Page 1: Department Heads Meeting N b 1 2012November 15, 2012...Charlotte Chang & Laurie Escudero » Conference apppp proval process Comments » Interpretations being made at the Site Office

Department Heads MeetingN b 1 2012November 15, 2012

David B. MacFarlane

Page 2: Department Heads Meeting N b 1 2012November 15, 2012...Charlotte Chang & Laurie Escudero » Conference apppp proval process Comments » Interpretations being made at the Site Office

Visitors

Charlotte Chang & Laurie Escudero» Conference approval processpp p

Comments» Interpretations being made at the Site Office level, leading to

inconsistencies across the complexinconsistencies across the complex» Working on finding a way to exempt operational meetings

within formal HEP collaborations» Attention level rising within DOE e g NLDC call for data» Attention level rising within DOE, e.g., NLDC call for data

2Department Heads: November 15, 2012

Page 3: Department Heads Meeting N b 1 2012November 15, 2012...Charlotte Chang & Laurie Escudero » Conference apppp proval process Comments » Interpretations being made at the Site Office

Science program dates and news

SPC meeting [Nov 1-2]» Talks available on SharePoint site

US-China [Nov 5-6] in Daya Bay Status of LBNE effort

CD 1 i d t d O t 30 N 1» CD-1 review conducted Oct 30-Nov 1» Application for membership being prepared

Status of investigation of second DM experiment Launching development of FY2013 PPA Research Plan

» First draft input due by Dec 7 (3 weeks)

3Department Heads: November 15, 2012

Page 4: Department Heads Meeting N b 1 2012November 15, 2012...Charlotte Chang & Laurie Escudero » Conference apppp proval process Comments » Interpretations being made at the Site Office

Options under consideration: LZ and Darkside

Opportunity:» Migrate experienced core group from

f S ffformer SuperB effort» DOE/NSF G2 decision in late 2013

LZ: Homestake, SDLZ

» 2-phase liquid Xe, 8 Tons» Partner with LBNL, DOE-led

Darkside: Gran Sasso, Italy, y» 2-phase liquid Ar, 5 Tons» Partner with Fermilab, NSF-led

SLAC roleSLAC role» Project management, cryogenic

systems, DAQ, low background electronics & detector systems

4Department Heads: November 15, 2012

Page 5: Department Heads Meeting N b 1 2012November 15, 2012...Charlotte Chang & Laurie Escudero » Conference apppp proval process Comments » Interpretations being made at the Site Office

FY2013 Research Plan: Content

Overall PPA goals Energy Frontier

Intensity Frontier» BABAR Sciencegy

» ATLAS» SiD» Particle Physics Theory

» EXO-200 Science & Operations

» HPS Science» Particle Physics Theory

Cosmic Frontier» CDMS Science

» LBNE & MicrBooNE

Professional CentersD t t R&D

» DES Science» Fermi ISOC» Fermi Science

» Detector R&D» REGE» REGM

» Fermi Science» KIPAC Theory» LSST Science

» SCA» BABAR D&D

5Department Heads: November 15, 2012

Page 6: Department Heads Meeting N b 1 2012November 15, 2012...Charlotte Chang & Laurie Escudero » Conference apppp proval process Comments » Interpretations being made at the Site Office

Example: Cryogenic Dark Matter Search

Critical Outcomes» Enable next generation Ge dark matter search experiments g p

with two orders of magnitude improvement in sensitivity to dark matter interactions

Strategic goalsg g» Initiate construction of SuperCDMS-SNOLAB, a second

generation Ge dark matter search experiment» Begin planning for a third generation Ge dark matter search» Begin planning for a third generation Ge dark matter search

experiment

6Department Heads: November 15, 2012

Page 7: Department Heads Meeting N b 1 2012November 15, 2012...Charlotte Chang & Laurie Escudero » Conference apppp proval process Comments » Interpretations being made at the Site Office

CDMS Accomplishments in FY11 [→FY12]

Completed detector fabrication for SuperCDMS-Soudan Fabrication equipment modified for 100mm detectorsq p 100mm detector housings designed and fabricated 100 mm ionization detector fabricated Successful cryogenic test of 100mm ionization detector Spiral masks completed for testing 100mm IZip charge

collection Fabricated cryogenic tails and completed safety

improvements at SUF to support STF dilution fridge modsInitial release of new background simulation framework Initial release of new background simulation framework

Cryogenic charge and phonon transport implemented in GEANT4

7Department Heads: November 15, 2012

Page 8: Department Heads Meeting N b 1 2012November 15, 2012...Charlotte Chang & Laurie Escudero » Conference apppp proval process Comments » Interpretations being made at the Site Office

CDMS Goals for FY12 [→FY13]

Demonstrate fab throughput of 6 IZip detectors / month (Brink, Hasi, Tomada, Resch - done)

Procure 100mm Ge crystals for vendor qualification (Partridge – April 2012)

Characterize 100mm charge collection performance (Brandt Characterize 100mm charge collection performance (Brandt, Brink – May 2012)

Fabricate and test a 100mm IZip (phonon + ionization) (B i k H i T d R h A t 2012)(Brink, Hasi, Tomada, Resch – August 2012)

Procure SQUID arrays for phonon readout (Partridge – June 2012)

8Department Heads: November 15, 2012

Page 9: Department Heads Meeting N b 1 2012November 15, 2012...Charlotte Chang & Laurie Escudero » Conference apppp proval process Comments » Interpretations being made at the Site Office

