social monitoring report - adb.org · this social monitoring report is a document of the borrower....
TRANSCRIPT
![Page 1: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/1.jpg)
Social Monitoring Report
Quarterly Internal Monitoring Report Resettlement and Customary Communities Plan (RCCP) Implementation July – September, 2015
INO: Loan 3015: West Kalimantan Power Grid Strengthening Project
Prepared by PT. PLN (Persero) for the Asian Development Bank.
![Page 2: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/2.jpg)
NOTES (i) The fiscal year (FY) of the Government of Indonesia ends on 31 December. FY before a
calendar year denotes the year in which the fiscal year ends, e.g., FY2015 ends on 31 December 2015.
(ii) In this report, "$" refers to US dollars. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
![Page 3: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/3.jpg)
Project Implementation Strengthening West Kalimantan Power Grid
Social Monitoring
Quarterly Report
July – September 2015
ADB Loan No.: 3015-INO
AFD Loan No.: CID 1024 01 B
Prepared for:
PT. PLN (Persero)
Submitted by:
Joint Venture Tractebel Engineering Ltd. and Powergrid International Ltd. with Sub-Consultant PT. Caturbina Guna Persada
Submitted on October 13, 2015
PT PLN (PERSERO) UIP X
Jl. M.T. Haryono No 384, Balikpapan – 76114
![Page 4: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/4.jpg)
Page 1 of 18
Abbreviations
ADB Asian Development Bank
AFD Agence Française de Développment
AP Affected Person
BPN Badan Pertanahan Nasional (National Land Agency)
COI Corridor Of Impact
EIA Environmental Impact Assessment
FDG Focus Discussion Group
HH Household
HUP Harga Umum Pasar – general market price
IMA Independent Monitoring Agency
IOL Inventory Of Losses
IDR Indonesian Rupiah
IP Indigenous People
IR Involuntary Resettlement
LA Land Acquisition
LAC Land Acquisition Team
LARP Land Acquisition Resettlement Plan
MUSPIKA Musyawarah Pimpinan Kecamatan (Board of Subdistrict
Government Leaders)
NGO Non-governmental Organization
NJOP Nilai Jual Objek Pajak (Tax object selling price)
No., no. Number
PBHTP Biaya Perolehan Hak Atas Tanah dan Bangunan (Cost for
the Acquisition of the right of Land and / or Buildings)
PIC Project Implementation Consultant
PIU Project Implementation Unit
PLN PT Perusahaan Listrik Negara (Persero) (State Owned
Electricity Enterprise)
RCCP Resettlement Customary Communities Plan
RCCDP Resettlement Customary Communities Development Plan
ROW Right-Of-Way
RP Resettlement Plan
SES Socio Economic Survey
T, T. Tower
TL Transmission Line
TOR Terms of Reference
UPK Unit Pelaksana Konstruksi (Construction Implementation
Unit)
UIP Unit Induk Pembangunan (Principal Development Unit)
![Page 5: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/5.jpg)
Page 2 of 18
Weights and Measures
ha hectare
kg kilogramme
km kilometer
kV kilovolt
m meter
m² square meter
![Page 6: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/6.jpg)
Page 3 of 18
Table of Contents
Abbreviations .......................................................................................................................................... 1
1. Introduction .................................................................................................................................... 5
1.1 Introduction of Project and Basic Data .............................................................................. 5
1.2 Project Scope .......................................................................................................................... 5
1.3 Project Location ...................................................................................................................... 6
1.4 Project Administration ............................................................................................................ 7
2. Resettlement, Community Customary and Social Issues ...................................................... 7
3. RCCDP and RCCP Implementation Progress ........................................................................ 9
3.1 Grievance Redress Mechanism ................................................................................................... 10
4. Land Acquisition and Compensation Progress ...................................................................... 12
4.1 275 kV Bengkayang – Jagoibabang Transmission Line and Substation .................. 12
4.2 150 kV Bengkayang – Ngabang –Tayan Transmission Line ...................................... 12
4.3 Implementation of Compensation Process of ROW Corridor ...................................... 13
5. Social Issue and Mitigation ....................................................................................................... 16
6. Indigenous People / Custom Community in Project Location ............................................. 17
Maps Map 1: Project Location on the Map of Indonesia 6 Map 2: The Map of West Kalimantan Power Grid Strengthening Project 6 Tables Table 1: Land Acquisition progress for 150 kV Bengkayang – Ngabang – Tayan Transmission Line 12 Table 2: Monitoring ROW corridor 275 kV Bengkayang – Jagoibabang
Transmission Line 14
![Page 7: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/7.jpg)
Page 4 of 18
Annexes Annex 1: Project Organisation Charts Annex 2: Tower Changes of 150 kV Bengkayang – Ngabang – Tayan Transmission Line Annex 3: Minutes of Meeting on Socialization at Gua Village Hall Annex 4: Proposal for Leaflet to be distributed to Persons living in ROW of Transmission Line Annex 5: Compensation payments by Contractor for damaged crops/trees Annex 6: Action Plan to solve Land Acquisition and ROW issues for 275 kV Transmission Line Annex 7: Action Plan to solve Land Acquisition issues for 150 kV Bengkayang – Ngabang – Tayan Transmission Line Annex 8: Photos
![Page 8: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/8.jpg)
Page 5 of 18
1. Introduction
In accordance with the requirements stated in the Project Administration Manual for
the Indonesia West Kalimantan Power Grid Strengthening Project of July 2013 under
VI. Procurement and Consulting Services, Item D. Consultant's Terms of Reference
sub item 1. Scope of Services for Project Implementation Consultants (Firm)
paragraph 62. Reporting (i), the consultant shall prepare quarterly progress reports,
(f) on social issues.
PT PLN (Persero) has assigned the Joint Venture of Tractebel Engineering Ltd. and
Power Grid International Limited (Thailand), Contract No. 0107.PJ/041/DIR/2013 of
30th July, 2013, to carry out the monitoring of resettlement and community
development with regard to compliance to the RCCP and RCCDP.
The present report shows the progress of land acquisition, social and vulnerability
issues during the period from July 1, 2015, to September 30, 2015. Actions or
information received after the cut-off date of 30 September 2015 are not addressed
in this report.
1.1 Introduction of Project and Basic Data
The Government of the Republic of Indonesia has signed loan agreements with the
Asian Development Bank (ADB) and the Agence Française de Développment (AFD)
in the amount of US$ 49.5 million each to enable PT. Perusahaan Listrik Negara
(PLN) to realize the construction of 82 km 275 kV transmission line from the border
with Sarawak in East Malaysia to Bengkayang in West Kalimantan, Indonesia,
275/150 kV substation at Bengkayang, 145 km 150 kV transmission line from
Bengkayang to Ngabang and Tayan, 150/20 kV substation at Ngabang and
extension of 150/20 kV Tayan substation. After the commissioning of the 275 kV
Interconnector and Bengkayang substation, PLN will be able to import electricity
produced by hydro power plants in neighbouring Sarawak at a much lower cost than
generated by PLN’s own diesel and oil fired power plants in West Kalimantan. The signed power exchange agreement will allow power trade between West Kalimantan
and Sarawak for 20 years. Construction works for the 125 km 275 kV Interconnector
are progressing on both sides of the border.
1.2 Project Scope
The project comprises of design, supply, installation, testing, and commissioning of
the following works:
Package 1: 275 kV Transmission Line between Bengkayang substation and the
border with Sarawak, East Malaysia (80.26 km)
Package 2: 275/150 kV Substation at Bengkayang
![Page 9: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/9.jpg)
Page 6 of 18
Package 3: 150 kV Transmission Line from Bengkayang substation to the new 150/20 kV Ngabang substation (93.3 km), and from there to the existing Tayan substation (46.6 km)
Package 4: 150/20 kV Substation at Ngabang and Tayan Substation extension
1.3 Project Location
The project is located on the Indonesian part of Borneo Island in West Kalimantan in
the three districts Bengkayang, Landak and Sanggau.
.
The location of the project is presented on Map 1 and the West Kalimantan Power
Grid Strengthening Project is presented on Map 2.
Map 1. Project location on the Map of Indonesia
Map 2.The map of West Kalimantan Power Grid Strengthening Project
![Page 10: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/10.jpg)
Page 7 of 18
1.4 Project Administration
The implementation of the project is managed by PT. PLN (Persero) Unit Induk
Pembangunan X (UIP X) located in the offices of PLN in Balikpapan with Unit
Pelaksana Konstruksi Jaringan Kalimantan 5 (UPK KAL 5) at PLN’s site office in Bengkayang. The organisation charts of PLN UIP X and UPK KAL 5 are shown in
Annex 1. PLN is supported by the Project Implementation Consultant whose
organisation chart is shown in Annex 1 too.
The monitoring of the Land Acquisition progress, social and vulnerability issues is
carried out by the PIC’s Social and Reselttlement Specialist and in cooperation with
PLN and the contractors to ensure that accurate data are provided and social issues
are properly resolved under consideration of local customary.
2. Resettlement, Community Customary and Social Issues
This quarterly report for the period July 1, to September 30, 2015 states the social
aspects of the implementation progress of the West Kalimantan Power Grid
Strengthening Project. This report includes: a) an update of land acquisition
implementation by PLN UPK5 of the approved RCCDP 275 kV Transmission Line
Project and RCCP 150 kV Transmission Line Project; b) a compilation of Social
Issues emerged / resulted from the land acquisition and resettlement implementation
by PLN UPK 5 as well as the ones emerged following civil work implementation and
how those have been handled / mitigated; c) progress of Capacity Building services
provided by Social Specialist of Project Implementation Consultant (PIC) to PLN and
main contractors; and d) action plan to further improve project implementation and
monitoring to meet the project policy and compliance with RCCDP and RCCP.
