subfab · 1 2 3 4 5 6 7 8 9 10 11 13 a b j h g f e d c k 12 b.1 23072 sf subfab 149 sheet crq-101b...
TRANSCRIPT
1 2 3 4 5 6 7 8 9 10 11 13
A
B
J
H
G
F
E
D
C
K
12
B.1
23072 SF
SUBFAB149
SHEET CRQ-101BSECTOR B
SHEET CRQ-101ASECTOR A
SHEET CRQ-101DSECTOR D
SHEET CRQ-101CSECTOR C
Sheet Number
Original drawing is 42 x 30. Do not scale contents of this drawing.
Sheet Title
Project No:
Date ofFirst Issue: Drawn by:
Professional Seals
Key Plan
In Association with
Project
All reproduction & intellectual property rights reserved © 2012
No. Description Date
Abbie Gregg, Inc.
1130 East University Drive Suite 105Tempe, AZ 85281
Cleanroom Consultant
t +1 813 229 0300 f +1 813 223 7116
Prepared For
Contract No:
One Tampa City Center, Suite 1800,Tampa, FL 33602
HOK
Client Location
Reviewedby:
AGI AND CLIENT CONFIDENTIAL
3/10
/201
6 2:
46:0
3 PM
EQUIPMENT PLAN-SUBFAB - LEVEL 1
CRQ-100A
DN10/05/15
CD-0819
FAMRCOsceola County, FL
Owner
CD-0819
MW
1/8" = 1'-0"1 LEVEL 1- OVERALL EQUIPMENT PLAN- SUBFAB
NOTES:A. ALL TOOLS AND EQUIPMENT ON THIS SHEET DENOTED WITH SOLID HATCH ARE FOR PHASE 1 ONLY. ALL FUTURE PHASE 2 EQUIPMENT IS DENOTED WITH DIAGONAL LINE HATCHING.B. REFER TO SHEET CRQ-600 FOR TOOL AND EQUIPMENT SCHEDULES.C. ALL PHASE 2 EQUIPMENT IS FOR REFERENCE PURPOSES ONLY AND IS NOT IN CONTRACT.
1 ADVANCED SCHEMATIC DESIGN 2015-08-102 DESIGN DEVELOPMENT 2015-10-023 PERMIT SET 2015-12-074 CONSTRUCTION DOCUMENT
REVISIONS2016-02-15
5 CONSTRUCTION DOCUMENTSREVISION 2
2016-03-11
4
4
4
4
4
4
4
4
1 2 3 4 5 6 7
A
B
F
E
D
C
VMB-003BCl3
VMB-007HCl IN Ne
VMB-008HBr
B.1
VMB-020SbH3
VMB-011SiCl4
VMB-018SPARE
VMB-021NF3
VMB-017SPARE
Sheet Number
Original drawing is 42 x 30. Do not scale contents of this drawing.
Sheet Title
Project No:
Date ofFirst Issue: Drawn by:
Professional Seals
Key Plan
In Association with
Project
All reproduction & intellectual property rights reserved © 2012
No. Description Date
Abbie Gregg, Inc.
1130 East University Drive Suite 105Tempe, AZ 85281
Cleanroom Consultant
t +1 813 229 0300 f +1 813 223 7116
Prepared For
Contract No:
One Tampa City Center, Suite 1800,Tampa, FL 33602
HOK
Client Location
Reviewedby:
AGI AND CLIENT CONFIDENTIAL
3/10
/201
6 2:
46:3
1 PM
EQUIPMENT PLAN-LEVEL 1- SUBFAB-SECTOR A
CRQ-101A
DN10/05/15
CD-0819
FAMRCOsceola County, FL
Owner
CD-0819
MW
1/4" = 1'-0"1 LEVEL 1- EQUIPMENT PLAN- SUBFAB- SECTOR A
NOTES:A. ALL TOOLS AND EQUIPMENT ON THIS SHEET DENOTED WITH SOLID HATCH ARE FOR PHASE 1 ONLY. ALL FUTURE PHASE 2 EQUIPMENT IS DENOTED WITH DIAGONAL LINE HATCHING.B. REFER TO SHEET CRQ-600 FOR TOOL AND EQUIPMENT SCHEDULES.C. ALL PHASE 2 EQUIPMENT IS FOR REFERENCE PURPOSES ONLY AND IS NOT IN CONTRACT.
1 ADVANCED SCHEMATIC DESIGN 2015-08-102 DESIGN DEVELOPMENT 2015-10-023 PERMIT SET 2015-12-074 CONSTRUCTION DOCUMENT
REVISIONS2016-02-15
5 CONSTRUCTION DOCUMENTSREVISION 2
2016-03-11
4
4
1 2 3 4 5 6 7
J
H
G
F
K
SCRB-013JS
CALLISTO DUALDRY ABATE
WASTE-002METAL
COLLECTION
WASTE-003SLURRY
COLLECTIONWASTE-004
III-V COLLECTION
Sheet Number
Original drawing is 42 x 30. Do not scale contents of this drawing.
Sheet Title
Project No:
Date ofFirst Issue: Drawn by:
Professional Seals
Key Plan
In Association with
Project
All reproduction & intellectual property rights reserved © 2012
No. Description Date
Abbie Gregg, Inc.
1130 East University Drive Suite 105Tempe, AZ 85281
Cleanroom Consultant
t +1 813 229 0300 f +1 813 223 7116
Prepared For
Contract No:
One Tampa City Center, Suite 1800,Tampa, FL 33602
HOK
Client Location
Reviewedby:
AGI AND CLIENT CONFIDENTIAL
3/10
/201
6 2:
46:5
2 PM
EQUIPMENT PLAN-LEVEL 1- SUBFAB-SECTOR B
CRQ-101B
DN10/05/15
CD-0819
FAMRCOsceola County, FL
Owner
CD-0819
MW
1/4" = 1'-0"1 LEVEL 1- EQUIPMENT PLAN- SUBFAB- SECTOR B
NOTES:A. ALL TOOLS AND EQUIPMENT ON THIS SHEET DENOTED WITH SOLID HATCH ARE FOR PHASE 1 ONLY. ALL FUTURE PHASE 2 EQUIPMENT IS DENOTED WITH DIAGONAL LINE HATCHING.B. REFER TO SHEET CRQ-600 FOR TOOL AND EQUIPMENT SCHEDULES.C. ALL PHASE 2 EQUIPMENT IS FOR REFERENCE PURPOSES ONLY AND IS NOT IN CONTRACT.
1 ADVANCED SCHEMATIC DESIGN 2015-08-102 DESIGN DEVELOPMENT 2015-10-023 PERMIT SET 2015-12-074 CONSTRUCTION DOCUMENT
REVISIONS2016-02-15
5 CONSTRUCTION DOCUMENTSREVISION 2
2016-03-11
4
4
4
7 8 9 10 11 13
J
H
G
F
K
12
EPI-001.06PUMP PKG.
