RSa
1. Activit
1.1 Dism
D
complete
and recon
2. Activit
2.1 Dism
W
N1. We h
reconnect
2.2 The r
W
from rain
this mont
and have
2.3 To gr
W
mixing w
opening.
3. Activit
3.1 The r
W
wall in o
eport: April-Juambor Prei Ku
Waseda
R
ties and Pro
mantling wor
During April
ed to disman
nnect the bro
ties and Pro
mantling wor
We continued
have continu
ted the brok
restoration
We have star
n water pene
th we have c
using morta
rind brick in
We have cru
with other m
This month
ties and Pro
restoration
We continue
order to prot
une, 2012 uk Conservati
Sambor
a University, J
Report on t
ogressive of
rk at tower
we had dism
ntle the brick
oken pieces t
ogressive of
rk at tower
d to dismant
ued from la
ken brick for
work at N1
rted the resto
etrated into th
completed to
ar for sealing
nto flour
shed the bro
material such
h we made 3
ogressive of
work at N1
the restorati
tect the rain
ion Project
r Prei Kuk
Coope
Japan and Mi
the Activiti
f the Conser
N1:
mantled the
k of 32 layer
then lay it by
f the Conser
N1:
tle the brick
ast month wo
20 pieces. (
4-1:
oration work
he wall, whi
o apply new
g of 115 sets
oken brick an
as clay pow
bags of bric
f the Conser
4-1
ion work at N
n water do n
1
k Conserv
erating betwee
nistry of Cult
ies Work in
rvation Wor
upper part o
rs that were 4
y each layer
rvation Wor
k of upper pa
ork and had
(Photos 9-11
k at N14-1 t
ich will mak
brick on the
s. (Photos 12
nd grind it f
wder slake li
ck powder.
rvation Wor
N14-1 by ap
not penetrat
vation Pro
en
ture and Fine
n April-Jun
rk in April
of east face,
435 pieces. A
with numbe
rk in May
art of wall o
d dismantled
1)
to protect th
ke the brick d
e top of wall
2-31)
for mortar. W
ime and san
rk in June
pplying new
te into the w
oject
Arts, Cambo
ne, 2012
southern sid
After disman
ering. (Photo
of east face,
d the brick f
he top level o
decay and p
in amount 4
We use the g
nd for fixing
brick to cov
wall. In this
odia
de of N1, we
ntled we cle
os 1-8)
southern sid
for 10 layers
of the brick
lant growing
485 piece on
grinding bric
into brick’s
ver the top o
month we
e had
eaned
de of
s and
wall
g. In
n 8m2
ck for
s gap
of the
have
RSa
complete
used 155
the gap b
We have
to protect
3.2 To gr
In
students h
have to c
flour and
3.3 Weed
In
(Photos 6
3.4 New
A
stone sha
Team for
join and l
3.5 Excav
3.5.1
St
Architect
ancient c
this time
in averag
yet ident
building
is in form
east corn
trench til
plan of th
after clea
M
eport: April-Juambor Prei Ku
ed the work b
sets of mor
between the
completed t
t the building
rind brick in
n this month
have volunte
rash the bro
d sieve to get
ding work a
n this month
68-73)
sandstone s
As Sambor P
aping, we ha
r Safeguardin
learn this ne
vation surv
1 The excava
tarted from
tural History
ity and cont
with numbe
ge. Througho
ify the func
and has one
m of gopura
ner of the gr
l the purpos
he structure.
aning we hav
More detail o
une, 2012 uk Conservati
by using bric
rtar to fix it.