PT. PLN (Persero) as the Project Executing Agency is responsible for the
implementation of the land acquisition and resettlement plan, i.e. Resettlement
Customary Communities Development Plan (RCCDP) for the 275 kV Bengkayang –
Jagoibabang Transmission Line and Resettlement Customary Communities Plan
(RCCP) for the 150 kV Bengkayang – Ngabang – Tayan Transmission Line including
substations. For the acquisition of the land required for the bases of the transmission
line towers, PLN has established an internal land acquisition team under UPK 5 (Unit
Pelaksana Konstruksi/Construction Implementation Unit) in Bengkayang to acquire
land less than one hectare for each tower site through direct negotiation with
landowners. This internal land acquisition team has been tasked also to conduct
inventory of losses for the right of way (ROW) of the transmission line corridor i.e.
identifying trees and assets affected by the construction works and compensate
landowners for loss of land, trees, plants and assets. For land acquisition of more
than one hectare, in particularly for substations, land acquisition committee (LAC)
was formed in each district where the selected substations are located. Those LACs
![Page 11: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/11.jpg)
Page 8 of 18
of Bengkayang and Landak have closely collaborated with PLN UPK 5 to conduct
land acquisition for the substations. Overall land acquisition and resettlement
implementation have been managed by PLN UPK 5 and District LACs in accordance
with the updated RCCDP and RCCP approved by ADB.
Most of the potential impact by tower foundations and transmission line concern
temporary and permanent land acquisition. Moreover, compensation will be provided
for the use of access road to the construction sites. The construction of the
transmission line also has positive impacts to the landowners and communities
located near the project area such as:
1) Affected households receive cash compensation payments which can be
used for reinvestment and needs of family life
2) Creation of employment opportunities for the local people during land clearing
and civil works as well as in the period of construction depending on
individual’s capabilities
3) Opportunity for local entrepreneurs to supply building materials and other
services during the construction and post construction e.g. maintenance.
Implementation of the Resettlement Customary Communities Development Plan
(RCCDP) for the 275 kV Bengkayang – Jagoibabang Transmission Line and
Resettlement Customary Communities Plan (RCCP) for the 150 kV Bengkayang –
Ngabang - Tayan Transmission Line including the substations requires monitoring.
PLN UIP X has awarded a contract for monitoring of the implementation of RCCDP
and RCCP to the independent monitoring agency (IMA) PT. Dehas Inframedia
Karsa. The IMA shall provide external monitoring reports to PLN UIP X and Head
Office / PT PLN (Persero) for any follow up actions required to minimize negative
impacts of the RCCDP and RCCP implementation.
PIC’s Social Specialist assists the project to meet ADB’s IR policy requirements in
delivering land acquisition and resettlement of the West Kalimantan Power Grid
Strengthening Project. The consultant worked together with PLN UPK 5 as well as
main contractors of the four project packages to strengthen the project
implementation processes and solve social problems / issues. Several activities
were conducted in the period of July to September 2015. Those activities include
capacity building and awareness to the four main contractors on the project
compensation policy, social problems identification, mitigation strategy, as well as a
general orientation on local wisdoms and customary institutions relevant to project
implementation. During the period July to September 2015 the contractor for
Package 1 provided social liaison on site thereby solving the social issues raised
during the construction. Social issues raised during preconstruction usually concern
land acquisition and if not solved at that time will lead back to PLN UPK 5 office
Bengkayang at a later stage.
![Page 12: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/12.jpg)
Page 9 of 18
With strong leadership of the PLN UPK 5 internal land acquisition team by
intensively coordinating with MUSPIKA and the village leaders, social issues can be
solved. This coordination process takes a lot of time until an agreement is reached
with landowners on disputed ownership of land. Systematic capacity building
approach to improve the performance of contractors during civil works activities is
still needed to avoid the emergence of similar issues and become a barrier when
PLN UPK 5 is acquiring the remaining land for tower sites / footprints stated in the
RCCDP and RCCP as well as when conducting inventory and compensation for the
ROW corridor.
3. RCCDP and RCCP Implementation Progress
The Resettlement Customary Communities Development Plan (RCCDP) for the 275
kV Transmission Line Project Strengthening West Kalimantan Power Grid was
updated in August 2013. The updated RCCDP covered 81.5 km 275 kV
Transmission Line from 275/150 kV Bengkayang Substation to Jagoibabang. This
updated RCCDP for the 275 kV transmission line also includes due diligence for the
land purchased by PLN prior to the ADB approval of the RCCDP. The total number
of transmission line towers of the 275 kV Bengkayang - Jagoibabang transmission
line is 201.
Following the RCCDP and RCCP approval, PLN UPK 5 internal land acquisition
team continued acquisition of the remaining land for tower sites / footprints. It is
reported that the land acquisition for the remaining tower sites / footprints is
consistent with the updated RCCDP for the 275 kV Transmission Line Bengkayang –
Jagoibabang. Land acquisition for the 275 kV transmission line was completed on 30
September 2015.
In March 2014 PLN updated the Resettlement and Customary Communities Plan
(RCCP) for the 150 kV Transmission Line Project Strengthening West Kalimantan
Power Grid. This updated RCCP covers the 150 kV Bengkayang – Ngabang –
Tayan Transmission Line, 150/20 kV Ngabang and Tayan Substations. Total number
of towers of the 150 kV Bengkayang – Ngabang – Tayan transmission line was 393
at that time.
As indicated in the RCCP of 150 kV Bengakayang – Ngabang – Tayan transmission
line, the Tayan substation part is an extension of the existing one and did not need
new land to be purchased as it already belonged to PLN. During the civil work
activities for the 150 kV transmission line from Bengkayang to Tayan via Ngabang,
rerouting and inserting of towers have been proposed by the contractor KEC. PIC’s
team has reassessed the rerouting which resulted in the increase of towers from 393
to 405. PIC will conduct an ad-hoc land acquisition assessment of the twelve new
![Page 13: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/13.jpg)
Page 10 of 18
tower locations to comply with ADB IR policy requirements when the final decision
on the rerouting and inserting towers has been taken.
Details of the tower changes are stated in Annex 2.
On 31 July 2015, UPK 5, MUSPIKA and head of Magmagan Karya Village
conducted socialization to eight Affected People (Tower 02A to 07A) by explaining
the purpose of the project, process of inventory, and process of compensation. At
this socialization, the head of Lumar Subdistrict and MUSPIKA asked the eight
affected people to support the project and whenever there is a problem it should be
solved by proper procedure. The meeting also was attended by a woman who
presented herself at tower No. 02A. It confirms the equal treatment of women and
men regarding invitation and participation in the land acquisition process as
recommended in RCCP and RCCDP with regard to gender issue. PLN UPK 5
described the ground clearance under the conductors as free space and that tower
construction meets the standard of safety. With regard to compensation for plants,
PLN UPK 5 referred to Letter of Bupati Bengkayang Decree No. 286/SETDA/Tahun
2013 which determines the basic price for plants in Bengkayang District in 2013.
PLN UPK 5 will compensate the plants based on type and size.
PLN UPK 5 also informed the participants that the compensation price for land
should be referred to letter of Bupati Bengkayang No. 366/2012 and NJOP / Tax
Object Selling Price. BPN (National land agency) will issue a new land certificate
after the land has been released. After the discussion the affected people agreed to
the compensation offered by PLN. PLN UPK 5 asked the affected people to be
patient as the compensation process will take time until the agreed compensation is
transferred to the bank account of the affected people.
In this meeting MUSPIKA requested PLN UPK 5 to repair roads which have been
damaged during construction activities. Minutes of the meeting of the performed
socialization is summarised in Annex 3.
3.1 Grievance Redress Mechanism
In order to ensure the affected peoples have avenues to raise their grievances
related to any aspect of the land acquisition and come up with acceptable resolution,
a complaints and grievance handling mechanism has been established.
The land acquisition was undertaken by PLN UPK 5 West Kalimantan team in
collaboration with the local governments. The procedures of land acquisition are as
follows:
1) Consultations with APs and relevant stakeholders to inform on the purposes
of the project development, potential impacts and land acquisition activities
2) Identify corridor of ROW and inventory of property and vegetation.
![Page 14: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/14.jpg)
Page 11 of 18
3) Land valuation based on local market price. The valuation result was used as
a basis for negotiation with the APs
4) Deliberation / consultation with APs on the compensation rate and payment
5) Transfer of compensation amount to landowner
6) Release of land title from the APs to PLN
With regard to disputed land parcels, PLN UPK 5 also has conducted a series of
meetings with MUSPIKA and local district government. Documents required to solve
such disputes are:
1) A Minutes of Meeting involving owner(s) of disputed land, MUSPIKA and head
of Adat.
2) Signed Statement Letter of Dispute from Owner of disputed land
3) Document No. 1) and 2) will be sent to PLN UPK 5 if agreements have been
reached between the owners of disputed land, and compensation payment
can be processed
4) If there is no agreement, the case of the disputed parcels can be brought to
Bupati (head of district government) and the Governor of West Kalimantan.
5) If the case of disputed parcels cannot be resolved, PLN may take the case to
court of law for adjudication. PLN tries hard to avoid the involvement of the
court as it prolongs the procedureand therefore prefers to take intensive
rapproachement to AP’s to resolve the issue.
These phases also apply for other grievance mechanism.