EPI-001.04SCROLL
PUMPVMB-001PH3
SCRB-007JS
CALLISTO 180DRY ABATE
SCRB-011JSIO
THER/WET ABATE
VMB-002AsH3 VMB-024
NH3
VMB-004GeH4
VMB-005CH4
WP-002.02UPS
CABINET
WP-002.03HOT DIW
UNIT 144KW
WP-002.04CSU
CABINET
WP-002.05CSB
COOLINGUNIT
WP-002.06COOLING
TANK
WP-002.07CO2 UNIT
WP-002.08A BOX
WP-002.12HOT DIW
UNIT 72 KW
WP-002.09CO2 UNIT
WP-002.11CO2 UNIT
WP-002.10CO2 UNIT
VMB-009HCl
VMB-010200 TO 300
DISILANE IN H2
VMB-013(CH3)3SiH
SS-006SAFETY
SHOWER
SS-011SAFETY
SHOWER
SCRB-010JS
CALLISTO DUALDRY ABATE
CVD-001.14CONTROLLER
PM 4
CVD-001.13CONTROLLER
PM 3
CVD-001.05CONTROLLERPM 1 & MAIN
CVD-001.12CONTROLLER
PM 2
CVD-002/005.12CONTROLLER
PM-2
CVD-002/005.14CONTROLLER
PM-1CVD-002/005.13CONTROLLER
PM-3
CVD-002/005.05CONTROLLERPM-1 & MAIN
CVD-002/005.11HEAT
EXCHANGERCVD-002/005.06
HEATEXCHANGER
CVD-002/005.08HEAT
EXCHANGER
CVD-002/005.09HEAT
EXCHANGER
CVD-002/005.01DRY PUMP
CVD-002/005.02DRY PUMP
CVD-002/005.07TM & LLPUMP
CVD-002/005.10DRY PUMP
CVD-002/005.03DRY PUMP
CVD-001.06HEAT
EXCHANGER-PM-1
CVD-001.11HEAT
EXCHANGER-PM-4
CVD-001.09HEAT
EXCHANGER-PM-3
CVD-001.08HEAT
EXCHANGER-PM-2
CVD-001.01DRY PUMP
CVD-001.02DRY PUMP
CVD-001.07TM & LLPUMP
CVD-001.03DRY PUMP
CVD-001.10DRY PUMP
WASTE-001SOLVENT
COLLECTION
PURN2-003SAES, PURE GAS
PS8-MGT300N2 PURIF
VMB-0225% Cl2 IN N2
VMB-026H2
BOOTIESHOODS
GOWN RACK
BENCH
PRODUCTWIPE DOWN
TABLE
WASTE-005HF COLLECTION
GOWNING ZONEFOR SUBFABDENOTED BY DASHEDLINES- KEEP AREACLEAR OF ALL TOOLSAND EQUIPMENT NOTRELATED TO GOWNING
Sheet Number
Original drawing is 42 x 30. Do not scale contents of this drawing.
Sheet Title
Project No:
Date ofFirst Issue: Drawn by:
Professional Seals
Key Plan
In Association with
Project
All reproduction & intellectual property rights reserved © 2012
No. Description Date
Abbie Gregg, Inc.
1130 East University Drive Suite 105Tempe, AZ 85281
Cleanroom Consultant
t +1 813 229 0300 f +1 813 223 7116
Prepared For
Contract No:
One Tampa City Center, Suite 1800,Tampa, FL 33602
HOK
Client Location
Reviewedby:
AGI AND CLIENT CONFIDENTIAL
3/10
/201
6 2:
47:3
0 PM
EQUIPMENT PLAN-LEVEL 1- SUBFAB-SECTOR C
CRQ-101C
DN10/05/15
CD-0819
FAMRCOsceola County, FL
Owner
CD-0819
MW
1/4" = 1'-0"1 LEVEL 1- EQUIPMENT PLAN- SUBFAB- SECTOR C
NOTES:A. ALL TOOLS AND EQUIPMENT ON THIS SHEET DENOTED WITH SOLID HATCH ARE FOR PHASE 1 ONLY. ALL FUTURE PHASE 2 EQUIPMENT IS DENOTED WITH DIAGONAL LINE HATCHING.B. REFER TO SHEET CRQ-600 FOR TOOL AND EQUIPMENT SCHEDULES.C. ALL PHASE 2 EQUIPMENT IS FOR REFERENCE PURPOSES ONLY AND IS NOT IN CONTRACT.
1 ADVANCED SCHEMATIC DESIGN 2015-08-102 DESIGN DEVELOPMENT 2015-10-023 PERMIT SET 2015-12-074 CONSTRUCTION DOCUMENT
REVISIONS2016-02-15
5 CONSTRUCTION DOCUMENTSREVISION 2
2016-03-11
4
4
4
4
4
5
7 8 9 10 11 13
A
B
E
D
C
12
EPI-001.01POWER
DIST.MODULE
PURN2-001SAES
N2 PURIF
PURH2-001SAES
H2 PURIF
MOCVD-004.32HPDU
MOCVD-004.01MPDU
MOCVD-004.12PM1
CHILLER-CHAMBERCOOLING
MOCVD-004.10PM1
CHILLER-SHOWERHEAD
MOCVD-004.05PROC DIFF
PUMP
MOCVD-004.09TM VACPUMP 3
MOCVD-004.08PM1 PUMP
NO.2PRE-CLEAN
MOCVD-004.11PM1
CHILLER-CHAMBERPROC
MOCVD-004.07PM1
PROCESSPUMPS
MOCVD-004.14PM2 PUMP
NO.2PRE-CLEAN
MOCVD-004.15PM2 PUMP
NO.1
MOCVD-004.16PM2
CHILLER-CHAMBERPROC
MOCVD-004.17PM2
CHILLER-SHOWERHEAD
MOCVD-004.18PM2
CHILLER-CHAMBERCOOLING
PURNH3-001SAES
NH3 PURIF
SCRB-005JS
CALLISTO DUALDRY ABATE
SCRB-006JS
CALLISTO DUALDRY ABATE
SCRB-008JS
CALLISTO DUALDRY ABATE
VMB-025H2
VMB-006Cl2
MOCVD-001.01DRY PUMP
MOCVD-004.04TM VACPUMP 2
MOCVD-004.03TM VACPUMP 1
PURN2-002SAES
N2 PURIF
PURH2-002SAES
H2 PURIF
MOCVD-004.04CHILLER 2
PM2
VMB-012SPARE
VMB-014BLUE NH3
B.1
VMB-019SI2H6
VMB-0165%B2H6 IN H2
VMB-015NO
MOCVD-001ALT.03
POWER/CONTROLRACK
MOCVD-001ALT.05
CHILLER
MOCVD-001ALT.01
CHAMBERPUMP
MOCVD-001ALT.02
LL VACUUMPUMP
MOCVD-005ALT.12PM1
CHILLER-CHAMBERCOOLING
MOCVD-004.06PRE-CLEANDIFF PUMP
VMB-023SiH4
MOCVD-005ALT.32HPDU
MOCVD-005ALT.01MPDU
MOCVD-005ALT.10PM1
CHILLER-SHOWERHEAD
MOCVD-005ALT.05PROC DIFF
PUMP
MOCVD-005ALT.07PM1
PROCESSPUMPS
MOCVD-005ALT.08PM1 PUMP
NO.2PRE-CLEAN
MOCVD-005ALT.11PM1
CHILLER-CHAMBERPROC
MOCVD-005ALT.14PM2 PUMP
NO.2PRE-CLEAN
MOCVD-005ALT.15PM2 PUMP
NO.1
MOCVD-005ALT.16PM2
CHILLER-CHAMBERPROC
MOCVD-005ALT.17PM2
CHILLER-SHOWERHEAD
MOCVD-005ALT.18PM2
CHILLER-CHAMBERCOOLING
MOCVD-005ALT.04TM VACPUMP 2MOCVD-005ALT.03
TM VACPUMP 1
Sheet Number
Original drawing is 42 x 30. Do not scale contents of this drawing.
Sheet Title
Project No:
Date ofFirst Issue: Drawn by:
Professional Seals
Key Plan
In Association with
Project
All reproduction & intellectual property rights reserved © 2012
No. Description Date
Abbie Gregg, Inc.
1130 East University Drive Suite 105Tempe, AZ 85281
Cleanroom Consultant
t +1 813 229 0300 f +1 813 223 7116
Prepared For
Contract No:
One Tampa City Center, Suite 1800,Tampa, FL 33602
HOK
Client Location
Reviewedby:
AGI AND CLIENT CONFIDENTIAL
3/10
/201
6 2:
48:1
2 PM
EQUIPMENT PLAN-LEVEL 1- SUBFAB-SECTOR D
CRQ-101D
DN10/05/15
CD-0819
FAMRCOsceola County, FL
Owner
CD-0819
MW
1/4" = 1'-0"1 LEVEL 1- EQUIPMENT PLAN- SUBFAB- SECTOR D
NOTES:A. ALL TOOLS AND EQUIPMENT ON THIS SHEET DENOTED WITH SOLID HATCH ARE FOR PHASE 1 ONLY. ALL FUTURE PHASE 2 EQUIPMENT IS DENOTED WITH DIAGONAL LINE HATCHING.B. REFER TO SHEET CRQ-600 FOR TOOL AND EQUIPMENT SCHEDULES.C. ALL PHASE 2 EQUIPMENT IS FOR REFERENCE PURPOSES ONLY AND IS NOT IN CONTRACT.
