sciegra - dsm
TRANSCRIPT
-
8/6/2019 SCIEGRA - DSM
1/23
Jay Shankar Tewary
DSM
-
8/6/2019 SCIEGRA - DSM
2/23
Complexities in Energy Efficiency
y Focuson supply side- Due to visible Consequences.
y Less focuson demandside and availability ofservices.
y Renewable energy- Huge investment, lessconversion
efficiency, land acquisition, intermittent availability,aesthetics.
y Technology up gradation andR&D
y Financing Constraints
y Lack of awareness&poor enforcement ofLaws
y Sustainable development.
-
8/6/2019 SCIEGRA - DSM
3/23
Demand side Intervention Potential and
Opportunities
Source: BEE, MOP, GOI
-
8/6/2019 SCIEGRA - DSM
4/23
ConventionalMethod ofDSM in
Indiay Municipal Corporations
y Water Pumping, Street Lighting & Office Lighting
y Hospitals& Commercial Buildings
y HV AC & Building Lighting
y Residences
y Building services&Lighting
y Power Utilities
y Demand Side Management of distribution of power (generally
limited to CFL lamp schemes etc)
y Manufacturing Companies
y Machinery & improvement in system efficiencies / productivity
-
8/6/2019 SCIEGRA - DSM
5/23
Utility Driven - DSM
-
8/6/2019 SCIEGRA - DSM
6/23
-
8/6/2019 SCIEGRA - DSM
7/23
Opportunity in Peak Clipping
-
8/6/2019 SCIEGRA - DSM
8/23
Challenges
y During Peak Frequency normally fallsbelow 49.2 Hz
y Additional Short Term Power Purchase agreement Cost
variesbetween Rs6 Rs 18 /unit
yLimited Capacity of Power Corridor Forcing utility tocarry out DLR ( DistressLoadRelief)
-
8/6/2019 SCIEGRA - DSM
9/23
Opportunity for high end consumer
y 5-10 % of Consumer of an utility consumes 40 -60 % of the
electricity of an urban utility
y Normally these HRB (High Revenue Billing)consumer are
concerned with quality andcontinuity of Power and agreedto extend additionalsupport
y We can design a system in agreement with these utility and
their high endconsumer so that during peak period A
message canbe passedon to these consumer for reduction ofload and an incentive tobe paid for the amount of energy not
usedduring such peak loading condition.
y Probable solution maybe AMI for such consumer
y
We can take lead for allsuch effort andcanbe a mediatorbetween utilit andconsumer
-
8/6/2019 SCIEGRA - DSM
10/23
Opportunity for Domestic
Consumersy During power crisissituation, loadshedding on rotationalbasis isbeing carriedout at an utility
y Loadshedding to a consumer normally reflects as a discomfort and assoon as the loadshedding is
restored Normal tendency of a consumer is toswitch ON power hunger equipment (AC , heater
etc) at their fullcapacity so that during next loadshedding period, they may get an relief to a some
extent
y Repeatedloadsheddingbecome s a cause of man handling, consumer protests etc for an utility
y Thus, During entire power crisis situation At some point of time consumer consumes
additional electricity and at some duration No electricity is available to them
y Some consumer had taken temporary arrangement such asinverter / generator etc at their end
y It hasbeen found that a consumer is happy to get emergency lighting load for 24x7, and will not
mind for shedding of their power equipment ( AC, heater etc) during peak loadcondition
y We can take a lead andpropose toinstall a system so that during normalcondition, a consumer
gets entire electricity,but during some emergency period /power crisissituation, though the
supply for consumers essentialloadisuninterruptedbut the supply for their power hunger
equipment willbe disrupted
y Benefits
y No need for inverter with a slight wiring modification uninterruptedsupply to their
essentialloading is ensured
y No need topurchase additionalcostly power Utility can able toserve the minimum
requirement of their consumer on 24x7 basis
-
8/6/2019 SCIEGRA - DSM
11/23
Opportunity in AT&C Loss Reduction
-
8/6/2019 SCIEGRA - DSM
12/23
Challengesy High AT&C Loss ~ 35 % in India
y 24-25 % of energy islost due to theft and rest is accountable for technicallosses
y Cause of Technicalloss
y Lower size conductor
y Overloaded transformers andliney Poor Voltage andpower Factor
y High Resistance Joints
y Cause ofcommerciallosses
y Sluggish energy meter
y Pilferage of meter
y Direct Theft
y Poor Billing efficiency
y Poor collection efficiency
-
8/6/2019 SCIEGRA - DSM
13/23
Opportunity
y Higher the loss easier to reduce
y It is established that with reduction of AT&C loss, the
demand decreases
yWe can develop abusiness model with R-APDRP , FinancialInstitution, Regulators andutility for reduction ofLoss and
sharing ofprofit ( 1% loss reduction for NDPL generates
addition revenue of (~)Rs.26 Cr.)