To carry out the complaints from community / affected peoples, PIC advice PLN to
provide a leaflet that contains the description of the project and grievance
mechanism. This leaflet should be used especially for the areas which have not been
released yet such as corridor of ROW of the 150 kV transmission line. The leaflet
should be given to communities in restricted area of ROW, tower and socialized to
contractor as well. A sample of the proposed leaflet is attached in Annex 4.
On 31 August 2015 PIC Social Specialist conducted an interview with Head of Gua
Village and 4 APs affected by the construction of towers for the 275 kV transmission
line regarding the social condition after the compensation has been paid. According
to the Head of Gua Village the social condition of all AP’s at Gua Village has
improved. Losing some part of land did not negatively affect their income because
income from the land it is not their main source. Generally the compensation
received by APs is used to renovate the house and some of them used it for capital
of business. One of the people identified as severely AP at Tower No. 99 – 100 had
passed away, thus the compensation payment was received by his son who built a
house. The son has rubber and palm oil plantations.
One AP interviewed is a woman (Mrs. Saliyem) as head of the household and
landowner at tower 96 due to the death of her husband. During the land acquisition
process the woman did not attend the socialization process at Gua Village Hall until
![Page 15: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/15.jpg)
Page 12 of 18
the inventory process was conducted as her husband was still alive at that time and
attended the socialization process. The woman used the compensation to build a
new house for her son and she now lives in that house too. Income resources of her
family come from rubber plants and corn. She is very satisfied with the land
compensation as she could implement her aim to build a house for her son. Mrs
Saliyem can be considered in the income restoration program as she is woman
heading the household.
4. Land Acquisition and Compensation Progress
4.1 275 kV Bengkayang – Jagoibabang Transmission Line and Substation
During the period of this quarterly report, the land acquisition team still focused on
areas of disputes and intensive approach to landowners demanding high
compensation.
The land required for the construction of the 201 towers of the Bengkayang –Jagoibabang transmission line has been acquired by PLN.
4.2 150 kV Bengkayang – Ngabang –Tayan Transmission Line
The 150 kV Bengkayang – Ngabang – Tayan Transmission Line comprise 279
towers for the Bengkayang – Ngabang section and 126 tower sites for the Ngabang
– Tayan section as updated by administrative consolidation, i.e. 405 towers in total.
Progress of land acquisition for the 150 kV Bengkayang – Ngabang – Tayan
transmission line has reached 86% (347 tower locations) completed and remaining
14% (55 tower locations on private land and 2 tower locations on forestry land) has
not been completed yet.
The status of Land Acquisition for the 150 kV Bengkayang – Ngabang - Tayan
transmission line at the end of September 2015 was as follows:
Table 1: Land Acquisition progress for 150 kV Bengkayang – Ngabang - Tayan
Transmission Line
No. ROUTE AND LOCATION TOTAL COMPENSATION
STATUS
I 150 KV BENGKAYANG – NGABANG TRANSMISSION LINE
AND NGABANG SUBSTATION
1 Ngabang Substation (New
Location)
1 Completed
![Page 16: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/16.jpg)
Page 13 of 18
2 Towers on Private Land No. 1A-
4, 12-14, 33, 35-45, 47-81, 91,
104, 107-126, 128-143, 152-
167, 170, 172-221, 224-235;
118-127
182 Completed
3 Other towers on private land 39 Not yet Completed
4 Towers on Forestry land: 5 to
11, 15 to 24, 24A, 25 to 26, 28 to
32, 82 to 88; 90, 92, 94 to 103
and 144 to 151
56 Completed
5 Towers on Forestry land: , 89,
93, *)
2 Not yet Completed
Total number of towers for 150
kV Bengkayang – Ngabang
Transmission Line
279
II 150 KV TAYAN – NGABANG TRANSMISSON LINE AND
TAYAN SUBSTATION
1 Tayan substation extension 1 Completed
2 Towers on private land: 2,3,5
to34, 55,56, 69 to 94, 96, 97,
99110
86 Completed
3 Other towers on private land 17 Not yet Completed
4 Towers on Forestry land: 35 to
43; 53, 54, 57 to 68
23 Completed
Total number of towers for 150
kV Tayan – Ngabang
Transmission Line
126
150 kV BENGKAYANG – NGABANG - TAYAN TRANSMISSION LINE
Total on Forestry land 81
Total on Private land 324
Total number of Towers 405
Total of released Tower’s Land 347
Total of not yet released land 57
4.3 Implementation of Compensation Process of ROW Corridor
Up to 30 September 2015 the construction of the 275 kV Bengkayang –
Jagoibabang transmission line affected 13 Villages in 5 Subdistricts. Compensation
within the ROW corridor is implemented for affected trees and properties. Most
affected areas consist of trees such as hard wood, productive trees and fruits. Along
the area of the 13 villages, the progress of ROW compensation for the transmission
line corridor has reached 87% (174 towers) and has been released for clearance
![Page 17: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/17.jpg)
Page 14 of 18
activities. For the remaining area ROW compensation is still pending as the
negotiation on price are still ongoing and ownership of disputed parcels must be
clarified.
Table 2 below describes details of monitoring the ROW of the 275 kV Bengkayang –
Jagoibabang transmission line.
Table 2: Monitoring ROW corridor 275 kV Bengkayang – Jagoibabang Transmission
Line
Source: PIC
Whenever ROW have been released, the area should be immediately cleared by the
contractor to avoid any other social issue that could arise. During construction the
contractor has the responsibility for clearing the ROW area and compensation for
damages caused by construction and stringing activities. Most impacts during
stringing activities result in damages to trees as temporary loss. The Contractor
coordinates with PLN UPK 5 for the price of trees referred to in Bupati Bengkayang
decree No. 286/SETDA/2013 about determination of basic price compensation for
plants in Bengkayang District in 2013. The compensation for damaged trees/plants
at tower No. 93 to 100; 109 to 110 and 114 to 115 as paid by the contractor is listed
in Annex 5. The compensation payment was received by the landowners through
bank transfer. In total the amount of IDR 224.47 million had been paid by the
contractor until 30 September 2015
Calculation of the compensation for trees/crops in corridor of ROW still cannot
performed in this report as PLN considers the compensation documents as property
of PLN.
Required Released Pending
1 Magmagan Raya Lumar 1A-10 8 5 3 Tower 7-9 pending
2 Tiga Berkat Lumar 11-22 11 6 5 Tower 15-20 pending
3 Belimbing Lumar 23-35 13 13
4 Lamoida Lumar 36-50 15 10 4 Tower 46-50 pending
5 Lesabela Ledo 51-60 10 10
6 Jesape Ledo 61-79 20 20
7 Bange Ledo 80-93 14 14
8 Gua Sanggau 94-100 8 8
9 Sango Sanggau 101-116 17 17
10 Sahan Seluas 117-127 11 9 2 Tower 120-121 pending
11 Mayak Seluas 128-148 21 15 6
Tower 128-129; 135-136;
147-148 pending
12 Seluas Seluas 149-169 22 13 9
Tower 148-150; 151-152;
164-168 pending
13 Jagoi Jagoibabang 170-199 30 28 2 Tower 179-180 pending
TOTAL 200 168 31
Monitoring ROW corridor 275 kV Bengkayang - Jagoibabang transmission line
No Village Sub district Tower NoTotal span
Description
![Page 18: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/18.jpg)
Page 15 of 18
Complaints by the landowners sometimes come up as the landowner feels that one
or several of his trees have not been compensated yet. Such issue causes an
obstacle as the landowner insists on clarification by PLN. In order to avoid such
disputes during construction, PLN Land Acquisition team continuously goes for
rapproachement to landowners.
Most pending land acquisition process result from non-acceptance of the offered
price by landowners. Landowners demand prices much higher than the price offered
by PLN for plants and land. Other issues concern the overlapping of border between
subdistricts that should be resolved by government district of Bengkayang. Some
case have delayed for more than three months with little intend by the government to
resolve them. PLN UPK 5 has already coordinated with Bengkayang subdistrict but
unfortunately the matter for tower 49 and 50 of the 275 kV transmission line has not
been resolved during this reporting period. At coordination with the Head of
Subdistrict Lumar stated at the coordination meeting that the overlapping of the
border between Lumar subdistrict and Ledo subdistrict should not affect the land
acquisition as the ownership is based on the Land Title Deed (SPT = Surat
Pemilikan Tanah) which should be approved by both subdistricts.
Intensive approach and discussions have been conducted by LAC of PLN UPK 5
with MUSPIKA and other stakeholders to resolve land acquisition issues. Sometimes
the contractor also makes rapproachement with landowner to get the permission to
commence construction activities while payment of compensation is still on process.
PLN supports this activity by the contractor.
The inventory of trees/plants within the ROW corridor of the 150 kV Bengkayang –
Ngabang – Tayan route that affected five villages, i.e. Bange, Sango, Guwa, Sahan
and Mayak has not commenced yet. As a matter fact PLN UPK 5 still waits for the
instruction by PLN UIP X to conduct Land Acquisition for ROW corridor of the 150 kV
transmission line. According to the implementation schedule of RCCP compensation
payment for ROW was scheduled to be completed in March 2015.
Process of compensation for plants within the corridor of ROW, i.e.
1. Inventory of affected trees / crops
2. Administration process of inventory result and signed by owners
3. Deliberation related to all ROW problems presented to all stakeholders
4. Socialization of payment system
5. Payment of the compensation amount by Bank Transfer
6. Clearing the released ROW
Problems in land acquisition and ROW and process of solving them are listed in
Annex 6 for the 275 kV Bengkayang – Jagoibabang transmission line and in Annex 7
for the 150 kV Bengkayang – Ngabang – Tayan transmission line.
