Page 1: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

SolFocus Concentrator PhotovoltaicsSolFocus Concentrator PhotovoltaicsA I d iA I d iAn IntroductionAn IntroductionSeptember, 2010

© SolFocus, Inc. 2010Patents Pending

Page 2: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Today’s DiscussionToday’s Discussion

What it is and How it WorksValue PropositionValue PropositionAdvantages of this DesignApplication and Deploymentspp p yDiscussion and Q&A

Slide 2Patents Pending © SolFocus, Inc. 2010

Page 3: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Wh t it i dWh t it i dWhat it is and What it is and How it WorksHow it Works

Slide 3Patents Pending © SolFocus, Inc. 2010

Page 4: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

SolFocusSolFocus CPV Technology CPV Technology

Concentrating Optical System: 650X ConcentrationHigh Efficiency Multi junction PV Cells: 40% EfficientHigh Efficiency Multi-junction PV Cells: ~40% EfficientDual Axis Tracking: Higher Yield and Match to Demand

Slide 4Patents Pending © SolFocus, Inc. 2010

Page 5: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

SolFocusSolFocus CPV SystemCPV System

Power Unit CPV Panel CPV System

Cassegrain Imaging ConcentratorPrimary Mirror, Secondary Mirror

Receiver UnitTertiary Non-imaging OpticMulti-junction CellHeat Spreader

20 Power Units for 330 Watt Rated Power

28 Panels Mounted on Dual-AxisTracker; 9.24 kW Rated Power

Slide 5Patents Pending © SolFocus, Inc. 2010

p

Page 6: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

S lF CPVS lF CPVSolFocus CPV SolFocus CPV Value PropositionValue Proposition

Slide 6Patents Pending © SolFocus, Inc. 2010

Page 7: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

SolFocus CPV Value PropositionSolFocus CPV Value Proposition

L t C t f E iLowest Cost of Energy in Target Locations

Highest Energy Output

Lowest Environmental Impact

Deployment Flexibility & Speed

Proven Quality and yReliability

Slide 7Patents Pending © SolFocus, Inc. 2010

Page 8: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Lowest Energy Cost In Target LocationsLowest Energy Cost In Target Locations

Highest Energy Production + Increasing Efficiency

Decreasing Manufacturing Costs= Lowest LCOE in Target Markets

Best Si PV Tracked Thin Film

• LCOE numbers encompass all costs including equipment, installation, BOS, repair and replace, maintenance• LCOE calculations assume consistent financial parameters: inflation 2 5%; real discount rate of 7 5%

Slide 8Patents Pending © SolFocus, Inc. 2010

LCOE calculations assume consistent financial parameters: inflation 2.5%; real discount rate of 7.5%• Source - industry reported data through 2010, projections through 2012• LCOE CSP from: CREDIT SUISSE Equity Research Concentrated Solar Power, September 16 2009

Page 9: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

High Energy YieldHigh Energy Yield

Higher Consistent Energy Production

900

1,200

W)

600

900

er O

utpu

t (kW

0

300

4 00 8 00 12 00 16 00 20 00

Pow SolFocus-CPV

Typical C-Si-Fixed TiltTypical Thin Film-Fixed TiltTypical C-Si One-Axis Tracking PV

4:00 8:00 12:00 16:00 20:00

Consistent Energy Production; Ideal Match to Demand Curve

Slide 9Patents Pending © SolFocus, Inc. 2010

gy

Page 10: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Efficiencies Continue to RiseEfficiencies Continue to Rise

30% CPV Best PV Typical PV Best Thin Film

25%

30%

ency

CPV Best PV Typical PV Best Thin Film

20%

ated

Effi

cie

10%

15%Ra

10%2008 2009 2010 2011 2012

Slide 10Patents Pending © SolFocus, Inc. 2010

Page 11: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Lowest Environmental ImpactLowest Environmental Impact

Optimum Use of LandNo Permanent ShadowingPreserved Wildlife Corridors

Land use for site generating 1 GWh/Year with:SolFocus 25% CPV11% Effi i Thi FilPreserved Wildlife Corridors

Minimized Water Runoff ErosionDistributed Generation

Best in Class Thin Film Land Use: 2.3 acres

SolFocus Land Use: 2.0 acres

11% Efficient Thin Film

Dual Land Usage PossibleFlexible Layout of SitesMinimal Land Coverage/Disruption

Best in Class Thin FilmPermanent Shading: 1.2 acres

SolFocus Panels: 0.4 acres

SolFocus Land Impact: 0.01 acres

Assumptions: SolFocus: 25% efficiency, 20% GCR; Thin Film 11% efficiency, 50% GCR , High DNI location (7.5+ DNI)