CDMS Goals for FY12 [→FY13]

Complete design of Ge tower engineering model, including detector housings, cold electronics for charge and phonon readout, and mechanical / thermal design (Brink, Craddock, Godfrey, Nelson, Partridge – September 2012)

Commission SUF fridge + new tails & ship to FNAL (Brandt,Commission SUF fridge new tails & ship to FNAL (Brandt, Brink, Craddock, Racine – June 2012)

Validate and release GEANT4-based detector MC (Asai, Brandt May 2012)Brandt – May 2012)

Apply the MC Framework for shielding design studies (Kelsey, Wright – March 2012)

9Department Heads: November 15, 2012

Page 10: Department Heads Meeting N b 1 2012November 15, 2012...Charlotte Chang & Laurie Escudero » Conference apppp proval process Comments » Interpretations being made at the Site Office

Example: Cryogenic Dark Matter Search

Strengths» Strong expertise in detector fabrication achieved through hiringg p g g» Expertise / resources in Research Electronics group is extremely

valuable» Talented / experienced group in background and detectorTalented / experienced group in background and detector

simulations» Close association with Stanford CDMS group, Nanofabrication

FacilityFacility Weaknesses

» Not sufficiently engaged in SuperCDMS-Soudan physicsSLAC h i d i i b K l i i t l i» SLAC has no experience designing sub-Kelvin experiment, relying on Caltech & Berkeley to provide expertise in cold mechanics

» Need for project support (administrative, planning, system i i )engineering)

10Department Heads: November 15, 2012

Page 11: Department Heads Meeting N b 1 2012November 15, 2012...Charlotte Chang & Laurie Escudero » Conference apppp proval process Comments » Interpretations being made at the Site Office

Example: Cryogenic Dark Matter Search

Opportunities» Discovery of a WIMP source for dark mattery» Better understanding of cosmology through measuring detailed

properties of dark matter in statistically meaningful samples» Precision and background discrimination that can be achievedPrecision and background discrimination that can be achieved

in Ge detectors may prove to be superior to other technologies» Work on cryogenic electronics may aid other SLAC efforts such

as EXOas EXO» Work on phonon transport in GEANT4 may be useful to other

SLAC programs (e.g. PULSE, SIMES) Risks Risks

» Ge technology may not prove to be competitive» Timeliness of SuperCDMS-SNOLAB may be lost due to DOE

i tiinaction

11Department Heads: November 15, 2012

Page 12: Department Heads Meeting N b 1 2012November 15, 2012...Charlotte Chang & Laurie Escudero » Conference apppp proval process Comments » Interpretations being made at the Site Office

Administrative news

Review of FY2012 performance evaluations Timeline and input to merit and bonus recommendationsp

12Department Heads: November 15, 2012

Page 13: Department Heads Meeting N b 1 2012November 15, 2012...Charlotte Chang & Laurie Escudero » Conference apppp proval process Comments » Interpretations being made at the Site Office

Performance evaluation timeline

August 15:» Access given to supervisors to begin writing evaluations and g p g g

seek employee and matrixed supervisor / functional lead input September 28:

» Directorates complete their normalization process and» Directorates complete their normalization process and communicate to supervisors

October 31:All f l ti fi li d i l di hi h l l» All performance evaluations are finalized including higher level review

November 12 [on hold until Nov 19 for PPA]:» Evaluations are released to employees; supervisors begin

meeting with employees

13Department Heads: November 15, 2012

Page 14: Department Heads Meeting N b 1 2012November 15, 2012...Charlotte Chang & Laurie Escudero » Conference apppp proval process Comments » Interpretations being made at the Site Office

Grading scale

7 = Consistently exceeds all expectations 6 = Frequently exceeds expectationsq y p 5 = Sometimes exceeds expectations 4 = Consistently meets expectations 3 = Meets most expectations 2 = Needs improvement 1 = Does not meet expectations1 Does not meet expectations 0 = Not applicable

14Department Heads: November 15, 2012

Page 15: Department Heads Meeting N b 1 2012November 15, 2012...Charlotte Chang & Laurie Escudero » Conference apppp proval process Comments » Interpretations being made at the Site Office

Comments

In aggregate, noticeable differences in interpretation of grading scale » Between divisions, between departments, & between individual

supervisors Undertook a review of all performance grades this weekUndertook a review of all performance grades this week

» Meetings at Division Head level» Nearly finished this review and providing feedback

Should be in a position to release performance reviews by next» Should be in a position to release performance reviews by next Monday (Nov 19)

15Department Heads: November 15, 2012

Page 16: Department Heads Meeting N b 1 2012November 15, 2012...Charlotte Chang & Laurie Escudero » Conference apppp proval process Comments » Interpretations being made at the Site Office

Merit and bonus program timeline

November 26:» Directorates finalize salary increase and bonus recommendationsy» Directorate level allocations passed down to Divisions, with 10%

holdback for reserve» Need Division level inputs by COB Tuesday [Nov 20] at the latestNeed Division level inputs by COB Tuesday [Nov 20] at the latest» Bonus recommendations should be accompanied by a one

paragraph justification December 12: December 12:

» EC completes approval process for bonuses and salary increases January 21, 2013:

» Supervisors complete meetings with employees January 22, 2013:

» Salary increases in paycheck; FY bonuses paid out in paycheck» Salary increases in paycheck; FY bonuses paid out in paycheck

16Department Heads: November 15, 2012