![Page 19: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/19.jpg)
Page 16 of 18
5. Social Issue and Mitigation
With regard to PIC services, Social Specialist conducted a series of ad-hoc
consultations in the field. The first consultation meeting was about the project
information disclosure. It was targeting the participation of general impacted
community, affected households as well as involving formal and informal leaders to
inform about the benefits and disadvantages of the project. The second consultation
was more advanced and addressed the needs of affected people / landowners,
witnessed by officials of the government, police and military officials. The
socialization described the inventory of losses and how it was administered. Details
of compensation policy for land, plants/crops and other assets affected were also
described. The community was also informed about the PLN UPK 5 internal land
acquisition team and the procedure for grievance related to the inventory of losses
and the compensation to be paid.
Most of the social issues concern to land acquisition problem as the landowners
claim a higher price than the price offered for compensation. Problem was raised in
ROW corridor between tower 120 and 121 of the 275 kV transmission line. A series
of meetings as social mitigation already have been conducted by PLN UPK 5,
MUSPIKA, traditional organization (Adat), leaders and involved owners but
unfortunately the case has not been resolved yet. UPK 5 has consulted with local
court to solve this issue.
Complaint from the contractor sometimes aroused when contractor got information
from this workers that they cannot work because compensation for trees has not
been paid yet. The Contractor complained to PLN UPK 5 that he cannot work in the
area of tower 120 and 133 as trees have not been compensated yet. On 14
September 2015 PIC and PLN UPK 5 clarified this issue to landowner and it was
found that the issue is a misperception and the landowner never hampered the
construction work. The Contractor for the 150 kV transmission line should provide a
public relations officer so that issues can be clarified at site before complaint is
submitted to PLN UPK 5.
The majority of the land acquisition issues relate to disputed parcels due to
overlapping border that impact to compensation for plants, and that landowners do
not agree with the price offered by PLN. Impact of rerouting of towers also cause
problems for land acquisition as LAC has done rapproachement with landowners for
the original location and has to conduct new process of land acquisition for the new
location.
Land acquisition issues cause obstacle to the construction as the landowners do not
allow the contractor to work in the area before the problem is resolved. PLN UPK 5
continued conducting meetings with landowners, MUSPIKA and head of adat to
resolve the land acquisition issues to get agreement from the landowners. The
![Page 20: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/20.jpg)
Page 17 of 18
process of problem resolving in some cases takes even a few months. Some
landowners allow the contractor to work on their area even though compensation is
not completed yet as UPK 5 had good approach to landowner.
6. Indigenous People / Custom Community in Project Location
Often a social problem is related to local tradition and culture which are hardly
understood by other people (outsiders) who are engaged with the technical work.
This type of issue sometimes is also being considered as irrational by the contractors
as it bothers their work. However, culture should be interpreted as a set of idea-
behaviour and behavioural outcome, which holistically has been institutionalized and
is believed by the people that support cultural values. Sacred things that relate to
religious life are obeyed by society more than the profane things in their daily life.
Tower construction is considered as interfering in nature and the balance of religious
life, thus it should be accompanied by activities such as ritual or traditional
ceremony. However not all community groups supporting the culture and tradition
are requesting ceremonies. Normally if there are traditional ceremony requests that
potentially will burden the project implementation progress, coordination with local
government, MUSPIKA, and Dewan Adat Dayak (DAD) as a precaution to avoid
exploitation of traditional rituals by non-qualified groups will be done. PLN has
convinced DAD about the importance and benefit of construction of the electricity
network at West Kalimantan in the subdistrict of Seluas area at West Kalimantan.
Implementation of Adat activity before Tower erection. The time for the Adat
activity is decided by Adat head and all cost are financed by the contractor.
Unfortunately, this appeal letter is not intensively socialized by the DAD team at the
contractor’s workplace as a tool to avoid disturbance through social problem. The
construction works are often disrupted because cultural activities have to be
performed in almost every banuaq (culture territories).
In the first week of September 2015 KEC started work at Tower No. 1 of the 150 kV
Bengkayang – Ngabang transmission line section. In accordance with the local
customary an adat ceremony was held before the start of the work. The Adat
ceremony was held near the location of Tower No. 1 and led by the Adat Leader (Mr.
Jono) of the Dayak Bekati community.
![Page 21: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/21.jpg)
Page 18 of 18
Action Plans and Strategies developed to improve the Project Social Safeguard
Compliances.
Key areas should be addressed to improve project implementation performance
including:
Management of Information: Content, technique, and appropriate media to be
used under consideration of local conditions / custom (illustration, language, etc.).
This spreading information to be done before clearing of ROW and stringing
process. It will be targeted to main contractors and their sub-contractors.
Land preparation / clearing vs. tradition, cultural string of home living:
Managing problems that relate to preparing land, cutting trees for interest of the
project. The understanding of social aspect of culture especially cultural problem
in Dayak people’s live will be the key-opener to the implementation of social
communication with the community, through Focus Group Discussions (FGD). It
will be targeted to main contractors and their sub-contractors.
Social compensation: The preparation of some social compensation programs
to muffle the possibility of distractions and social conflict either emerged from
their own society or outside society that will disturb the project. This social
compensation passing through some steps discussion and FGD that prioritize
NEED rather than WANT. People should understand those aspects. PIC will take
a lead to facilitate this.
Coordination: Implementation of coordination with some parties who control
such land that might be disturbed by project activity through:
i. Religious leaders, public figures, women, youth, etc., in locations controlled
by people and/or prone locations, cultural reason, etc.
ii. Traditional leaders, traditional institutions, etc., especially in a number of
locations that are considered sacred with trust system, and the locations
also have some cultural heritages.
iii. Government institutions that control the land such as Ministry of Forestry,
school, local government, etc.
iv. Government institution and other institutions that dominate important and
vital objects in the project sites such as Armed Forces Institute (ABRI).
All concerned project stakeholders will have to increase their participation.
Social empowerment and community development for impacted community and
executive power: This activity is not a recommendation for the direct impact of the
project activities, but it can be a form of social compensation that will be given (if
any). A number of activities such as counselling, saving electrical energy, training for
managers of facilities, sanitary facilities, counselling for Cleanliness and Health
(PHBs), Clean Water and Sanitation Community-based (SANIMAS) for society,
women's groups, etc.
![Page 22: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/22.jpg)
ANNEXES
![Page 23: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/23.jpg)
Table of Annexes
Annex 1.1 Project Organization Chart of PLN UIP X (Balikpapan)
Annex 1.2 Project Organisation Chart of PLN UPK KAL 5 (Bengkayang)
Annex 1.3 Project Organisation Chart of PIC
Annex 2 Tower Changes Of 150 Kv Bengkayang – Ngabang – Tayan
Transmission Line
Annex 3 Minutes of Meeting on Socialisation at Gua Village Hall
Annex 4 Proposal for Leaflet to be Distributed to Persons Living in ROW
Transmission Line
Annex 5 Compensation Payments by Contractor for Damaged Crops/ Trees
Annex 6 Action Plan to Solve Land Acquisition and ROW Issues 275 kV
Bengkayang – Jagoibabang Transmission Line
Annex 7 Action Plan to Solve Land Acquisition Issues for 150 kV Bengkayang
- Ngabang – Tayan Transmission Line
Annex 8 Photos
![Page 24: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/24.jpg)
ANNEX 1.1
PROJECT ORGANISATION CHART OF PLN UIP X
![Page 25: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/25.jpg)
ORGANIZATION CHART OF PT. PLN (PERSERO) UIP X
General
Manager
Finance & HRD Manager Law, Communication &
Agrarian Manager
Operation Construction
Manager Planning Manager
Unit of Implementation
Construction KAL 5
Zulkarnain
Herman Masola M. Dahlan Djamaluddin