y
Some of the steps may include replacement of energy meter,pillar box metering, IT intervention in commercial
processes, GISbased consumer audit, Energy audit, DT
metering , HVDS, LTABC etc. (dependsupon utility profile)
-
8/6/2019 SCIEGRA - DSM
14/23
Oppurtunity in consevation of Energy
-
8/6/2019 SCIEGRA - DSM
15/23
Conservation of Energy Bulk
Player
y 5 -10% of the consumer accounts for 40-50 % ofRevenue
y We can tie up with utility and may provide free energy
audits to these consumer
y
The report canbe submittedclearly mentioning the ROIy If the consumer agreed toimplement We can share the
profit generated from the project
y Finance canbe arrangedby us and the repayment maybe
explored through utility bills ( from the energy saving inmonthlybill through the project)
-
8/6/2019 SCIEGRA - DSM
16/23
Conservation of Energy Agricultural
Load
y Over 35 % of electricity consumedby Municipal and
agriculture
y Agriculturalconsumers enjoyssubsidy on electricity
y
Gapbetween power purchase and energy sold to agriculturalconsumer isbetween Rs 1 -3
y Saving in electricity to agriculturalload may generate
additional revenue for an utility with simultaneoussaving in
electricity bill for farmersy Huge scope of energy savings in agriculturalloadin India
y we can develop a model with partial funding from utility
and farmer with guaranteedsavingsin electricity
y We can alsoimplement a system to ensure agricultural
-
8/6/2019 SCIEGRA - DSM
17/23
Conservation of Energy small
consumers
y Though CFLlamps, T5 tubes, electronicsballast provides a
mean for energy savingsbut its effects are limitedin spite of
offering discount on itspurchase
y
We can tie up with utility and meet with RWA /itsconsumer for proving a complete energy saving packages
for domesticconsumers
y Toimplement above, we can train localpersonnel and may
create a channel/ franchise, whocan offer such serviceson
behalfofutility
y Cost ofsuch project maybe collected through utility bill
-
8/6/2019 SCIEGRA - DSM
18/23
Opportunity in Renewable Energy
-
8/6/2019 SCIEGRA - DSM
19/23
Opportunity
y Preferential tariff for green energy
y Government subsidy / fiscal and financialincentive for
green energy
y
By 2012 It willbe mandatory for a D
ISCO
Mtoprocure
10 % ofits energy from renewable source
-
8/6/2019 SCIEGRA - DSM
20/23
Solar Power
y High Installation Cost - Commissioning cost of a 5 KWplant
is approx 7 Lakh
y Financially viable, only if government subsidy and
preferential tariff for solar power is availabley Assuming a subsidy of50% on purchase andpreferential
tariffofRs5/unit - ROIis around 12 years
y We can develop a model with consumer, utility , regulator
and government so that specialpreference is available forsolar power with a provision topump additionalpower to
Grid with preferential rate
-
8/6/2019 SCIEGRA - DSM
21/23
Other Oppurtunity
-
8/6/2019 SCIEGRA - DSM
22/23
Other Opportunity
y Normally in Industries the energy cost is around 5 -10 %
of total turnover andprofit of the organization is matching
with above.Thus20 % saving in electricity means a 20% rise
in profit
y We can tie up with Business Body / Business Group andcan
offer free energy audits toits member and Offer Solutions
basedon our products
y Basedon report - if energy savingsproject isimplemented,
We can share the savings
y Street Lighting SpecialLED lamps etc depending upon
situation
y M
unicipal Pumps etc.
-
8/6/2019 SCIEGRA - DSM
23/23
Thanks