new and or
the restoratio
g from hard
nto flour
we also con
eer to pound
ken brick til
t powder. (Ph
at Sambor g
h we have we
shaping to r
Prei Kuk Con
ave invited th
ng Angkor t
w experienc
vey inside Ia
ation condu
m May 29 a
y had cond
inued from p
ering of I, J,
out the exca
ction of the
e drain of lat
at northern
roup were in
e layer, we r
(Photos 93
ve identified
f the excava
ion Project
ck 533 piece
(Photos 32-
riginal brick
on work at N
dry of sun l
ntinue to grin
d the brick ch
ll remain in
hotos 66-67)
group
eeded at Pra
restore the d
nservation P
hree experts
to train and h
ce. (Photos 7
anapura
ucted by Wa
and finished
ducting the a
previous sur
K, L and M
avation resul
structure ye
terite located
part of the g
n form of en
record the so
, 106-111)
it’s kind of
ation result w
2
es and applie
-41). For fini
by using 29
N14-1 at the
ight. (Photo
nd brick into
hip. As usua
small piece
)
asat Sambor
door jamb o
Project has n
from JASA
help us. We
74-89)
aseda Unive
d on June
archaeologic
rvey at O Kr
M. The total
lts we found
et. There are
d at eastern f
group. (Phot
nclosure wa
oil layer and
The artifact
group trench
will report by
ed to the top
ishing the re
9 sets of sea
end of June
s 50-63)
o flour. On J
ally the proc
(Photos 64-6
group on tow
of N1 at east
no experts of
A, which und
e also gave c
ersity:
21, Wased
cal excavati
ru Ke village
square area
d building st
e many pits
face north si
tos 98-100).
alls. (Photos
d analyze the
s which we
h and feature
y the excavat
of the wall
estoration wo
aling mortar
e, but still ke
June 20 the A
essing to gri
65), then tak
wers N1, N7
tern entranc
f stone conse
der the Japan
chance to ou
day Uni. of
ion survey
e. We have d
a was 58m2 a
tructures, in
as column
ide. (Photos
. And others
101-106). A
e soil feature
found durin
e. (Photos 11
tion survey t
in 8m2; and
ork we have
r. (Photos 42
eep the blue s
American co
ind brick firs
ke it to grind
7, N9 and N1
ce
ervation and
nese Govern
ur local work
f Laborator
inside Isana
dug 5 trench
and 150cm d
I Trench we
hole around
90-97) J Tr
s trench at so
After opened
es and recor
ng the excav
12-115)
team.
have
e seal
2-49)
sheet
ollege
st we
d into
10.
d new
ment
ker to
ry of
apura
hes in
depth
e not
d the
rench
outh-
d the
d the
ation
RSa
3.5.2
Th
survey un
Kru Ke s
excavatio
we take t
there is a
seems to
excavatio
west. Mo
A
have visi
structure.
structure
preservat
3.6 An G
W
inside the
the archa
3.7 An ex
L
was the s
conservat
conservat
mortar on
weed the
W
shortage
conservat
eport: April-Juambor Prei Ku
2 The excava
he Ministry
nder the De
stream, wher
on survey aim
the place inv
a trench whe
o continue t
on they made
ore detail the
At the last da
ited the exc
. (Photos 12
should not
tion place.
GPS survey i
Waseda team
e ancient cit
aeological str
xchange pro
Like in last y
second time
tion project.
tion work at
n tower N14
mesh on the
We welcome
in this rec
tion project
une, 2012 uk Conservati
ation conduc
y of Culture
epartment of
re the Comm
m to clarify
volve with t
re they foun
to the north
e the soil dr
e MCFA will
ay of their m
avation site
28-131) Acc
allow const
inside the Is
m conducted
ty Isanapura
ructure for n
ogram with
year we hav
that we allo
. The colleg
t Sambor Pr
4-1 (Photos 4
e temple (Ph
the volunte
ent year, w
ion Project
cted by Mini
e and Fine
f Archaeolog
munity Mark
the feature u
the tourism d
nd a brick str
h about 3 m
ill of 27 hol
l report at th
mission Mini
and discuss
cording the
truct any str
sanapura
d the GPS s
by using ve
next excavati
Global Exp
e opened fo
w Global Ex
ge student o
rei Kuk. Th
48-49), to cr
hotos 68-73)
er for the co
which we ca
3
istry of Cultu
Arts has co
gy that carry
ket will be co
underground
developmen
ructure in fo
meters more
es in east-w
he end of July
istry of Tou
s about the
excavation r
ructure over
survey throu
ery accuracy
ion research.
plore and K
r volunteer w
xplore and K
of American
e student ca
rash and grin
.