Henry D. Salamba
Ahmad Bustami Dwi Wibihandoko
![Page 26: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/26.jpg)
ANNEX 1.2
PROJECT ORGANISATION CHART OF PLN UPK KAL 5
![Page 27: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/27.jpg)
ORGANIZATION CHART OF PT. PLN (Persero) UPK KAL 5
MANAGER
HENRY D. SALAMBA
TECHNIQUE
ASSISTANT MANAGER
Rajuni Rahim
ADMINISTRATION & FINANCE
SUPERVISOR
Dessy Wijayanti
Civil Assistant Engineer
1. Yulius Wiji H.S
2. Kumara Bagus R. W
3. Ivan Darma Sihite
4. Afditia Azhari
5. Lamhot Edison H. S
Civil Junior Engineer
1. Erlan Febryandani
2. Handri
Electrical Junior Engineer
1. Sigit Dwi Anggoro
2. Ferrizal Nurli S
3. Denny Fajri Z. P
4. Sariyandi
ROW TEAM OF UPK RING KAL 5
1. UPK Manager ( Head)
2. Technique Assistant Manager (Secretary)
3. All of Employee of UPK 5
Logistics
1. Sariyandi
![Page 28: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/28.jpg)
ANNEX 1.3
PROJECT ORGANISATION CHART OF PIC
![Page 29: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/29.jpg)
![Page 30: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/30.jpg)
ANNEX 2
TOWER CHANGES OF 150 kV BENGKAYANG – NGABANG
– TAYAN TRANSMISSION LINE
![Page 31: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/31.jpg)
Annex 2 Summary of revised tower arrangement of 150 kV Bengkayang-Ngabang-Tayan Transmission lines
No Changes Note Towers balance
Total Towers
A Calculation of tower numbers of New arrangement Bengkayang-Ngabang Transmission lines
1 Based on original tower schedule the amount of towers: T.01 up to T.259 259
2 Due to relocation of Bengkayang Substation:
a) T.01 up to T.03 will not be used -3
b) T.1A up to T.7A will be added to connect the T.04 to Bengkayang Substation 7
3 Tower 24A has been inserted 1
4 Towers T.126 or T127, T.157 and T.159 will not be used due to span condition and they will be deleted -3
5 Due to relocation of Old Ngabang Substation:
a) Towers will be relocated started from T.252 up to T.259 0
b) Addition towers of T.260 up to T.262 to connect original Tayan - Ngabang Transmission lines 3
c) Shifting of T.128-T116 of original Tayan - Ngabang Transmission lines to become Bengkayang -Ngabang Transmission lines (New number will be T.263 -T.275)
13
d) Addition towers of new T.116A and T116B to connect with Ngabang substation 2
6 Numbers of Towers balance along Bengkayang-Ngabang Transmission lines 19
7 Numbers of towers in New arrangement Bengkayang-Ngabang (with considering the shifting the Tayan-Ngabang route)
279
B Calculation of tower numbers of New arrangement Tayan-Ngabang Transmission lines
1 Based on original tower schedule the amount of towers: T.01 up to T.133 133
2 Due to relocation of Ngabang Substation:
a) Reduced of towers (T.129-T133) due to number of last tower used is T.128 to connect with T.262 of Bengkayang-Ngabang transmission lines
-5
b) Shifting of T.128-T116 of original Tayan - Ngabang Transmission lines to become Bengkayang - Ngabang Transmission lines (New number will be T.263 -T.275)
-13
3 The next tower after T.114 from Tayan to Ngabang Substation was under arrangement due some concerns from the land owner(s). In case it can be solved smoothly, it follows the original route to connect with T.115 (either shifted or still on the original place) and add one dead-end tower (One addition towers)
1
4 There will be an insert of T.04A 1
5 Tayan substation was not located in adjacent with tower No. 1, in fact is located about 1.5 km further southward. If it can be arranged straight route then it requires about 8 towers
8
6 Number of Towers balance -11
Numbers of towers in New arrangement Tayan-Ngabang after considering the shifting of some towers into Bengkayang-Ngabang
126
C Total towers of 150kV Bengkayang-Ngabang and Tayan - Ngabang 405
![Page 32: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/32.jpg)
ANNEX 3
MINUTES OF MEETING ON SOCIALIZATION
AT GUA VILLAGE HALL
![Page 33: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/33.jpg)
SUMMARY OF MINUTES OF MEETING
SOCIALIZATION AND COMPENSATION PROCESS
AT MAGMAGAN VILLAGE HALL, 31 JULY 2015
Attended by:
- MUSPIKA (Deliberation leadership district)
- HEAD OF VILLAGE MAGMAGAN KARYA
- HEAD OF POLICE
- HEAD OF SUBDISTRICT LUMAR
- HEAD OF LAND BUREAU BENGKAYANG DISTRICT
- HEAD OF BENGKAYANG MILITARY COMMAND
Opening ceremony by HEAD OF SUBDISTRICT LUMAR, Mr. Sukirno who
mentioned the purpose of the meeting to make one perception and coordination
with Distric government for any issues concerned to the project
KAPOLSEK (Police Resort) asked the community and affected households to
support the project and if there is a problem should be taken care in the right
way to get the solution and make condition secure.
PLN UPK 5 (Mr. Wiji) described the project in detail with regard to safety zone
for tower and conductor installation process. PLN UPK 5 also mentioned about
compensation process and compensation price based on letter decree of Bupati
Bengkayang No 286/2013 for plants and compensation price for land based on
market price and NJOP
Mrs. Rio Rita Ginting (on behalf Mr. Amin Ginting) asked compensation for chilli
plants
UPK 5 (Mr. Wiji) responded that chilli plants will be compensated if they are
damaged by conductor stringing.
Mr. Suparman (AH): radiation Impact of Transmission Line to health
UPK 5 (Mr. Wiji): safety requirement has already coincided with the requirements
for secure distance, free space. There is also letter statement from PLN
Balikpapan that the towers building has already meet the standard requirements
for design engineering thus guarabteeing safety for community living adjacent to
towers
Mr. Pinem (AH): asked compensation for chilli plants
UPK 5 (Mr. Wiji): PLN will give compensation for chilli plants by adjustment with
same kind of plants
Abdul Azis (AH): asked price for land is Rp. 75,000/m² and the price for rubber
tree is Rp. 700,000/each as refer to compensation at another village like
Belimbing Village
UPK 5 Mr. Wiji: all compensation paid must refer to Decree letter of Bupati
Bengkayang. Land price offered by PLN is already above the NJOP value.
![Page 34: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/34.jpg)
After compensation process has been completed and the landowner received
the compensation, the National Land Agency will issue new land certificate.
![Page 35: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/35.jpg)
ANNEX 4
PROPOSAL FOR LEAFLET TO BE DISTRIBUTED
TO PERSONS LIVING IN ROW TRANSMISSION LINE
![Page 36: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/36.jpg)
![Page 37: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/37.jpg)
![Page 38: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/38.jpg)
ANNEX 5
COMPENSATION PAYMENTS BY CONTRACTOR
FOR DAMAGED CROPS/ TREES
![Page 39: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/39.jpg)
NO Owner's Name Village Affected trees/plants Cost
1 Haris Susanto Bange Dogfruit, jack fruit 9,112,500
2 Iyun Bange Stink bean, Mahogany 2,500,000
3 Semin D Bange Borneo tallow nut, tamarind, lanzones, brusch cherries 49,300,000
4 Lijah Bange Stink bean 10,500,000
5 Lase G Bange Dogfruit, tamarind, jackfruit (entawa), brush cherries 21,575,000
6 Aloysius Sango Pepper 21,253,000
7 Jiok Sango Pepper 34,085,000
8 Herawati Gua Dogfruit 1,125,000
9 Suleman Maraya Gua Rubber, Durian, Candle nut, Stink bean 11,878,250
10 Marsudi Gua Shima waliichii, Dog fruit 5,250,000
11 Suratno Gua Dog fruit 9,750,000
12 Mariyono Gua
Candlefruit, banana, star fruit, tamarind, randum, jackfruit,
pepper, coconut, rose fruit, rubber, durian 4,776,650
13 Si'in Gua Jelutong paya, stink bean, dog fruit, rubber 1,680,000
14 Sugeng Separan Gua Dog fruit, rose fruit 2,375,000
15 Supardi Gua ruber 6,508,450
16 Tambah Gua banana, choccolate, coffee, rambutan, tamarind, oil palm, durian 6,322,000
17 Mulyono Gua
Coconut, mahogany, toothless gum, rose fruit, longan, stink
bean, ambarela, rambai, coffee 7,047,000
18 Supardi Gua jackfruit, rambutan, durian 550,000
19 Sakim Gua Banana, dogfruit 17,208,650
20 Marwan Gua jackfruit,sugar palm, schima waliichii 1,670,500
TOTAL 224,467,000
Summary of Compensation for Trees/Plants as result of damage during Construction
![Page 40: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/40.jpg)
Indonesian English
Jengkol Dogfruit
Peluntan Jack fruit
Petai Stink bean
Tengkawang Borneo Tallow nut
Ubah Brush cherries
Kandis Tamarind
Asam Tamarind
Langsat Lanzones
Mentawa Jack fruit (entawa)
karet rubber
Durian Durian
Kemiri candle nut
Medang schima waliichii
Pelaik Jelutong Paya
Jambu rose apple
Pisang Banana
Coklat chocolate
Kopi Coffee
Rambutan Rambutan
Asam Tamarind
Sawit Oil Palm
Rasidi Gliricidia
Kelapa coconut
Mahoni Mahogany
Sukun Toothless gum
Kelengkeng Longan
Kedondong Ambarela / hog plum
RambaiRambai (Baccaurea
motleyana)
Nangka Jack Fruit
Kayu hutan Forest wood
Belimbing Star fruit
Randum randu
Sahang Pepper
Sengon Silk tree
Cempedak Jack Fruit
Aren / Enau Sugar Palm
List of trees/plants
![Page 41: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/41.jpg)
No.
1
2
3
4
s
\
REKAP NAMA, NO REKENING DAN JUMLAH GANTI RUGI TANAM TUMBUH ROW
SUTET 275 kV BENGKAYANG -JAGOI BABANG DI DESA BANGE KECAMATAN SANGGAU LEDO
z
/
Name P•milik ,1NO. Nomlnatif No. Span . No. Rekening Jumlah Ganti Rug!_.,..
HARIS SUSANTO r 1 083-084 3699-01-021071-53-7 9,112,500 (
セ@IYUN / 2 083-084 2,500,000 3699-01-021072-53-3
""' SEMIN.D ;' 3 090-091 4852-01-012600-53-8 49,300,000 /
lUAH I 4 090-()91 4852-01-012601-53-4 10,500,000 ,
-c
LASE. G ( s 091-092 4852-01-012604-53-2 21,575,000 ,,.