Slide 11Patents Pending © SolFocus, Inc. 2010

Page 12: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Deployment Flexibility and SpeedDeployment Flexibility and Speed

Highly Scalable: 100 kW to 100 MW+Commercial, Industrial, Utility Applications, , y ppFast Deployment, Phased Commissioning, Rapid Revenue Terrain Tolerance Without DisruptionHigh Energy Yield Distributed Generation Near Use Points

20-100+ MW Utility 1 MW Community College

1 2 MW Distributed

Slide 12Patents Pending © SolFocus, Inc. 2010

y1.2 MW Distributed80 kW Parcels

Page 13: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Proven Quality And ReliabilityProven Quality And Reliability

Proven Reliable Product• Certification: IEC 62108, CEC-listed,• Field Performance Data: 3 years on sun• ~250 million cell hours on sunPredictable Performance and CostPredictable Performance and Cost• Validated Performance and Financial Models• LCOE Analysis: Advanced modelingThird Party ValidationsThird Party Validations• Diligence Reports:

▫ Black & Veatch▫ GarriguesGarrigues

• Validated Field Data: ISFOC, PAW, APS• Validated Energy and Cost Modeling

Slide 13Patents Pending © SolFocus, Inc. 2010

Page 14: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Ad t fAd t fAdvantages of Advantages of this Designthis Design

Slide 14Patents Pending © SolFocus, Inc. 2010

Page 15: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Designed for LowDesigned for Low--Cost ManufacturingCost ManufacturingAutomated Volume ManufacturingScalable and Global Manufacturing Capabilities• 50MW capacity 2010p y• 100MW capacity in 2011

Total Manufacturing CapEx: $0.18-$0.24/watt• vs. $2 for Thin Film and $1.25 for Silicon PV

Manufacturing Capex ($/watt)

$0.21

$1.25

$2.00

SolFocus CPV

Silicon PV

Thin Film

DSBJ Manufacturing Partner, China

Panel Assembly 50MW and Scalable

Meikle AutomationKitchener, Ontario

Module Assembly Equipment

Hexin Manufacturing Partner, China

Tracker Mfg, China100MW Capacity

Applied Manufacturing Technologies,

MichiganManufacturing Development

Primary Mirror ManufacturingMesa, Arizona

32MW and Scalable

Slide 15Patents Pending © SolFocus, Inc. 2010

World-Class Manufacturing Capabilities and Partners

Manufacturing Development

Page 16: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

SolFocus: Factory to FieldSolFocus: Factory to Field

Slide 16Patents Pending © SolFocus, Inc. 2010

Page 17: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Designed for Performance and ReliabilityDesigned for Performance and Reliability

SolFocus Utilizes Reflective versus Refractive OpticsRugged, Field-Proven Materials: Glass, Aluminum, SteelSignificantly More Compact Panel (folded light path)Hi h A t A lHigher Acceptance AngleGreater Flexibility for Future ImprovementsElectric drive tracker

Slide 17Patents Pending © SolFocus, Inc. 2010

Page 18: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

A li ti dA li ti dApplications and Applications and DeploymentsDeployments

Slide 18Patents Pending © SolFocus, Inc. 2010

Page 19: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Application of Application of SolFocusSolFocus CPV in US CPV in US

High Solar Resource Regions• U.S. Southwest, Western Plains, High Desert

Slide 19Patents Pending © SolFocus, Inc. 2010

Page 20: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Global Commercial DeploymentsGlobal Commercial Deployments

Operating or Under ConstructionPalo Alto Wastewater (2007)APS Star Test Facility, Tempe Arizona (2007)

ContractedADP Public Utility, Portugal (2010)Mesa Water, Mesa, Arizona (2010)

KGO, Fremont, California (2008)NELHA, Kona, Hawaii (2008)ISFOC, Spain (2008)EDF Utility, Italy (2009)Victor Valley College Victorville CA (2010)

Others Pending Public Announcement

Victor Valley College, Victorville, CA (2010)Volkswagen, Puebla, Mexico (2010)Salida, Colorado (2010)Alice Springs Airport, Australia (2010)SDG&E San Diego (2010)

Slide 20Patents Pending © SolFocus, Inc. 2010

BECC, Juarez, Mexico (2010)Crete, Greece (2010)