1 ADVANCED SCHEMATIC DESIGN 2015-08-102 DESIGN DEVELOPMENT 2015-10-023 PERMIT SET 2015-12-074 CONSTRUCTION DOCUMENT
REVISIONS2016-02-15
5 CONSTRUCTION DOCUMENTSREVISION 2
2016-03-11
4
4
4
J
H
14 15 16 17
809 SF
MAINT. SHOP129
795 SF
CHEM. LAB131
902 SF
ELEC./BURN-IN TEST132
Sheet Number
Original drawing is 42 x 30. Do not scale contents of this drawing.
Sheet Title
Project No:
Date ofFirst Issue: Drawn by:
Professional Seals
Key Plan
In Association with
Project
All reproduction & intellectual property rights reserved © 2012
No. Description Date
Abbie Gregg, Inc.
1130 East University Drive Suite 105Tempe, AZ 85281
Cleanroom Consultant
t +1 813 229 0300 f +1 813 223 7116
Prepared For
Contract No:
One Tampa City Center, Suite 1800,Tampa, FL 33602
HOK
Client Location
Reviewedby:
AGI AND CLIENT CONFIDENTIAL
3/10
/201
6 2:
48:2
5 PM
EQUIPMENT PLAN-LEVEL 1-LABORATORIES-SECTOR E
CRQ-101E
DN10/05/15
CD-0819
FAMRCOsceola County, FL
Owner
CD-0819
MW
1/4" = 1'-0"1 LEVEL 1- EQUIPMENT PLAN- LABORATORY SPACES- SECTOR E
1 ADVANCED SCHEMATIC DESIGN 2015-08-102 DESIGN DEVELOPMENT 2015-10-023 PERMIT SET 2015-12-074 CONSTRUCTION DOCUMENT
REVISIONS2016-02-15
5 CONSTRUCTION DOCUMENTSREVISION 2
2016-03-11
4
13
L
K
N
14 15 16 17
STR-001FLAM CAB
STR-008CHEM CAB
STR-007CARBOY
PUMPOUT
GC-001PH3
LC-001LEAKER CAB
GM-009He
GM-001Ar
SCRB-001OLYMPUS 2000
DRY ABATE
GC-002AsH3
GC-010200-300 PPMSi2H6 IN H2
GC-019Si2H6
GM-00210% Xe IN Ne
GM-003C4F8
GM-004CF4
GM-005CHF3
GM-006CO2
GM-0070.5% H2 IN Ne
GM-008Ne
GM-010N2O
GM-011O2
GM-012SF6
LC-002LEAKER CAB
SCRB-004OLYMPUS 2000
DRY ABATE
STR-002FLAM CAB
STR-003FLAM CAB
STR-004FLAM CAB
STR
-005
FLAM
CAB
STR
-006
FLAM
CAB
STR-009CHEM CAB
STR-010CHEM CAB
STR-011CHEM CAB
STR-012CHEM CAB
STR-013CHEM CAB
STR-014CHEM CAB
STR-015CHEM CAB
STR-016CHEM CAB
STR-017CHEM CAB
STR-018CHEM CAB
STR-019CHEM CAB
STR-007.01CO2 FIRE SUP
GC
-007
HC
l/H2/
Ne
GC
-008
HBr GC
-009
HC
l
GC
-018
SPAR
EG
C-0
17SP
ARE
GC
-011
SiC
l4G
C-0
21N
F3
SS-001SAFETY SHOWER
GC-005CH4 GC-013
SiH(CH3)3
GC-0165%B2H6 IN H2
GC
-006
Cl2
GC
-015
NO
GC
-012
5% C
I2 IN
N2
STR-021IPA CHEMDELIVERY
STR-020ACETONE CHEM
DELIVERY
STR-023HF CHEMDELIVERY
STR-022SULF ACID CHEM
DELIVERY
STR-020.01CO2 FIRE SUP
STR-021.01CO2 FIRE SUP
642 SF
CORR. /OX. GAS ROOM(H-3/H-4)
154
721 SF
FLAM. GAS ROOM(H-2/H-4)
153
759 SF
CORR. LIQUID ROOM(H-3/H-4)
155
605 SF
FLAM. LIQUID ROOM(H-2/H-4)
151
323 SF
GAS ROOM (H-5)152
SCR
B-00
9O
LYM
PUS
2000
DR
Y AB
ATE
SS-019SAFETY SHOWER
SS-018SAFETY SHOWER
SS-020SAFETY SHOWER
SS-021SAFETY SHOWER
GC
-003
BCl3
O
M
14.6
SCR
B-00
2O
LYM
PUS
2000
DR
Y AB
ATE
SCR
B-00
3O
LYM
PUS
2000
DR
Y AB
ATE
SCR
B-01
4O
LYM
PUS
2000
DR
Y AB
ATE
LOCKERSLOCKERSLOCKERSLOCKERSLOCKERSLOCKERSLOCKERSLOCKERSLOCKERS LOCKERSLOCKERSLOCKERSLOCKERSLOCKERSLOCKERSLOCKERSLOCKERSLOCKERSLOCKERS
GC-020SbH3
GC-004GeH4
GC-014SPARE
STEEL OVERHEAD TRESTLE AND ABOVEGRADE CONC. TRENCH FOR PIPING ANDCONDUITS TO BULK GAS YARD- SEE CRG-100AND SITE DRAWINGS. SEE STRUCTURALFOR TRESTLE AND TRENCH DETAILS
5
Sheet Number
Original drawing is 42 x 30. Do not scale contents of this drawing.
Sheet Title
Project No:
Date ofFirst Issue: Drawn by:
Professional Seals
Key Plan
In Association with
Project
All reproduction & intellectual property rights reserved © 2012
No. Description Date
Abbie Gregg, Inc.
1130 East University Drive Suite 105Tempe, AZ 85281
Cleanroom Consultant
t +1 813 229 0300 f +1 813 223 7116
Prepared For
Contract No:
One Tampa City Center, Suite 1800,Tampa, FL 33602
HOK
Client Location
Reviewedby:
AGI AND CLIENT CONFIDENTIAL
3/10
/201
6 2:
49:1
4 PM
EQUIPMENT PLAN-LEVEL 1- HPM AREAS-SECTOR F
CRQ-101F
DN10/05/15
CD-0819
FAMRCOsceola County, FL
Owner
CD-0819
MW
1/4" = 1'-0"1 LEVEL 1- EQUIPMENT PLAN- HPM SPACES
NOTES:A. ALL TOOLS AND EQUIPMENT ON THIS SHEET DENOTED WITH SOLID HATCH ARE FOR PHASE 1 ONLY. ALL FUTURE PHASE 2 EQUIPMENT IS DENOTED WITH DIAGONAL LINE HATCHING.B. REFER TO SHEET CRQ-600 FOR TOOL AND EQUIPMENT SCHEDULES.C. ALL CHEMICAL STORAGE CABINETS SHOWN ON THIS SHEET ARE O.F.O.I.D. ALL PHASE 2 EQUIPMENT IS FOR REFERENCE PURPOSES ONLY AND IS NOT IN CONTRACT.