\
total 92,987,500
![Page 42: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/42.jpg)
セᄋ@IUK PEMllANGUNAN X
.AICSANA KONTRUKSI WllllGAll KALIMANTAN 5
-IPAN -PBILIK v AIAMAT
83·T.84 HARIS SU>ANTO , BANGE
JI r.83-T.84 IYtJN # BAN(iE
セ@
T.90-T.91 LIJAH / BANGE
,, , T.90-T.91 SB'!IND
I 8ANGE
Mセセ@
- BMMセBZZォ@セMMM
DAFTAR NOMINATIF SUPLISI PEMBAVARAN GAN1l RUOI DANIATAU KOIH'EHSASI TANAM TUMBUH UNTUK KEPERLUAN ROW
SUTET 271 KV BENGKAYANG • .JAGOl llABANO
• KEADMNTANAM
. HARGA-.-PERllATANOIRI') JUNL.1111--MA-PeJlllATANO(_., NAMA T-TllllllUH 1UMBllH JllMIJllllllll')
K 8 BU K • .. K 8 BU
JENGKOL . . 7 U5,ll00 250,000 1.000,000 - . 7,000,000 7,000,00!) PELUNTAN 5 . 7 37.SOO 75,000 275,000 187,500 . 1,925,000 2.112,500
. - . -
. - . -
. . . -
. . . -,,
/
/ 9,112,500
PETAi 4 . 1 125,000 250,000 1,000,000 . . 1,000,000 1.000.000 MAHON I . 1 125,000 250,000 1,500,000 . . 1,500,000 1,500,000
. . .
. . .
. . .
. . .
. . .
. . .
. . . .
2,500,GOD
PETAi 4 . 10 125,000 250,000 1,000,000 500,000 . 10,000,000 10,500,000 _.,,.,. i..-' . . . .
20.SOO.OOO
TENGKAWANG I ., . 10 15 125,000 250,000 1,500,000 . 2,500,00D 22,500,000 25,000,000
UBAH . 16 9 75,000 150,000 300,000 2,400,000 2,700,000 5,100,000
KANOf5 . 7 12 75,000 150,000 750,000 . 1,050,000 9,000,000 10,050,000 ASAM - 6 125,000 250,000 1.000,000 . 1,500,000 - 1,500,000
LANGSAT . 6 8 137,500 275,000 750,000 1.650,000 6,000,000 7,650,000
41-SllLillD
DUA
UCAMATAlt
UIUPATPI
PllOllMI
JUltlMIOANtl llUBI
(Ill'!'
9,112,500
Z.500.000
10,500,000
4',.JOCl,OOO
:IANGI
: SANGGAll l£DO
ZセyanF@
Zセanャャarat@
TANOA"l.\HGM
HARIS SUSAN10
IYUN
WAM
SEMIW D
I
<,,.I
:a
![Page 43: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/43.jpg)
T l'l.N I PEllSERO I INIT INDUK PEMMNGUNNI X
INIT PE1AICSANA KONTRUIGI IARINGAN KAUMANTAN 5
DAFTAR NOMINATIF SUPUSI PEMBAYARAN GANTI RUGI DAN/AT.AU KOMPENSASI TANAM TUMBUH UNTUK KEPERLUAN ROW
SUTET %Tll KV BENGKAYANG • JAGOI BABANG
" KEAIWIN TANAM
0. NOMORSPNI ..-AP£MllJK AL.AMAT -TANAlll TUMBUH TU----NGHRllATANGCllPI Jlllll.NI-- -PERllATANGtll') .JUNt.AH (IP)
/ K • BU K B llU K B BU
; T.91 ·T.92 LASEG セ@BANGE JENGKOL 4 5 7 125,000 250,000 1,000,DOO 500,000 1,250,DOO 7,000,000 8,750,000
KANDIS 5 6 9 75,000 150,000 750,000 375,000 900.000 6,750,000 8,025,000
MENTAWA . 2 4 75,000 150,000 750,DOO . 300,000 3,000,000 3,300,000
UBAH . 6 2 75,000 150,000 300.000 . 900,000 600.000 1,500,000
·' / ,
.. JUMLAH GANll RUGI DNl/AT NJ KOMPfHSASf'rANAM TUMBUH TOTAL
< セMZL[ᄏZ@ -c:'..'Yff' $ G_[セヲᄋZ^ョᄋNW@ ·,-;:o··:-
DESA
ICECAMATAN
ICAIUPATEN
PMMfllSI
JUMl.AH QANTI -lflPI
21,575,000
92,987,500
: IAllGI
: 5AMiGAU UDO ,_,_ : WMAllTAN IARAT
T-TANGIM
LASEG
![Page 44: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/44.jpg)
No.
1
2
3
4
5
6
7
8
-9
25
10
11
12
REKAP NAMA, NO REKENING DAN JUMLAH GANTI RUGI TANAM TUMBUH ROW
SUTET 275 kV BENGKAYANG -JAGOI BABANG DI DESA GUA KECAMATAN SANGGAU LEDO
Nama Pamilik NO. Nomin;;itif No. Span No. R8k&ning Jumlah Ganti Rugi
HERAWATI 1 093-094 4852-01-012484-53-4 1,125,000
,/ / SULEMAN MARAYA / 2 095-096 485,2-01-012481-53-6 11,878,250
, MARSUDI
/"' 3 095-096 4852-01-012483-53-8 5,250,000
/
SURATNO セ@ 4 PYUセPYV@ 4852-01-012488-53-8 9,750,000 セ@
MAR IV ONO 13 095-096 4852-01-012487-53-2 4,776,650
\'
Sl'IN 5 096-097 3699-01-020957-53-6 1,680,000 ' / '
SUGENG SEPARAN / 6 097-098 4852-01-012478-53-3 2,375,000 , '· .r .#
SUPARDI , 7 097-098 3699-01-020962-53-1 6,508,450 ,
/ TAMBAH / 8 098-099A 3699-01-020963-53-7 6,322,000 /
-MULYONO / 9 099A-099 3699-01-020966-53-5 7,047,000,
SU PARDI 11 098-099A 3699-01-020964-53-3 550,000 ,
SAKlfy1 / 10 098-099A 3699-01-020965-53-9 1,050,000
12 099A-099 6,320,200
14 99-100 9,838,450
MARWAN 15 099A-099 3699-01-020967-53-1 1,670,500
total 76,141,500
![Page 45: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/45.jpg)
iRO)
EM8ANGUHAN x セ@ llONTRUllSI JAIWIGAJll KALIMANTAN 5
SPAN NAMAPEMILIK Al.AMAT
l94 HERAWATI
,,,
196 SULEMAN MARAYA 1·
.
196 MARSUDI
-I
096 SURATNO r
セ@
NAllA TANAM TUMBUH
. JENGKOL
,/ . KARET" =/
PETAi
. MEWING· JENG KOL
-
セ@
. JENG KOL T
DAFTAR NOMINATIF SUPUSI PEMBAYARAN 6ANT1 RUGI DAH/ATAU KOMPENSASI TANAM TUMBUH UNTUK ICEPERl.UAN ROW
5UTET Z75W IENGKAYANG • .IAGOl llAllANG
K!ADAAN TANAM HAAGA MAS!NG-MA8ING PER BA TANG (RP) JUMLAH HAAGA MASING-llASING PERBATANG (RP)
TUM-
" • BU " • Ill " • BU
7 1 . 125,000 250,000 1,000,000 875,000 250,000 .
·'
6 5 g 105,000 342,550 527,000 630,000 1,712,750 4,743,000
1 . 3 62,500 125,000 550,000 62,500 . 1,650,000 . 2 80,000 269,750 415,000 . . 830,000
1 2 125,000 250,000 1,000,000 250,000 2,000,000
19 23 75,000 150,000 300,000 1,425,000 3,450,000 . 1 1 125,000 250,000 1,000,000 US,000 250,000 .
14 8 125,000 250,000 1,000,000 1,750,000 . 8,000,000
JUllLAH (RPI
1,US,000
1,125,000 7,085,750 1,712,500
830,000 2,250,000
11,871,ZSO 4,875,000
375,000
5,250,000 9,750,000
t.1SG.DOil
Dl$A
--TAN
-ATDI -JU1llLAH OANTI
RlJGl(RP)
1,125,GOO
ャGャMQセᄋ@
セ@
セᄋMM
:GUA /
:-...UUDO ,._..,_ :ICAllMANfMIMAT
TANDA TANGAN
..
![Page 46: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/46.jpg)
llO)
M8ANGUNANX
IA ICONTR\IKSI JARlllGAN ICAUMANTAN 5
IPAN NAllAPEJIU( /
ALAMAT
97 Sl'IN .,
v J
98 sugenセ@ SEPARAN , .
セ@I
98 SUPARDI セ@
セセ@
I l9A TAlllBAH r
\
セ@
NAMA TANAM TUMBUH
PEIAIK PETAi -
JENGKOL (
KAR ET
JENG KOL JAMBU
. KARET
\
. PISANG COKLAT
KOPI AAMBUTAN
ASAM SAWIT
DURIAN RASIDI
JAM BU PETAi
DAFTAR NOMINATIF SUPLISI PEMBAYARAN GANT! RUGI DM/ATAU ICOMPENSA5I TANAM TUMIUH UNTUK KEPERWAN ROW
5UTET 27SW IENGICAYANG • JAGOl BABAHG
KEAO.UHTANAM llARCM MAS1NG-MAS1NG PERM TANG (RP) JUMLAll HARGA MASINCMIASING PER BATANG CRP) TUllBUH
K B llU K • BU K • BU
2 . 25,000 48,750 75,000 50,000 . . 3 . . 125,000 250,000 1,000,000 375,000 . . 5 . 125,000 250,000 1,000,000 625,000 . 6 . 105,000 342,550 527,000 630,000 .