onservation
an hire man
ure and Fine
onducted the
y the excava
onstructed u
d inside the a
nt. (Photos 1
orm a wall bu
e through t
west section f
y.
rism and AD
concept des
result the tr
r on; and m
ugh the stru
y GPS mach
. (Photos 132
Khiri Travel
with our con
Khiri Travel
through the
an join the w
nd brick into
work accord
ny local vil
e Arts:
e archaeolo
ation at Mak
under the fun
ancient city
16-131). Am
ut not so cle
the hand du
from O Kru
DB team pro
sign and the
rench which
must to keep
ucture traces
hine to identi
2-135)
Agency
nservation p
Agency to p
e Global Ex
works such
o flour (Phot
ding to the b
llagers to p
gical excav
k Pi area ne
nds of ADB.
Isanapura be
mong 8 tren
ear. The stru
ugar. Beside
Ke stream t
oject coordin
e location o
found the b
this area a
s of monum
ify the featu
project. This
participate in
xplore joined
as to sealing
tos 64-67) an
budget fund
articipate in
ation
ear O
. The
efore
ches,
cture
e the
o the
nator
of the
brick
s the
ments
ure of
year
n our
d the
g the
nd to
very
n the
RSa
Photo 1 D
Photo 3
Photo 5b
Photo 7 b
1. The C
eport: April-Juambor Prei Ku
Dismantle work
3 Drawing plandisman
5 Activities of cbrick by SCP lo
Activities of cbrick by SCP lo
Conservatio
une, 2012 uk Conservati
k at N1 in April
n on plastic befntle
cleaning dismaocal workers
cleaning dismaocal workers
on Activity
ion Project
l, 2012
fore
antled
ntled
in April
4
Photo 2
Photo 4 Bla
Photo 6 Abri
Photo 8 D
2 Cleaning bef
Brick layer afteaid on plastic p
Activities of cleick by SCP loc
Dismantled bricafter conne
fore dismantle
er dismantle anlan sheet
eaning dismantcal workers
ck is laid downected
nd
tled
n to
RSa
Photo
Photo 1proofin
2. The C
Photo 1N
eport: April-Juambor Prei Ku
os 9, 10 The sitpart of N1, af
12 The situationg the new bric
View from
onservation
14 The activitieN14-1, view fro
une, 2012 uk Conservati
tuation of the ufter dismantle
on of N14-1 befck on the top wthe west
n Activity in
es of laying briom south-west
ion Project
upper
fore wall.
n May
ick at
5
Photo 1
Photo 13proofing
Vi
Photo 15 N1
1 The situationof N1, after d
The situation the new brick
iew from the n
The activities 14-1, view from
n of the upper pdismantle
of N14-1 befoon the top wal
north-west
of laying brickm the south
part
re ll.
k at
RSa
Photo 16w
Photo 1applied
Photo app
Photo 22 w
eport: April-Juambor Prei Ku
6 The situation ork after applie
18 The situationd new brick at
20 The situatiplied new brick
The activities work, view from
une, 2012 uk Conservati
of the conserved new brick
n of N14-1 befnorth-east corn
on of N14-1 afk at south wall
of the conservm the north
ion Project
vation
fore ner
fter
vation
6
Photo 17 TN14-1, vi
Photo 19applied n
Photo 21 Tletter, c
Photo 23 Twork at s
The activities oiew from the so
The situation new brick at so
The new brick wondition after s
he activities ofsouth wall, view
of laying brickouth-west corn
of N14-1 beforouth-east corne
with mark of Ssealing the gag
f the conservatw from the eas
k at ner
re er
SCP g
tion st
RSa
Photo 24work a
Photo 26work at
Photoconser
Photo 30work at so
eport: April-Juambor Prei Ku
4 The activitiesat south wall, v
The activities t south wall, vi
o 28 N14-1 the rvation work, v
The activities outh-west wall
une, 2012 uk Conservati
of the conserview from the w
of the conserview from the w
activities of thview from over
of the conservl, view from th
ion Project
vation west
vation west
he rall
vation he east
7
Photo 25 Twork at s
Photo 27
Photo 29 Twork at