Page 21: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Victor Valley College Victor Valley College –– 1 MW1 MWVictorville, CA; 7.2 DNICompetitive RFP

• 6 best and final proposals; beat best in class SiPV tracked• 6 best and final proposals; beat best in class SiPV tracked, fixed tilt SiPV and thin film

122 arrays; 6 acres2 5 million kWh/year2.5 million kWh/year• 30% of colleges electricity demand

Rapid DeploymentM h 2010 d b k• March 2010 ground break

• May 2010 completionCollege Economic Analysis*

$• Project cost $4.7M• Estimated LCOE without incentives 8.5¢/kWh• Payback period: 5 years

*College project primarily funded by low cost capitalbonds; reported LCOE reflects the low cost of capital.

Slide 21Patents Pending © SolFocus, Inc. 2010

Largest CPV Plant in North America

Page 22: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Case Study: Crete Case Study: Crete –– 1.24 MW1.24 MW

Island of Crete, Greece 1.24MW in small distributed generation sites to maximize FITsites to maximize FITEnviron 1: seven 84kW sitesEnviron 2: four 80kW sitesEnviron 3: four 80kW sitesSolFocus systems deployable on challenging terrain

Slide 22Patents Pending © SolFocus, Inc. 2010

Page 23: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Predictable PerformancePredictable Performance

ISFOC Puertollano: Actual PR: 88.7%, modeled PR: 87.0%

200 kW-DC site (33 arrays) in Puertollano, SpainSF-1000 CPV SystemOperational since Nov 2008

Palo Alto Water: Actual PR: 90.3%, modeled PR: 89.1%

1Daily Performance Ratio ‐ Palo Alto Water

Operational since Nov 2008

0.4

0.6

0.8

1

0

0.2

3/28/2009 7/6/2009 10/14/2009 1/22/2010 5/2/2010 8/10/2010

Measured PR

Mean Expected PR8.4kW array in Palo Alto, CASF-1100 CPV SystemOperational since May 2009

Slide 23Patents Pending © SolFocus, Inc. 2010

Actual performance consistent with predicted values at SolFocus sites

Page 24: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Discussion and Q&ADiscussion and Q&A

Phil MetzPhil MetzDirector of Business [email protected] +1 (408) 821-8059 Mobile

Slide 24Patents Pending © SolFocus, Inc. 2010

+1 (408) 821 8059 Mobile

Page 25: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

B k SlidB k SlidBackup SlidesBackup Slides

Slide 25Patents Pending © SolFocus, Inc. 2010

Page 26: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

High Energy YieldHigh Energy Yield

10MW Solar Farm - Energy Output by Location and Technology

Low Temperature Degradation and Dual Axis Tracking Provide

Slide 26Patents Pending © SolFocus, Inc. 2010

p g gHighest Energy Yield in Target Markets

Page 27: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Lowest Environmental ImpactLowest Environmental Impact

Best Cradle-to-Cradle FootprintL Lif l GHG I t it– Low Lifecycle GHG Intensity

– High Recyclability (97%)– Short Energy Payback

No Water Consumption

Slide 27Patents Pending © SolFocus, Inc. 2010

Page 28: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Global Application of SolFocus CPVGlobal Application of SolFocus CPV

Slide 28Patents Pending © SolFocus, Inc. 2010

Page 29: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Case Study: Alice Springs AirportCase Study: Alice Springs AirportAlice Springs Airport, Australia; 7.2 DNI

Competitive RFP• Beat best-in-class thin film and best in class

SiPV• Selected based on “price and iconic

technology”28 Arrays for 235kW providing 30% of the Airport’s28 Arrays for 235kW providing 30% of the Airport’s energy demandRapid Deployment• Ground breaking May ‘10

Note: Image of projected deployment.

Ground breaking May 10• Completion estimation Aug ‘10

Slide 29Patents Pending © SolFocus, Inc. 2010

Page 30: SolFocus Concentrator Photovoltaics - ISETC · Today’s Discussion What it is and How it Works Value PropositionValue Proposition Advantages of this Design Apppp p ylication and

Field Experience Field Experience

10 kW site in Tempe, AZOver 3 years of field experience: 45,000+

i h

APS Star Center

receiver hours on sunIntensive engineering & reliability studies on SF1000 & SF1100

Over 3 years of field data show reliable energy production

Slide 30Patents Pending © SolFocus, Inc. 2010