1 ADVANCED SCHEMATIC DESIGN 2015-08-102 DESIGN DEVELOPMENT 2015-10-023 PERMIT SET 2015-12-074 CONSTRUCTION DOCUMENT
REVISIONS2016-02-15
5 CONSTRUCTION DOCUMENTSREVISION 2
2016-03-11
4
4
1 2 3 4 5 6 7 8 9 10 11 13
A
B
J
H
G
F
E
D
C
L
K
N
12 14 15
16 17
341 SF
STAGING/WIPEDOWN241
Class 10,000 219 SF
STAGING/WIPEDOWN213
Class 10,000
764 SF
MOCVD 2240D
Class 1,000
1405 SF
MOCVD 1240C
Class 1,000
O
319 SF
WAFER STARTS240A
Class 1,000
169 SF
ULTRA CLEAN ZONE242
Class 1,000
M
14.6
75 SF
VESTIBULE245
888 SF
8'-0" WIDE CLEAR AISLE240P
Class 1,000
521 SF
METROLOGY240F
Class 1,000
528 SF
MOCVD 3240E
Class 1,000
221 SF
STOCKERS240B
Class 1,000
507 SF
CVD240G
Class 1,000
475 SF
10'-0" WIDE CLEARAISLE240L
Class 1,000
146 SF
CLEAN VESTIBULE (B)243
Class 1,000
548 SF
GOWNING212
Class 1,000
407 SF
PRE-GOWNING211
Class 10,000
7615 SF
CLASS 10,000CLEANROOM SPACE
210
Class 10,000
132 SF
RETURN AIR CHASE215
Class 10,000
465 SF
PARTS CLEAN240H
Class 1,000
1113 SF
10'-0" WIDE CLEARAISLE240M
Class 1,000
200 SF
10'-0" WIDE CLEARAISLE240N
Class 1,000
493 SF
WET PROCESS240J
Class 1,000
616 SF
RACKS/STG.240K
Class 1,000
14423 SF
UNASSIGNED CLASS1,000 CLEANROOM
SPACE240Q
Class 1,000
115 SF
WAFER CART PASSTHRU246
Class 1000
113 SF
CHEM. CART PASSTHRU247
Class 1000
Sheet Number
Original drawing is 42 x 30. Do not scale contents of this drawing.
Sheet Title
Project No:
Date ofFirst Issue: Drawn by:
Professional Seals
Key Plan
In Association with
Project
All reproduction & intellectual property rights reserved © 2012
No. Description Date
Abbie Gregg, Inc.
1130 East University Drive Suite 105Tempe, AZ 85281
Cleanroom Consultant
t +1 813 229 0300 f +1 813 223 7116
Prepared For
Contract No:
One Tampa City Center, Suite 1800,Tampa, FL 33602
HOK
Client Location
Reviewedby:
AGI AND CLIENT CONFIDENTIAL
3/10
/201
6 2:
49:4
5 PM
EQUIPMENT PLAN-OVERALL LEVEL 2
CRQ-200
DN10/05/15
CD-0819
FAMRCOsceola County, FL
Owner
CD-0819
MW
3/32" = 1'-0"1 LEVEL 2- OVERALL EQUIPMENT PLAN
NOTES:A. ALL TOOLS AND EQUIPMENT ON THIS SHEET DENOTED WITH SOLID HATCH ARE FOR PHASE 1 ONLY. ALL FUTURE PHASE 2 EQUIPMENT IS DENOTED WITH DIAGONAL LINE HATCHING.B. REFER TO SHEET CRQ-600 FOR TOOL AND EQUIPMENT SCHEDULES.C. ALL PHASE 2 EQUIPMENT IS FOR REFERENCE PURPOSES ONLY AND IS NOT IN CONTRACT.
1 ADVANCED SCHEMATIC DESIGN 2015-08-102 DESIGN DEVELOPMENT 2015-10-023 PERMIT SET 2015-12-074 CONSTRUCTION DOCUMENT
REVISIONS2016-02-15
5 CONSTRUCTION DOCUMENTSREVISION 2
2016-03-11
4
4
4
7 8 9 10 11 13
J
H
G
F
K
12
EPI-001ASM
EPSILON E2000EPI Si, SigE, Ge
EPI-001.02TOOL
INTERFACEMODULE
EPI-001.03SIDECAR
GAS PURF
EPI-001.07VAPOR
DELIVERYSYS.
CVD-001AMAT
PRODUCERLPCVD OR RTCVD
POLYCRYST/AMORPH- SiGe: Si-C, ASi
CVD-002/005AMAT
PRODUCERPECVD- SiO2,
SiON, Si3N4, SiN
WP-002SCREENCW-1500
PRE GATECLEAN- PRE EPICLEAN SILICON
BASED
WP-012KINETICSCUSTOM
WET BENCH-SOLVENT
WP-015JST MFGCUSTOM
WET BENCH-ACID
WP-011KINETICSCUSTOM
WET BENCH-BASE
WP-013KINETICSCUSTOM
WET BENCH-SPINNER
MET-002MECHATRONICmWS200-300T
WAFER SORTER
MET-006SEMILABSE-2500
VASE
MET-006.01COMPUTER
WP-002.01ELECTRICAL
BOX
341 SF
STAGING/WIPEDOWN241
Class 10,000
BURN-003BLUE M
DCC1406INERT GAS OVN
BURN-004BLUE M
DCC1406INERT GAS OVN
WP-024JST MFGCUSTOM
SOLV PARTSCLEAN
STOCK-001BROOKS
M2100WAFER STOCKER
STOCK-002BROOKS
M2100WAFER STOCKER
WP-024.01CO2 FIRE
SUP
WP-012.01CO2 FIRE
SUP
SUP-0034' HOOD
BOTTLE WASHWP-025JST MFGCUSTOM
ACID PARTSCLEAN
SUP-002BROOKS
M0300FOUP CLEANER
WP-019CLASS 1 TECH
TRIDENTSRD
WP-017CLASS 1 TECH
TRIDENTSRD
WP-018CLASS 1 TECH
TRIDENTSRD
169 SF
ULTRA CLEAN ZONE242
Class 1,000
319 SF
WAFER STARTS240A
Class 1,000
888 SF
8'-0" WIDE CLEAR AISLE240P
Class 1,000
221 SF
STOCKERS240B
Class 1,000
507 SF
CVD240G
Class 1,000
475 SF
10'-0" WIDE CLEARAISLE240L
Class 1,000
146 SF
CLEAN VESTIBULE (B)243
Class 1,000
465 SF
PARTS CLEAN240H
Class 1,000
1113 SF
10'-0" WIDE CLEARAISLE240M
Class 1,000
200 SF
10'-0" WIDE CLEARAISLE240N
Class 1,000
493 SF
WET PROCESS240J
Class 1,000
616 SF
RACKS/STG.240K
Class 1,000
MET-005BRUKER
DIMENSION ICONAFM
WP-023KINETICSCUSTOM
WET BENCH-ACID PARTS
CLEAN
WP-022KINETICSCUSTOM
WET BENCH-ACID PARTS
CLEAN
CVD-002/005.15COMPUTER
CVD-001.15COMPUTER
WP-013.01CO2 FIRE
SUP
??
SAFETY SHOWERW/ INTEGRAL BOOTH ENCLOSUREAND DRAIN PAIN- REFER TO DETAIL6/CRA-503 FOR INSTALLATION OFSHOWER BOOTH AND RAISED ACCESSFLOORING SYSTEM
521 SFMETROLOGY
115 SF
WAFER CART PASSTHRU246
Class 1000113 SF
CHEM. CART PASSTHRU247
Class 1000
WAFER STARTSTABLE
?
MET-005.01COMPUTER
?
MET-005.03AIR TABLEVIBRATIONISOLATION
SS-012SAFETY
SHOWER
?
CART
CART
Sheet Number
Original drawing is 42 x 30. Do not scale contents of this drawing.
Sheet Title
Project No:
Date ofFirst Issue: Drawn by:
Professional Seals
Key Plan
In Association with
Project
All reproduction & intellectual property rights reserved © 2012
No. Description Date
Abbie Gregg, Inc.