2 . 2 125,000 250,000 l,000,000 250,DW . 2,000.000 . . 1 25,000 50,000 125,000 - . 125,000
. 19 . 105,000 342,550 527,000 - 6,508,450
. . 10 12,500 25,000 75,000 . . 750,000
. . 5 "40,000 131,300 202,000 . . J,010,000
. 7 26,000 84,500 130,000 . . 91Q.ll00
. . 1 50,000 100.000 275,000 . . 275,CIDO
. . 2 125,000 250,000 1,000,000 . . 2,000,llOO
. . 1 135.000 423,800 652,000 - - 652,000
1 . . 62,500 125,000 550,000 62,500 -15 . 2,500 5,000 10,000 37,500 . . 3 25.000 50,000 125,000 . . 375,CIDO . 1 llS,000 250,DOO 1.000.000 - 250.000
"
JtJMLAll (RP)
50,000 375,000 625,000 630,000
UBO,CIOO 2,250,000
125,000
U75,CIOO 6,508,450
UOIA50 750.QlO
1.01Cl.OIO 91Cl,ClDO
US.DID 2.llOO,QlO
652.QIO 62,500 n,soo
375,CXIO
250,CJOO
UZ2,Qiij
DUA
ICECAMATAN
セQQQQ@-JUMLAH GANT!
RUGl(RP)
l,IBO_ooo
2,375,llOO
BMMセ@
,....,_ ....
:liUA
:SANGGAllllDO
:llENGIUIYAllG
:llALMAHl'M-T
TANDA TANGAN
...
![Page 47: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/47.jpg)
RO)
MUllGIJUMX
M llONTllUICSI JARlllGNI IWIMANrAN 5
SPAN NAaU PEllLI( AIMIAT
/ 199 MU.YOHO ,
/ .. 099 SAKIM /
Ir I
-099 SUPAROI r
セ@
_T_TUM_ . KELAPA .
MAHON! SUKUN JAMBU
KELENGKENG PETAi
KEDOHDONG RAMBAI ·
KOPI ..
. PISANG JENGKOl
. NANGKA RAMBUTAN
DURIAN
DAFTARNOMINATIFSUPUSIPEMIAYAllANGANTIRUGIDAN/ATAUXOMPEHSASITANAMTUMBUHUNTUKIUPEllLUANllOW
SUTET 21SkV llENGKAYANG • JAGOl llAllANCi
KEAllAAN TANAll HARGA IUSING-MASWG PER BATANG (RP) .JUMLAH HARGA MASING-MASING PER BATANG CRPJ lUMBUll
K • au • a IU K • au . . l 130.000 433,550 667,000 . 667.000 1 . . 125,000 250,000 1,500,000 us.ooli . . . . l 137,500 275,000 750,000 . 750,000 . . 1 25,000 50,0DO 125,000 . 125,000 . . 1 125.000 250,0DO 1,000,000 1,000,000 . . 2 125.000 250.000 1,000,000 . 2,000,000 . . 1 137,500 275,000 750,000 . . 750,000 . . 2 137,500 275,000 750,000 . . 1,500,000 . . 1 26,000 84,500 130,000 . . 130,000
. 7 . 12,500 25,000 75,000 . 175,000 . 1 3 US,000 250,000 1,000,000 125,000 750,000 .
. . 1 37,500 75,000 275.000 . 275,000
. . 1 50,000 100,000 275,000 275,000
l . . 62,500 125,000 550,000 62,500 .
" .JlllLAH(RP)
667.000 125,000
750.000 125,000
1,000,000
2,000,000
750.000 1,500,000
130.000
1"4111(» 175,000
875.000
1.050.000 275,000 275,000
セセ@
lllSA
セtan@
ICA9UP#.TIN -JUll.AH GNrh
RllGl(AP)
7,1147.000
l.050.llllU
.........
:G\JA
:SUG&AUUDO
Zセtang@
:-ANIAllAT
TANDA TANGAH
--- .. ---rs -=,_-. ,.,..,: . ZMセMセAACNM
)
![Page 48: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/48.jpg)
PT Pl.N ( P£RSao )
UNIT INDUIC PEMIANGUNAN :II UNIT PE1AICSANA ICON1RUICSI JMINGAN ICALIMANTAN 5
NO. NOMORIPAN MAMA PElllJK /
AL.AMAT -TANAll TUM8UH
12 098-099 SAKIM- , - KARET COKlAT PISANG
ICAYUHUTAN
,
v , 13 098-099 WJllYONO r - KEMIRJ
PISANG BEUMBING
ASAM RANDUM NANGKA SAHANG KElAPA JAMBU ICARET
DURIAN
OセM
I 14 099·099A SA.KIM I. - KARET
KEMIRI RAMBUTAN
KOPI SENGON JENGKOI. SUKUN
PELUNTAN
DAFTAR NOMINATIF SUPUSI PEMBAYARAN GAN1I RUG1 DAN/AT/W llDMPENSA5I TANAM TUMBUH UNTUK 11EPE1j1,UAN ROW sum 17SW BENGKAYAflG·JAGOl IMANG
KEADMNT-HAAGA MASINS-MASING PERBATANG (RP) JUMLAH HARGA MASINO-MA8ING PER BATANG (RP) TUMllUH
K I BU K I llU K • IU
8 4 5 105,000 342,550 527,000 840,000 1,370,200 2,635,000
- - 5 40,000 131,300 202,000 - - 1,010,000
- - 6 12,SOO 25,000 75,000 - - 450,000
3 2,SOO 5,000 10,000 - 15,000
- 1 S0.000 269,750 415,000 415,000
- 10 12,500 25,000 75.000 750,000
- 1 25,000 50,000 125,000 - - 125,000
2 - 125,000 250,000 1,000,000 250,000 - -1 50,000 163,160 251.000 - 251,000
- 1 37,500 75,000 275,000 - - 275,000
- 1 75,000 260,650 401,000 - - 401,000
1 - - 130,000 433.SSO 667,000 130,000 - -- 3 25,000 50.000 125,000 - - 375,000
3 1 105,000 342,550 527,000 - 1,027,650 527,000
- 2 - 62,500 125,000 550,000 - 250,000 -
12 4 2 105,000 342,550 527,000 1,260,000 1,370,200 1,054,000
- 3 - 80,000 269,750 415,000 809,250 -- - 2 50,000 100.000 275,000 - 550,000
- - 4 26,000 84,SOO 130,000 - - 520,000
- - 1 75,000 150,000 300,000 - - 300.000 - 3 125,000 250,000 1,000,000 750.000 - - 4 137,SOO 275,000 750,000 - 3,000,000
- 3 37,500 75,000 275,000 - 225,000 -
JUllll.Ali (RPI
4,845,200
1,010,000 450,000
15,000
LJZLlllO
415,000 750,CIOO 125,CIOO 250,COO 25l,CJOO 215,CIOO 40l,CJOO UCl,000
375,000 l,55'4,650
250,000
.._,_ 3,684,2Cl0
llB,250 550,000
520.0CO JllO.OCO 750.0CO
3.000.llDO 22S.llDO
.......
-ICICAMATMI
kMUPATlll -JUllLAH GANTI
RUGllRP)
5.llll,JGO
4,776,6541
S.al.450
:GUA
:SAlllKMIWIO
:llDIGIAYAHG
ZセanMt@
TANDA TANGAN
r
-.=tt tW'TktJ.
..
![Page 49: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/49.jpg)
'lN ( PEl5EllO)
T INDUK P£MIWIGUNAN X
T PBAICSMA ICQNT1tUICSI .IAltNGAN KALIMANTAN 5
セ@ NOMORSPAN
s 099A·100
. ,
"
\ -l
MAIM PEllllLIK AL.AMAT
MARWA.N
.
NAllATANAll l\IMBllH
. PELUNTAH CEMPEOAK AREN/ENAU
MEDANG
/
DAFTAR NOMINATIF $UPI.ISi PEMllAYARAN GANT! RUGI DAN/ATIW ICOMPENSASI TANAM TUMBUH UN1UK ICEPERLUAH ROW
SUTE1' 275kY llENGICAYANG • JAGOl IABANG
KEADMNTANAM \
TUii-tfo!'RGA lllASING-MASING PER BAT ANQ (RPI JUMLAH MARGA llWllNG-MASING PER mtセ@ (RP)
K 8 BU K • 1111 K • ... . 2 . n,soo 75,000 275,000 . 150,000 . . . 4 37,500 75,000 250,000 . . 1,000,000 . 2 . S7,000 185,250 285.000 . 370,500
2 . . 75,000 150,000 300,000 150,000
JUMl.Alt (RPI
150,000 1,000.000
370,500 150,llOO
1,670,5CJO
TOTAL GANTI RUGI
DISA
ICECAMATAH
ltAM»A'IEll -JUlll.All GANT!
MIGi (RP>
1,670,500
76,141,500
:GUA
:-IEDO
: llEHGllAV-: _All _T
iAND-' TANGAN
..
![Page 50: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/50.jpg)
No. Na ma
1 ALOYSIUS
1. JIOIC
REKAP NAMA, NO REKENING DAN JUMLAH GANTI RUGI TANAM TUMBUH ROW
SUTET 275 KV BENGKAYANG -JAGOI BABANG DI DESA SANGO KECAMATAN SANGGAU LEDO
No. Nominatlf No.Span No. Rekenlna Jumlah Gantt Ru11:1
1 109-110 4852-01-012507-53-6 Rp 21,253,000
·. 1. 114-115 3699-01-020995-53-4 Rp 34,085,000
TOTAL Rp
\
![Page 51: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/51.jpg)
)
; セ@
g j I ; ;
::! セ@セ@
セゥゥ@!! u ....
lh セセ@ \ セ@JB
i
§
s ! セ@
; E . セ@
i §
セ@§
j ;:; i"
I
Fl;(
i ! セ@ §
iii
!€ iセ@ J
i 0
n 0
..