Photo 31 Twork at sout
The activities oouth wall, view
View of southapplied new
The activities ofwest wall, view
The activities oth-east corner,
f the conservatw from the nort
-east corner afbrick
f the conservatw from the eas
f the conservatview from the
tion rth
fter
tion t
tion e east
RSa
Photo 32 s
Photo 34 Tnorth-
Photo 36 Tnor
Photo 38 Tat no
3. The C
eport: April-Juambor Prei Ku
The state of thsouth wall, view
The activity of -east corner, vi
The activity of rth-east corner
The activities oorth-west corne
onservation
une, 2012 uk Conservati
he conservationw from the eas
the conservatioiew from north
the conservatior, view from we
of the conservaer, view from n
n Activity in
ion Project
n work at t
on work at h-east
on work at est
ation work north
n June
8
Phot
Pho
Ph
Pho
to 33 The statewall east
oto 35 The condnort
hoto 37 The actnorth-west c
oto 39 The actinorth w
e of the conservpart, view from
dition of the coth-east corner,
tivity of the concorner, view fro
ivities of the cowall, view from
vation work at m the west
onservation wodetail
nservation worom north-east
onservation wom overall
south
ork at
rk at
ork at
RSa
Photo 40 T
Photo 42 V
Photo 44 Tgap be
Photo 46 T
eport: April-Juambor Prei Ku
The activities oat north-west
View of north-brick, view f
he activities ofetween the bric
The activities ofgap on the to
une, 2012 uk Conservati
of the conservacorner, detail
-east after finisfrom north-east
f sealing the mck at south-eas
f sealing the mop at south wal
ion Project
ation work
shed the laid t
mortar into the t corner
mortar into the l
9
P
Pho
Pho
Pho
Photo 41 The stsouth-eas
to 43 The activgag between
oto 45 The state othe gap openin
oto 47 The activgap on
tate of the consst corner, view
vities of sealingthe brick at so
of the conservatng and applied ne
vities of sealingn the top, view
servation workfrom south
g the mortar inouth-east corner
ion work after gew brick on wall
g the mortar intw overall
k at
nto the r
gaging l
to the
RSa
Photo 48 Tgap on the
Photo 50
P
Pho
eport: April-Juambor Prei Ku
The activities ofe top of wall by
0 N14-1 after fview fr
Photo 52 N14-1
oto 54 N14-1 v
une, 2012 uk Conservati
f sealing the my American col
finished the conrom north
1 view from so
view from south
ion Project
mortar into the llege student
nservation,
outh
h-east
10
Photgap
P
to 49 The activp on the top of
Photo 51 N14-1ins
Photo
Photo 55
vities of sealingwall by Ameri
1 view to southside from the n
o 53 N14-1 vie
5 N14-1 view n
g the mortar intican college stu
h-east corner frnorth
w north
north-east
to the udent
om
RSa
Photo 5
Photo 58
Photo 60
Photo 62
eport: April-Juambor Prei Ku
56 N14-1 south
8 N14-1 northefrom
0 N14-1 southefrom
N14-1 view ove
une, 2012 uk Conservati
hern part, view
ern wall, inner m south
ern wall, inner m north
verall from topeast
ion Project
from east
wall, view
wall, view
p, view from
11
Ph
Pho
Ph
Ph
hoto 57 N14-1
oto 59 N14-1 w
hoto 61 N14-1
oto 63 N14-1 v
front elevation
western wall, ineast
top wall, view
view overall frwest
n, view from e
nner wall, view
w from north-w
rom top, view f
east
w from
west
from
RSa
Photo 64 Tvolunte
Photo 66 Tflour, volu
Photo 68the tower
eport: April-Juambor Prei Ku
The activities oeer by America
The activities ounteer by Ame
8 The activitiesr, cooperating b
student a
une, 2012 uk Conservati
of crashing thean college stud
of grinding bricerican college s
s of weeding buby American cat N10
ion Project
e brick, dent
ck into student
ush on college
12
Photo 65 Thevolunteer