1130 East University Drive Suite 105Tempe, AZ 85281
Cleanroom Consultant
t +1 813 229 0300 f +1 813 223 7116
Prepared For
Contract No:
One Tampa City Center, Suite 1800,Tampa, FL 33602
HOK
Client Location
Reviewedby:
AGI AND CLIENT CONFIDENTIAL
3/10
/201
6 2:
50:0
3 PM
EQUIPMENT PLAN-LEVEL 2- CLASS 1000CLEANROOM-SECTOR C
CRQ-201C
DN10/05/15
CD-0819
FAMRCOsceola County, FL
Owner
CD-0819
MW
1/4" = 1'-0"1 EQUIPMENT PLAN- LEVEL 2- CLASS 1000 CLEANROOM - SECTOR C
NOTES:A. ALL TOOLS AND EQUIPMENT ON THIS SHEET DENOTED WITH SOLID HATCH ARE FOR PHASE 1 ONLY. ALL FUTURE PHASE 2 EQUIPMENT IS DENOTED WITH DIAGONAL LINE HATCHING.B. REFER TO SHEET CRQ-600 FOR TOOL AND EQUIPMENT SCHEDULES.C. ALL PHASE 2 EQUIPMENT IS FOR REFERENCE PURPOSES ONLY AND IS NOT IN CONTRACT.
1 ADVANCED SCHEMATIC DESIGN 2015-08-102 DESIGN DEVELOPMENT 2015-10-023 PERMIT SET 2015-12-074 CONSTRUCTION DOCUMENT
REVISIONS2016-02-15
5 CONSTRUCTION DOCUMENTSREVISION 2
2016-03-11
4
4
4
4
7 8 9 10 11 13
B
E
D
C
12
MOCVD-001AIXTRONBM300T
CNT/GRAPHENE
MOCVD-001.02REMOTE PC
MOCVD-004AIXTRONEOS-XPEPI III-V
EPI-001ASM
EPSILON E2000EPI Si, SigE, Ge
EPI-001.02TOOL
INTERFACEMODULE
EPI-001.03SIDECAR
GAS PURF
EPI-001.07VAPOR
DELIVERYSYS.
EPI-001.05MAINT. CART
MET-007BRUKER
CONTOUR3D MICROSCOPE
MET-006SEMILABSE-2500
VASE
MET-014SEMILABSE-2500
PHOTOLUMINESCENCE
MET-011KLA TENCOR
CS920SURFACEDEFECT
MET-006.01COMPUTER
MET-007.01COMPUTER
MET-008.01COMPUTER
MOCVD-004.13PM1
VAPORSTATION
MOCVD-004.29PM2
VAPORSTATION
MOCVD-004.30PM3
VAPORSTATION
MOCVD-004.31PM4
VAPORSTATION
MOCVD-005ALTAIXTRONEOS-XP
Gan/ALGaN
MOCVD-005ALT.13PM1
VAPORSTATION
MOCVD-005ALT.29PM2
VAPORSTATION
MOCVD-005ALT.30PM3
VAPORSTATION
MOCVD-005ALT.31PM4
VAPORSTATION
MOCVD-005ALT.02REMOTE PC
MOCVD-001ALTPLASMA-THERM
VERSALINESINGLE CHMBR
SiC PECVD
MOCVD-001ALT.04
COMPUTERCART
B.1
764 SF
MOCVD 2240D
Class 1,000
1405 SF
MOCVD 1240C
Class 1,000
MOCVD-004.02REMOTE PC
521 SF
METROLOGY240F
Class 1,000
528 SF
MOCVD 3240E
Class 1,000
1113 SF
10'-0" WIDE CLEARAISLE240M
Class 1,000
200 SF
10'-0" WIDE CLEARAISLE240N
Class 1,000
MET-008SEMILABSE-2500
RAMAN W/ WFRHNDLNG
?
Sheet Number
Original drawing is 42 x 30. Do not scale contents of this drawing.
Sheet Title
Project No:
Date ofFirst Issue: Drawn by:
Professional Seals
Key Plan
In Association with
Project
All reproduction & intellectual property rights reserved © 2012
No. Description Date
Abbie Gregg, Inc.
1130 East University Drive Suite 105Tempe, AZ 85281
Cleanroom Consultant
t +1 813 229 0300 f +1 813 223 7116
Prepared For
Contract No:
One Tampa City Center, Suite 1800,Tampa, FL 33602
HOK
Client Location
Reviewedby:
AGI AND CLIENT CONFIDENTIAL
3/10
/201
6 2:
50:2
5 PM
EQUIPMENT PLAN-LEVEL 2- CLASS 1000CLEANROOM-SECTOR D
CRQ-201D
DN10/05/15
CD-0819
FAMRCOsceola County, FL
Owner
CD-0819
MW
1/4" = 1'-0"1 EQUIPMENT PLAN- LEVEL 2- CLASS 1000 CLEANROOM - SECTOR D
NOTES:A. ALL TOOLS AND EQUIPMENT ON THIS SHEET DENOTED WITH SOLID HATCH ARE FOR PHASE 1 ONLY. ALL FUTURE PHASE 2 EQUIPMENT IS DENOTED WITH DIAGONAL LINE HATCHING.B. REFER TO SHEET CRQ-600 FOR TOOL AND EQUIPMENT SCHEDULES.C. ALL PHASE 2 EQUIPMENT IS FOR REFERENCE PURPOSES ONLY AND IS NOT IN CONTRACT.
1 ADVANCED SCHEMATIC DESIGN 2015-08-102 DESIGN DEVELOPMENT 2015-10-023 PERMIT SET 2015-12-074 CONSTRUCTION DOCUMENT
REVISIONS2016-02-15
5 CONSTRUCTION DOCUMENTSREVISION 2
2016-03-11
4
J
H
G
F
K
14 15 16 17
DISPOSE
WASTE
BOOTIESHOODS
HIGH TOPBOOTIES
HAMPER
219 SF
STAGING/WIPEDOWN213
Class 10,000
548 SF
GOWNING212
Class 1,000
407 SF
PRE-GOWNING211
Class 10,000
7615 SF
CLASS 10,000CLEANROOM SPACE
210
Class 10,000
132 SF
RETURN AIR CHASE215
Class 10,000
BOOTIESHOODS
BOOTIESHOODS
DISPOSE
HAMPER
BENCH
BENCH
BENCH
BENCH
PRODUCTWIPE DOWN
TABLE
GLOVEDISP.
GLOVEDISP.
GOWN RACK
GOWN RACK
GOWN RACK
GOWN RACK
GOWN RACK
GOWN RACK
Sheet Number
Original drawing is 42 x 30. Do not scale contents of this drawing.
Sheet Title
Project No:
Date ofFirst Issue: Drawn by:
Professional Seals
Key Plan
In Association with
Project
All reproduction & intellectual property rights reserved © 2012
No. Description Date
Abbie Gregg, Inc.
1130 East University Drive Suite 105Tempe, AZ 85281
Cleanroom Consultant
t +1 813 229 0300 f +1 813 223 7116
Prepared For
Contract No:
One Tampa City Center, Suite 1800,Tampa, FL 33602
HOK
Client Location
Reviewedby:
AGI AND CLIENT CONFIDENTIAL
3/10
/201
6 2:
50:3
5 PM
EQUIPMENT PLAN-LEVEL 2- CLASS 10,000CLEANROOM-SECTOR E
CRQ-201E
DN10/05/15
CD-0819
FAMRCOsceola County, FL
Owner
CD-0819
MW
1/4" = 1'-0"1 EQUIPMENT PLAN- LEVEL 2- CLASS 10,000 CLEANROOM - SECTOR E
1 ADVANCED SCHEMATIC DESIGN 2015-08-102 DESIGN DEVELOPMENT 2015-10-023 PERMIT SET 2015-12-074 CONSTRUCTION DOCUMENT
REVISIONS2016-02-15
5 CONSTRUCTION DOCUMENTSREVISION 2
2016-03-11
4
2/CRQ-30
0
4/CRQ-300
Sheet Number
Original drawing is 42 x 30. Do not scale contents of this drawing.
Sheet Title
Project No:
Date ofFirst Issue: Drawn by:
Professional Seals
Key Plan
In Association with
Project
All reproduction & intellectual property rights reserved © 2012
No. Description Date
Abbie Gregg, Inc.