•
I p 0
セ@
セi@ ; c
Ill
h ! i: セ@
Ii *
Aセ@セ@
11
. i i
it i セ@ セ@.. It>
ii It>
セ@ i i R ti
セ@
i . j ᄋセ@
-
; Ill
I i I セ@ I
§ ! j
!
i I セ@i
& !
I ! = =
![Page 52: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/52.jpg)
ANNEX 6
ACTION PLAN TO SOLVE LAND ACQUISITION AND ROW
ISSUES 275 kV BENGKAYANG – JAGOIBABANG
TRANSMISSION LINE
![Page 53: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/53.jpg)
No District Subdistrict Village Tower No.Problems Action
1 Magmagan Raya 7-9Dispute about ownership of land and plants
between Mr. Firdaus and Mr. Slamet
Prianggoddo.
PLN UPK 5 has discussed with all owners
of disputed land and MUSPIKA. Result
achieved: Statement letter of owner on
behalf of Mr. Firdaus and signed by all
family members and witnessed by village
leader and subdistrict (MUSPIKA) will be
made in 2nd week of August 2015.
2 36-50Pending inventory of 6 owners plants,
discussions have been done many times
for compensation.
Pending inventory will be accompanied by
villag leaders, subdistrict, and MUSPIKA.
3 46-47Land owners dispute on land between B.
Lena and Pardi sub district Lumar
Coordination has been conducted between
village leader and subdistrict.
4 49-50
Disputed land at subdistrict border between
Lesabella villages and Lamolda village,
Ledo subdistrict and Lumar subdistrict.
Plant owner Mrs. Lestari claim for trees
that has been compensated at other
village.
Coordination has been conducted between
village leader and subdistrict facilitated by
PLN UPK 5 but still has not met an
agreement.
5 48-49Disputed land and plants between Mr. Atik
and Mr. Barnabus.
Coordination has been conducted between
village leader and subdistrict, facilitated by
PLN UPK 5 but still no agreement has
been reached.
6 Sahan 20-21Land owner Donatus Janius requests high
price for plants.
Coordination will be conducted with
plantation institution and the owners
facilitated by PLN UPK.
7 128-129Land owner requests compensation for
plants which are not stated on decree of
Bengkayang Regency.
Coordination will be conducted with
plantation institution and the owners
facilitated by PLN UPK 5.
8 135-136Land owner claims for compensation of
seedlings and small plants.
Coordination will be conducted with
plantation institution and the owners
facilitated by PLN UPK 5.
9Request compensation for house passed
by transmission line.
Coordination has been done between PLN
UPK 5 and Public Works agency, at end of
June 2015 still waiting for response letter
from Public Works agency.
10 147-148 Request for higher price for palm trees. Not yet met agreement.
11 148-149Request for compensation for dike and
unproductive rubber trees which are
claimed as productive rubber trees.
Coordination will be conducted with owners
and head of subdistrict facilitated by PLN
UPK 5.
12 149-150 Disputed parcels. No action yet.
13 151-152 Request compensation for dyke.
Coordination will be conducted with owners
and head of subdistrict facilitated by PLN
UPK 5.
14 164-168Disputed parcels between company PT
WKN and 3 persons.will be resolved by middle of August
15 165-166 Dispute parcels. No action yet.
16 166-167One owner claims compensation for house
passed transmission line.
Coordination has been done between PLN
UPK 5 and Public Works agency, at end of
June 2015 still waiting for response letter
from Public Works agency.
17 Jagoibabang 179-180Claim higher price for small plants and
trees.
Coordination will be conducted with owners
and head of village and subdistrict
facilitated by PLN UPK 5.
Source: PLN UPK 5
Monitoring of Land Acquisition Issues in ROW of 275 KV Bengkayang - Jagoibabang Transmission Line up to 30 September 2015
Bengkayang
Seluas
Lumar
Lamolda
Mayak
Seluas
![Page 54: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/54.jpg)
ANNEX 7
ACTION PLAN TO SOLVE LAND ACQUISITION ISSUES
FOR 150 kV BENGKAYANG – NGABANG – TAYAN
TRANSMISSION LINE
![Page 55: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/55.jpg)
Releaseed Not yet
1 Lumar Magmagan 1A-4 8 8
2 Bengkayang Sebalo 5-21 17 17
3 Bani Amas 22-26 6 6
4 Dharma Bakti 34-38 5 4 1 T. 34 Land tilte deed with bank Tower will be re-aligned
5 Sebetung Menyala 27 - 33 7 7
6 Bangun Sari 47 - 53 7 7
7 Lulang 54 1 1
8 Setia Jaya 55-67 13 13
9 Sebente 39-46 8
7 1 T.46 Owner does not agree to price offered by
PLN
PLN Continously coordination with landowner,
head of village and head of sub district but still
not met agreement
10 Untang 68-78 11 11
11 Kampet 79-85 7 7
12 Padangpio 86-95 10
8 2 T 89 disputed land and T 93 belongs to
plantation agency.
T 93 on verified document process at
plantation agency, Landak District, not
completed yet
13 Ringo Lojok 96-108 1312 1 disputed parcels between 3 APs
On process resolvement with Head of villages
and subdistrict
14 Angkaras 109-119 11 11
15 Ansang 120-123 4 4
16 Mamek 130-149 20 20
17 Bagak 150-156 7 7
18 Darit 124 - 129 6
5 1 T 127 landowner does not agree to the offered
price and does not intend to sell the land
On negotiation process. On consideration to
have realignment in this area resulting in one
additional tower.
19 Anik Dinggir 157-168 12
11 1 T 168 include in Ngabang sub districtCoordination with landowner, head of village
and head of subdistrict have been conducted
but still not yet met agreement .
20 Antan Rayan 169-190 2220 2
2 Towers (T168, T171) not yet reached
agreement on priceNegotiation in process.
21 Dangku 191 - 207 17 17
22 Amboyo Utara 208-230 23
21 2
T222 and T223 belong to Mr. Finsen of
agriculture agency kab. Landak; he does not
intend to sell his land to PLN
Negotiation in process.
231-235 5 5
23 236 - 238 33 re-alignment
Inventory will conducted after survey of
realignment is completed
24 Munggu / Ambarang 239 - 262 2424 re-alignment
Inventory will conducted after survey of
realignment is completed
25 117 - 128 1210 2
T 117 demand PLN should buy whole of his
land and T 128 no inventory yet Negotiation did not reach agreement
116-116 B
3 towers Waiting for approval of tower
location
Sub total 279 239 40
Monitoring of Land Acquisition Issues for 150 kV Bengkayang - Ngabang - Tayan Transmission Line ( Status 30 September 2015)
No District Sub District Village No TowerTotal
Tower
Land StatusProblems Action
Towers of 150 kV Bengkayang - Ngabang Transmission Line
Bengkayang
Teriak
Landak
Banyuke Hulu
Menyuke
Ngabang
Sungai Kelik
Tebedak
![Page 56: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/56.jpg)
Releaseed Not yet
Monitoring of Land Acquisition Issues for 150 kV Bengkayang - Ngabang - Tayan Transmission Line ( Status 30 September 2015)
No District Sub District Village No TowerTotal
Tower
Land StatusProblems Action
Releaseed Not yet
26 Tebang Benua 14 - 25 12 12
27 A-H 8 8 Waiting for approval of tower location
28 1 -13 14
12 2
T 01 Adjacent to house and house owner asked
PLN to realign the tower and T 04 A waitingfor
KEC to install stakes
Coordination and re - check with survey result
of KEC
29 Mak Kawing 26-31 6 6
30 Temiang Mali 32-42 10 10
31 Tae 43-46 5 5
32 Padi Kaye 47-60 14 14
33 Landak Jelimpo 88 - 99 1210
T 95 Mr Syaidan refused the offered price and
asked for Rp. 40 million /parcel
34T 98 Mr Juhin does not agree to offered price
35 Angan 61-79 19 19
36 Kayu Ara 80-87 8 8
37 Tubang Raeng 100-110 11 11
38 Ngabang Tebedak 111 - 114 C 7 2 5 Waiting for approval of tower location
Sub total 126 109 17
TOTAL 405 348 57
Total Tower Approved 390
Total Tower on process approval 15
Total Tower released 348
Total tower not yet released 57
Source: PLN UPK 5
Jelimpo 2
Land StatusProblems Action
Towers of 150 kV Tayan- Ngabang Transmission Line
Sanggau
Tayan HilirCempedak
Balai
No District Sub District Village No TowerTotal
Tower
![Page 57: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/57.jpg)
ANNEX 8
PHOTOS
![Page 58: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/58.jpg)
Page 1 of 3
Picture of socialization at Magmagan Village Hall on 31 July 2015
![Page 59: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/59.jpg)
Page 2 of 3
Mrs. Saliyem (tower no 96; 275 kV line) in her new house
The house under construction belongs to Mr. Boimin’s family who was identified as
severely AP at tower No. 99 -100 of 275 kV transmission line
![Page 60: Social Monitoring Report - adb.org · This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of](https://reader031.vdocuments.us/reader031/viewer/2022041502/5e22a696b4ec9b6c9d114fd5/html5/thumbnails/60.jpg)
Page 3 of 3
Mr. Sunarto (tower no. 97; 275 kV transmission line) renovated the house and
bought a car
Informal meeting with community relation officer of the Contractor and Head of Gua
Village concerning compensation which had already been delivered