The ITER challenges: The ITER challenges: The Project The Project OrganisationOrganisation

International collaboration, multi-cultural environment Distributed design activities Communications Concurrent engineering Procurement scheme

EU

China

USA

India

RF

JapanS Korea

Page 11: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

Configuration Management Elements in Configuration Management Elements in ITERITER

Management of requirementsManagement of requirements

Identification of the configurationIdentification of the configuration

Document and project data controlDocument and project data control

Change controlChange control

Management of interfacesManagement of interfaces

Risk ManagementRisk Management

Page 12: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

Management of requirementsManagement of requirementsThe Plant Design Specification defines the externally imposed essentially and design indepedent requirements of ITER

The Project Integration Document describes:

1) elements of Project Management

2) overall machine configuration, basic parameters, configuration tables and operation states,

3) general requirements, parameters, loads and interfaces grouped by broad subjects

4) main configuration of each system

The DRG2 (Design Requirements and Guidelines level 2)

covers all specific requirements for each system

This is responsibility of the WBS RO

Page 13: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

The Plant Break-down Structure The Plant Break-down Structure and the ITER Digital mock-upand the ITER Digital mock-up

All systems and parts of the ITER project are organised around a tree structure called PBS (Plant Breakdown structure)

Drawings , Documents, procurement and operational data can be accessed by navigating this structure.

The management of the 3D models representing the plan is done throuh ENOVIA, (a sotware by Dassault Systemes for the management of the Virtual Product Data)

The data stored in Enovia can be accessed by all members of the design team either by active connection or in passive modes using a web based client application . The parts can be visualised, reviewed and relevant information can be retrieved.

Page 14: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

• Open Source Software (Zope)

• ITER Owned and Managed

• Use through Internet Browser http://www.iter.org/idm

• Powerful search capability

• Easy (intuitive) use

• Integrated workflow with:

– Signing, approval (electronic signature)

– Comments

– Versions

• Security settings allowing read/write access to be set by users

• Online and printed users manuals, online bug and feature request forms

http://www.iter.org/idm

The ITER Documents Management System The ITER Documents Management System (IDM)(IDM)

Page 15: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

Available for ITER Staff, Partners and Collaborators

Generic User name and Password

•http://www.iter.org Public Web

•http://www.iter.org/bl Technical Baseline Web

•http://www.iter.org/cad PDF Drawing library (Passworded for ITER and Collaborators)

•http://www.iter.org/idm ITER Document Management vault (Passworded)

•http://www.iter.org/team Internal ITER Team web (IP and Password protection)

Management of Information: Management of Information: The ITER Tech web siteThe ITER Tech web site

Page 16: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

The ITER design change processThe ITER design change process

Every “proposed” design change is assessed at the system level, first...:

• Integration issues (management of the interfaces)

• Impacts on overall performance

• Impacts on cost

• Consistency between requirements and design concept

• Consistency between design concept and the actual design of each part (at this stage the CAD model of it later the real part)

... and then at machine level:

... and if approved by the Technical Coordination meeting a Design Change Request is issued and a number is assigned to it.

Page 17: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

Management of Design ChangesManagement of Design Changes

Page 18: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

ITER Interfaces Management ProcessITER Interfaces Management Process•Interface identification

•Identify the interfacing systems, and type of interfaces (geometrical, functional, importance)

•Interface initial description by cognizant part•The most affected user have the first go

•Interface reviews•This is done in parallel to the design reviews of the affected components

•Assessment of the assembly and maintenance implications

•Together with design review of each system•Creation of Interface description documents

•These documents are integral part of the technical documentation of the procurement specs.

•Definition of the interface ownership and interface monitoring

•A clear identification of the responsibility is critical.

Page 19: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

The ITER Interfaces MatrixThe ITER Interfaces Matrix

Colour coding:

partner interface X

normal interface X

complex interface X

very complex interface X

 

Page 20: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

Risks/opportunities management:Risks/opportunities management: Issues Issues IdentificationIdentification

We started this process end of 2004 with a set of broad scope Design reviews, to initiate a critical review of the status of the design and to organise the further work.

The issues cards have been reviewed and prioritized with the IT leader and since then at Technical coordination meetings

Issues can be raised by all People involved in the ITER activities (ITER ORG and ITER PTs/DAs members.

The issue are classified according to the WBS structure and the Responsible officer of that activity become the issue RO.

About 260 Issue cards have been proposed so far and stored in a database.

Page 21: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

Risks/opportunities management:Risks/opportunities management: Issues Issues databasedatabase

The database of all issues are available on the web

Help and explanation are provided by S.Chiocchio and C. Capuano.

Button to add a new

issue

Issue summary by status

Button to start a search

www.iter.org/tech

The database provides summary of the issues by status and by role of the user,Search functions and possibility to add new issues

Page 22: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

Probability (the likelihood of risk occurrence)

High (3) = Very Likely More than 90%

Moderate (2) = Likely more than 10% to 90%

Low (1) = Not Likely up to 10 %

Time ( time to start action or mitigation)

Near Term (N) = <3 months

Mid Term (M) = 3 months to 1 year

Far Term (F) = >1 year

Risks/Opportunities AnalysisRisks/Opportunities Analysis

Page 23: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

Risks/Opportunities AnalysisRisks/Opportunities Analysis

Risk type High (3) Very likely > 10%

Moderate (2) Likely >10% up to 90%

Low (1) Unlikely > 90%

1

3

Likelihood

Co

ns

eq

ue

nc

e

21

2

3

Low (1) Moderate (2) High (3)

Technical minor modifications required

Some adjustments to baseline required

Descope, or extensive workaround required

Cost less than 1kIUA between 1 and 10 kIUA

above 10 kIUA

Schedule

impact

+week >1month

< 6 months

> 6months

High: implement new process or change baseline

Medium: Aggressively manage considerr alternative process

Low: Monitor

Page 24: System Engineering and Configuration Management in ITER Presented by Stefano Chiocchio ITER JWS Pietro Barabaschi, Hans-Werner Bartels, Stefano Chiocchio,

ConclusionsConclusions

• During the ITER Transitional Activities (starting in 2001) a large effort and dedication has been spent to ensure that appropriate procedures and tools for the technical management of the project are deployed at the start of the ITER construction.

• Thanks to the commitment of the few people involved, we have succeeded:– in reviewing the present working practices,– clarify and envisage future needs, – assess different tools available and in use on the markets^,– test and deploy the new software,– and introduce procedure for the management of designc hange and document management.

• The systematic approach that we have developed and applied and the tools that we have been using compare favourably with those in use in similar large projects.

• further effort is neededto be done to:– a) to adapt the tools to the new process that the ITER team has to manage, and – b) to fully deploy these tools also to the participant teams– c) to apply consistently the interfaces and risk tracking procedures .

• We believe that this will enable the ITER organization to manage the challenging task ahead.