1130 East University Drive Suite 105Tempe, AZ 85281
Cleanroom Consultant
t +1 813 229 0300 f +1 813 223 7116
Prepared For
Contract No:
One Tampa City Center, Suite 1800,Tampa, FL 33602
HOK
Client Location
Reviewedby:
AGI AND CLIENT CONFIDENTIAL
3/10
/201
6 1:
54:4
0 PM
3D VIEWS FOR CLASS1000 CLEANROOM
CRQ-300
DN10/05/15
CD-0819
FAMRCOsceola County, FL
Owner
CD-0819
MW
1/16" = 1'-0"1 LEVEL 2- EQUIPMENT KEY PLAN2 ELEVATED VIEW OUTSIDE STAGING/WIPE-DOWN
4 VIEW INTO CLEANROOM FROM CORRIDOR
1 ADVANCED SCHEMATIC DESIGN 2015-08-102 DESIGN DEVELOPMENT 2015-10-023 PERMIT SET 2015-12-074 CONSTRUCTION DOCUMENT
REVISIONS2016-02-15
5 CONSTRUCTION DOCUMENTSREVISION 2
2016-03-11
Sheet Number
Original drawing is 42 x 30. Do not scale contents of this drawing.
Sheet Title
Project No:
Date ofFirst Issue: Drawn by:
Professional Seals
Key Plan
In Association with
Project
All reproduction & intellectual property rights reserved © 2012
No. Description Date
Abbie Gregg, Inc.
1130 East University Drive Suite 105Tempe, AZ 85281
Cleanroom Consultant
t +1 813 229 0300 f +1 813 223 7116
Prepared For
Contract No:
One Tampa City Center, Suite 1800,Tampa, FL 33602
HOK
Client Location
Reviewedby:
AGI AND CLIENT CONFIDENTIAL
3/10
/201
6 1:
55:0
4 PM
EQUIPMENTSCHEDULES- SUBFAB,HPM, & CLEANROOMS
CRQ-600
DN10-05-15
CD-0819
FAMRCOsceola County, FL
Owner
CD-0819
MW
1 CONSTRUCTION DOCUMENTREVISIONS
2016-02-15
2 CONSTRUCTION DOCUMENTSREVISION 2
2016-03-11
Level 1 Phase 1 Equipment Schedule HPM Areas
Tool ID Room: Number Room: Name Phasing Description Responsibility
SS-001 150 HPM CORRIDOR (H-5) PHASE 1 SAFETY SHOWER CFCISS-020 151 FLAM. LIQUID ROOM (H-2/H-4) PHASE 1 SAFETY SHOWER CFCISTR-001 151 FLAM. LIQUID ROOM (H-2/H-4) PHASE 1 FLAM CAB OFOISTR-002 151 FLAM. LIQUID ROOM (H-2/H-4) PHASE 1 FLAM CAB OFOISTR-003 151 FLAM. LIQUID ROOM (H-2/H-4) PHASE 1 FLAM CAB OFOISTR-004 151 FLAM. LIQUID ROOM (H-2/H-4) PHASE 1 FLAM CAB OFOISTR-007 151 FLAM. LIQUID ROOM (H-2/H-4) PHASE 1 CARBOY PUMPOUT OFOISTR-007.01 151 FLAM. LIQUID ROOM (H-2/H-4) PHASE 1 CO2 FIRE SUP OFOIGM-001 152 GAS ROOM (H-5) PHASE 1 Ar CFCIGM-009 152 GAS ROOM (H-5) PHASE 1 He CFCIGM-010 152 GAS ROOM (H-5) PHASE 1 N2O CFCIGM-011 152 GAS ROOM (H-5) PHASE 1 O2 CFCIGM-012 152 GAS ROOM (H-5) PHASE 1 SF6 CFCIGC-001 153 FLAM. GAS ROOM (H-2/H-4) PHASE 1 PH3 CFCIGC-002 153 FLAM. GAS ROOM (H-2/H-4) PHASE 1 AsH3 CFCIGC-004 153 FLAM. GAS ROOM (H-2/H-4) PHASE 1 GeH4 CFCIGC-005 153 FLAM. GAS ROOM (H-2/H-4) PHASE 1 CH4 CFCIGC-010 153 FLAM. GAS ROOM (H-2/H-4) PHASE 1 200-300 PPM Si2H6 IN H2 CFCIGC-013 153 FLAM. GAS ROOM (H-2/H-4) PHASE 1 SiH(CH3)3 CFCIGC-016 153 FLAM. GAS ROOM (H-2/H-4) PHASE 1 5%B2H6 IN H2 CFCIGC-019 153 FLAM. GAS ROOM (H-2/H-4) PHASE 1 Si2H6 CFCILC-001 153 FLAM. GAS ROOM (H-2/H-4) PHASE 1 LEAKER CAB CFCISCRB-001 153 FLAM. GAS ROOM (H-2/H-4) PHASE 1 DRY ABATE CFCISCRB-004 153 FLAM. GAS ROOM (H-2/H-4) PHASE 1 DRY ABATE CFCISS-021 153 FLAM. GAS ROOM (H-2/H-4) PHASE 1 SAFETY SHOWER CFCIGC-006 154 CORR. /OX. GAS ROOM (H-3/H-4) PHASE 1 Cl2 CFCIGC-009 154 CORR. /OX. GAS ROOM (H-3/H-4) PHASE 1 HCl CFCIGC-012 154 CORR. /OX. GAS ROOM (H-3/H-4) PHASE 1 5% CI2 IN N2 CFCIGC-015 154 CORR. /OX. GAS ROOM (H-3/H-4) PHASE 1 NO CFCILC-002 154 CORR. /OX. GAS ROOM (H-3/H-4) PHASE 1 LEAKER CAB CFCISCRB-009 154 CORR. /OX. GAS ROOM (H-3/H-4) PHASE 1 DRY ABATE CFCISCRB-014 154 CORR. /OX. GAS ROOM (H-3/H-4) PHASE 1 DRY ABATE CFCISS-019 154 CORR. /OX. GAS ROOM (H-3/H-4) PHASE 1 SAFETY SHOWER CFCISS-018 155 CORR. LIQUID ROOM (H-3/H-4) PHASE 1 SAFETY SHOWER CFCI
Phase 1 Equipment Schedule- Table 1
Tool ID Room: Number Room: Name Phasing Description Responsibility
CVD-001 240G CVD PHASE 1 LPCVD OR RTCVDPOLYCRYST/AMORPH -SiGe: Si-C, ASi
OFOI
CVD-001.01 149 SUBFAB PHASE 1 DRY PUMP OFOICVD-001.02 149 SUBFAB PHASE 1 DRY PUMP OFOICVD-001.03 149 SUBFAB PHASE 1 DRY PUMP OFOICVD-001.05 149 SUBFAB PHASE 1 CONTROLLER PM 1 & MAIN OFOICVD-001.06 149 SUBFAB PHASE 1 HEAT EXCHANGER-PM-1 OFOICVD-001.07 149 SUBFAB PHASE 1 TM & LL PUMP OFOICVD-001.08 149 SUBFAB PHASE 1 HEAT EXCHANGER-PM-2 OFOICVD-001.09 149 SUBFAB PHASE 1 HEAT EXCHANGER-PM-3 OFOICVD-001.10 149 SUBFAB PHASE 1 DRY PUMP OFOICVD-001.11 149 SUBFAB PHASE 1 HEAT EXCHANGER-PM-4 OFOICVD-001.12 149 SUBFAB PHASE 1 CONTROLLER PM 2 OFOICVD-001.13 149 SUBFAB PHASE 1 CONTROLLER PM 3 OFOICVD-001.14 149 SUBFAB PHASE 1 CONTROLLER PM 4 OFOICVD-001.15 240G CVD PHASE 1 COMPUTER OFOICVD-002/005 240G CVD PHASE 1 PECVD- SiO2, SiON, Si3N4,
SiNOFOI
CVD-002/005.01
149 SUBFAB PHASE 1 DRY PUMP OFOI
CVD-002/005.02
149 SUBFAB PHASE 1 DRY PUMP OFOI
CVD-002/005.03
149 SUBFAB PHASE 1 DRY PUMP OFOI
CVD-002/005.05
149 SUBFAB PHASE 1 CONTROLLER PM-1 & MAIN OFOI
CVD-002/005.06
149 SUBFAB PHASE 1 HEAT EXCHANGER OFOI
CVD-002/005.07
149 SUBFAB PHASE 1 TM & LL PUMP OFOI
CVD-002/005.08
149 SUBFAB PHASE 1 HEAT EXCHANGER OFOI
CVD-002/005.09
149 SUBFAB PHASE 1 HEAT EXCHANGER OFOI
CVD-002/005.10
149 SUBFAB PHASE 1 DRY PUMP OFOI
CVD-002/005.11
149 SUBFAB PHASE 1 HEAT EXCHANGER OFOI
CVD-002/005.12
149 SUBFAB PHASE 1 CONTROLLER PM-2 OFOI
CVD-002/005.13
149 SUBFAB PHASE 1 CONTROLLER PM-3 OFOI
CVD-002/005.14
149 SUBFAB PHASE 1 CONTROLLER PM-1 OFOI
CVD-002/005.15
240G CVD PHASE 1 COMPUTER OFOI
EPI-001 240C MOCVD 1 PHASE 1 EPI Si, SigE, Ge OFOIEPI-001.01 149 SUBFAB PHASE 1 POWER DIST. MODULE OFOIEPI-001.02 240C MOCVD 1 PHASE 1 TOOL INTERFACE MODULE OFOIEPI-001.03 240C MOCVD 1 PHASE 1 SIDECAR GAS PURF OFOIEPI-001.04 149 SUBFAB PHASE 1 SCROLL PUMP OFOIEPI-001.05 240C MOCVD 1 PHASE 1 MAINT. CART OFOIEPI-001.06 149 SUBFAB PHASE 1 PUMP PKG. OFOIEPI-001.07 240C MOCVD 1 PHASE 1 VAPOR DELIVERY SYS. OFOIMET-002 240A WAFER STARTS PHASE 1 WAFER SORTER OFOIMET-005 240C MOCVD 1 PHASE 1 AFM OFOIMET-005.01 240C MOCVD 1 PHASE 1 COMPUTER OFOIMET-005.03 240C MOCVD 1 PHASE 1 AIR TABLE VIBRATION
ISOLATIONOFOI
MET-005.04 240Q UNASSIGNED CLASS 1,000CLEANROOM SPACE
PHASE 1 NANODRIVE CONTROLLER OFOI
MET-006 240C MOCVD 1 PHASE 1 VASE OFOIMET-006.01 240C MOCVD 1 PHASE 1 COMPUTER OFOIMET-007 240F METROLOGY PHASE 1 3D MICROSCOPE OFOIMET-007.01 240F METROLOGY PHASE 1 COMPUTER OFOIMET-008 240F METROLOGY PHASE 1 RAMAN W/ WFR HNDLNG OFOIMET-008.01 240F METROLOGY PHASE 1 COMPUTER OFOIMET-011 240F METROLOGY PHASE 1 SURFACE DEFECT OFOI
Phase 1 Equipment Schedule-Table 2
Tool ID Room: Number Room: Name Phasing Description Responsibility
MET-014 240F METROLOGY PHASE 1 PHOTOLUMINESCENCE OFOIMOCVD-001 240E MOCVD 3 PHASE 1 CNT/GRAPHENE OFOIMOCVD-001.01 149 SUBFAB PHASE 1 DRY PUMP OFOIMOCVD-001.02 240E MOCVD 3 PHASE 1 REMOTE PC OFOIMOCVD-001ALT
240E MOCVD 3 PHASE 1 SiC PECVD OFOI
MOCVD-001ALT .01
149 SUBFAB PHASE 1 CHAMBER PUMP OFOI
MOCVD-001ALT .02
149 SUBFAB PHASE 1 LL VACUUM PUMP OFOI
MOCVD-001ALT .03
149 SUBFAB PHASE 1 POWER/CONTROL RACK OFOI
MOCVD-001ALT .04
240E MOCVD 3 PHASE 1 COMPUTER CART OFOI
MOCVD-001ALT .05
149 SUBFAB PHASE 1 CHILLER OFOI
MOCVD-004 240D MOCVD 2 PHASE 1 EPI III-V OFOIMOCVD-004.01 149 SUBFAB PHASE 1 MPDU OFOIMOCVD-004.02 240D MOCVD 2 PHASE 1 REMOTE PC OFOIMOCVD-004.03 149 SUBFAB PHASE 1 TM VAC PUMP 1 OFOIMOCVD-004.04 149 SUBFAB PHASE 1 TM VAC PUMP 2 OFOIMOCVD-004.04 149 SUBFAB PHASE 1 CHILLER 2 PM2 OFOIMOCVD-004.05 149 SUBFAB PHASE 1 PROC DIFF PUMP OFOIMOCVD-004.06 149 SUBFAB PHASE 1 PRE-CLEAN DIFF PUMP OFOIMOCVD-004.07 149 SUBFAB PHASE 1 PM1 PROCESS PUMPS OFOIMOCVD-004.08 149 SUBFAB PHASE 1 PM1 PUMP NO.2
PRE-CLEANOFOI
MOCVD-004.09 149 SUBFAB PHASE 1 TM VAC PUMP 3 OFOIMOCVD-004.10 149 SUBFAB PHASE 1 PM1
CHILLER-SHOWERHEADOFOI
MOCVD-004.11 149 SUBFAB PHASE 1 PM1 CHILLER-CHAMBERPROC
OFOI
MOCVD-004.12 149 SUBFAB PHASE 1 PM1 CHILLER-CHAMBERCOOLING
OFOI
MOCVD-004.13 240D MOCVD 2 PHASE 1 PM1 VAPORSTATION OFOIMOCVD-004.14 149 SUBFAB PHASE 1 PM2 PUMP NO.2
PRE-CLEANOFOI
MOCVD-004.15 149 SUBFAB PHASE 1 PM2 PUMP NO.1 OFOIMOCVD-004.16 149 SUBFAB PHASE 1 PM2 CHILLER-CHAMBER
PROCOFOI
MOCVD-004.17 149 SUBFAB PHASE 1 PM2CHILLER-SHOWERHEAD
OFOI
MOCVD-004.18 149 SUBFAB PHASE 1 PM2 CHILLER-CHAMBERCOOLING
OFOI
MOCVD-004.29 240D MOCVD 2 PHASE 1 PM2 VAPORSTATION OFOIMOCVD-004.30 240D MOCVD 2 PHASE 1 PM3 VAPORSTATION OFOIMOCVD-004.31 240D MOCVD 2 PHASE 1 PM4 VAPORSTATION OFOIMOCVD-004.32 149 SUBFAB PHASE 1 HPDU OFOIMOCVD-005ALT
240C MOCVD 1 PHASE 1 Gan/ALGaN OFOI
MOCVD-005ALT.01
149 SUBFAB PHASE 1 MPDU OFOI
MOCVD-005ALT.02
240C MOCVD 1 PHASE 1 REMOTE PC OFOI
MOCVD-005ALT.03
149 SUBFAB PHASE 1 TM VAC PUMP 1 OFOI
MOCVD-005ALT.04
149 SUBFAB PHASE 1 TM VAC PUMP 2 OFOI
MOCVD-005ALT.05
149 SUBFAB PHASE 1 PROC DIFF PUMP OFOI
MOCVD-005ALT.07
149 SUBFAB PHASE 1 PM1 PROCESS PUMPS OFOI
MOCVD-005ALT.08
149 SUBFAB PHASE 1 PM1 PUMP NO.2PRE-CLEAN
OFOI
MOCVD-005ALT.10
149 SUBFAB PHASE 1 PM1CHILLER-SHOWERHEAD
OFOI
MOCVD-005ALT.11
149 SUBFAB PHASE 1 PM1 CHILLER-CHAMBERPROC
OFOI
MOCVD-005ALT.12
149 SUBFAB PHASE 1 PM1 CHILLER-CHAMBERCOOLING
OFOI
MOCVD-005ALT.13
240C MOCVD 1 PHASE 1 PM1 VAPORSTATION OFOI
MOCVD-005ALT.14
149 SUBFAB PHASE 1 PM2 PUMP NO.2PRE-CLEAN
OFOI
MOCVD-005ALT.15
149 SUBFAB PHASE 1 PM2 PUMP NO.1 OFOI
MOCVD-005ALT.16
149 SUBFAB PHASE 1 PM2 CHILLER-CHAMBERPROC
OFOI
MOCVD-005ALT.17
149 SUBFAB PHASE 1 PM2CHILLER-SHOWERHEAD
OFOI
MOCVD-005ALT.18
149 SUBFAB PHASE 1 PM2 CHILLER-CHAMBERCOOLING
OFOI
MOCVD-005ALT.29
240C MOCVD 1 PHASE 1 PM2 VAPORSTATION OFOI
MOCVD-005ALT.30
240C MOCVD 1 PHASE 1 PM3 VAPORSTATION OFOI
MOCVD-005ALT.31
240C MOCVD 1 PHASE 1 PM4 VAPORSTATION OFOI
MOCVD-005ALT.32
149 SUBFAB PHASE 1 HPDU OFOI
Phase 1 Equipment Schedule-Table 3
Tool ID Room: Number Room: Name Phasing Description Responsibility
PURH2-001 149 SUBFAB PHASE 1 H2 PURIF OFOIPURH2-002 149 SUBFAB PHASE 1 H2 PURIF OFOIPURN2-001 149 SUBFAB PHASE 1 N2 PURIF OFOIPURN2-002 149 SUBFAB PHASE 1 N2 PURIF OFOIPURN2-003 149 SUBFAB PHASE 1 N2 PURIF GAS VENDORPURNH3-001 149 SUBFAB PHASE 1 NH3 PURIF OFOISCRB-005 149 SUBFAB PHASE 1 DRY ABATE OFOISCRB-006 149 SUBFAB PHASE 1 DRY ABATE OFOISCRB-007 149 SUBFAB PHASE 1 DRY ABATE OFOISCRB-008 149 SUBFAB PHASE 1 DRY ABATE OFOISCRB-010 149 SUBFAB PHASE 1 DRY ABATE OFOISCRB-011 149 SUBFAB PHASE 1 THER/WET ABATE OFOISS-006 149 SUBFAB PHASE 1 SAFETY SHOWER CFCISS-011 149 SUBFAB PHASE 1 SAFETY SHOWER CFCISTOCK-001 240B STOCKERS PHASE 1 WAFER STOCKER OFOISTOCK-002 240B STOCKERS PHASE 1 WAFER STOCKER OFOISUP-002 240H PARTS CLEAN PHASE 1 FOUP CLEANER OFOISUP-003 240H PARTS CLEAN PHASE 1 BOTTLE WASH OFOIVMB-001 149 SUBFAB PHASE 1 PH3 CFCIVMB-002 149 SUBFAB PHASE 1 AsH3 CFCIVMB-004 149 SUBFAB PHASE 1 GeH4 CFCIVMB-005 149 SUBFAB PHASE 1 CH4 CFCIVMB-006 149 SUBFAB PHASE 1 Cl2 CFCIVMB-009 149 SUBFAB PHASE 1 HCl CFCIVMB-010 149 SUBFAB PHASE 1 200 TO 300 DISILANE IN H2 CFCIVMB-013 149 SUBFAB PHASE 1 (CH3)3SiH CFCIVMB-014 149 SUBFAB PHASE 1 BLUE NH3 CFCIVMB-015 149 SUBFAB PHASE 1 NO CFCIVMB-016 149 SUBFAB PHASE 1 5%B2H6 IN H2 CFCIVMB-019 149 SUBFAB PHASE 1 SI2H6 CFCIVMB-022 149 SUBFAB PHASE 1 5% Cl2 IN N2 CFCIVMB-023 149 SUBFAB PHASE 1 SiH4 CFCIVMB-024 149 SUBFAB PHASE 1 NH3 CFCIVMB-025 149 SUBFAB PHASE 1 H2 CFCIVMB-026 149 SUBFAB PHASE 1 H2 CFCIWASTE-001 149 SUBFAB PHASE 1 SOLVENT COLLECTION OFOIWASTE-005 149 SUBFAB PHASE 1 HF COLLECTION OFOIWP-002 240J WET PROCESS PHASE 1 PRE GATE CLEAN- PRE EPI
CLEAN SILICON BASEDOFOI
WP-002.01 240J WET PROCESS PHASE 1 ELECTRICAL BOX OFOIWP-002.02 149 SUBFAB PHASE 1 UPS CABINET OFOIWP-002.03 149 SUBFAB PHASE 1 HOT DIW UNIT 144KW OFOIWP-002.04 149 SUBFAB PHASE 1 CSU CABINET OFOIWP-002.05 149 SUBFAB PHASE 1 CSB COOLING UNIT OFOIWP-002.06 149 SUBFAB PHASE 1 COOLING TANK OFOIWP-002.07 149 SUBFAB PHASE 1 CO2 UNIT OFOIWP-002.08 149 SUBFAB PHASE 1 A BOX OFOIWP-002.09 149 SUBFAB PHASE 1 CO2 UNIT OFOIWP-002.10 149 SUBFAB PHASE 1 CO2 UNIT OFOIWP-002.11 149 SUBFAB PHASE 1 CO2 UNIT OFOIWP-002.12 149 SUBFAB PHASE 1 HOT DIW UNIT 72 KW OFOIWP-011 240J WET PROCESS PHASE 1 WET BENCH- BASE OFOIWP-012 240H PARTS CLEAN PHASE 1 WET BENCH- SOLVENT OFOIWP-012.01 240H PARTS CLEAN PHASE 1 CO2 FIRE SUP OFOIWP-013 240J WET PROCESS PHASE 1 WET BENCH- SPINNER OFOIWP-013.01 240J WET PROCESS PHASE 1 CO2 FIRE SUP OFOIWP-015 240G CVD PHASE 1 WET BENCH- ACID OFOIWP-017 240J WET PROCESS PHASE 1 SRD OFOIWP-018 240G CVD PHASE 1 SRD OFOIWP-019 240J WET PROCESS PHASE 1 SRD OFOIWP-022 240J WET PROCESS PHASE 1 WET BENCH- ACID PARTS
CLEANOFOI
WP-023 240J WET PROCESS PHASE 1 WET BENCH- ACID PARTSCLEAN
OFOI
WP-024 240H PARTS CLEAN PHASE 1 SOLV PARTS CLEAN OFOIWP-024.01 240H PARTS CLEAN PHASE 1 CO2 FIRE SUP OFOIWP-025 240H PARTS CLEAN PHASE 1 ACID PARTS CLEAN OFOI
NOTES:1. ALL TOOLS AND EQUIPMENT ARE OWNER-FURNISHED/OWNER-INSTALLED (OFOI) UNLESS NOTED OTHERWISE IN THE RESPONSIBILITY COLUMN OF EACH SCHEDULE ON THIS SHEET. ALL CONTRACTOR-FURNISHED/ CONTRACTOR-INSTALLED (CFCI) ITEMS ARE SHADED IN THE RESPONSIBILITY COLUMN.
2. REFER TO CRQ PLAN SHEETS FOR EQUIPMENT TAGS AND LAYOUT.
3. THE SCHEDULES ON THIS SHEET ARE FOR PHASE 1 EQUIPMENT ITEMS ONLY. PHASE 2 ITEMS AS SHOWN ON THE CRQ PLAN SHEETS DENOTED AS SUCH ARE FOR REFERENCE PURPOSES ONLY AND ARE NOT IN CONTRACT.
1
1
1
2