Photo 67 Thflour, volun
Photo 69 Thetower, co
e activities of cr by American
he activities of nteer by Americ
e activities of woperating by A
student at N
crashing the brcollege studen
f grinding brickcan college stu
weeding bush oAmerican collegN10
rick, nt
k into udent
on the ge
RSa
Photo 70 the tower,
Photo 72 the tower
Photo 74 TJASA ca
eport: April-Juambor Prei Ku
The activities , cooperating b
student at
The activities r, cooperating b
student a
The sandstone ame to SPK for
work
une, 2012 uk Conservati
of weeding buby American cot N10
of weeding buby American coat N1
shaping expertr help and train
ker
ion Project
ush on ollege
ush on ollege
ts from n SCP
13
Photo 71 Thetower, coo
Photo 73 Thetower, co
Photo 75 Stamaking a
e activities of woperating by A
student at N
e activities of woperating by A
student at
arted to cut thedoor jamb of N
weeding bush oAmerican collegN10
weeding bush oAmerican collegN1
e new sandstonN1, east entran
on the ge
on the ge
e for ce
RSa
Photo 74 Tm
Photo 76 Tm
Photo 78 Tmaterial, o
Photo 8
eport: April-Juambor Prei Ku
The activities omaterial for N1’
The activities omaterial for N1’
The activities ofour local worke
80 Adjust the l
une, 2012 uk Conservati
f shaping a new’s door jamb
f shaping a new’s door jamb
f shaping a newer are trying to
level of sandsto
ion Project
w stone
w stone
w stone o shape
one
14
Photo 75 Thma
Photo 77 Thma
Photo 79
Photo 81 T
he activities of aterial for N1’s
he activities of aterial for N1’s
9 Adjust the lev
The shaping wo
shaping a new door jamb
shaping a new door jamb
vel of sandston
ork was contin
stone
stone
ne
nued
RSa
Photo
Photo 84 the
Photo 86
Photo 88
eport: April-Juambor Prei Ku
o 82 The activi
The activities material to div
The activities
The activities
une, 2012 uk Conservati
ities of shaping
of shaping andvide the pieces
to divide the p
to divide the p
ion Project
g
d drill
pieces
pieces
15
Photo 83 Tthe m
Photo 85 Ins
Photo
Photo
The activities omaterial to divi
serting the tool
o 87 The pieces
o 89 The pieces
of shaping and ide the piece
l to divide the p
s were divided
s after divided
drill
pieces
RSa
Photo 90 T
Photo 9me
Photo 9
Photo 9
eport: April-Juambor Prei Ku
The view of ex
2 Setting the geasurement ant
94 The central Tren
96 A pit of aroTre
une, 2012 uk Conservati
xcavation at J T
grid at J Trencht photography
pit in the middnch
ound the structunch
ion Project
Trench
h for
dle of J
ure in J
16
P
Phot
Photo 9m
Photo 95 A p
Photo 97 A lat
to 91 The view
93 The activitiemeasurement at
pit of around thTrench
erite drain locapart of J Trenc
w of J Trench
es of taking thet J Trench
he structure in J
ated at north-each
e
J
ast
RSa
Photo 98structure
Photo 10
Photo
eport: April-Juambor Prei Ku
8 The view of Iis considered a
00 The activitieTrenc
o 102 The activeastern
une, 2012 uk Conservati
I Trench, whicas gopura in fu
es of excavatioch
vities of excavaenclosure
ion Project
ch the unction
on at I
ation at
17
Photo 99 M
Photo 10south
Photo 103 A
Mr. Sophorn is elemen
1 The activitieh-east enclosure
part of eastern
checking the snt
s of excavatione of the group
n enclosure
stone
n at
RSa
Pho
Photo 1and dr
Photo 10
Photo 1
eport: April-Juambor Prei Ku
oto 104 The ele
106 The activitrawing plan of
08 A hand drilunder th
10 He is checkthe tr
une, 2012 uk Conservati
evation of enclo
ty of take measf the excavation
ll to check the she trench
king the soil fearench
ion Project
osure
surement n trench
soil layer
ature of
18
P
P
Photo 105 Thesouth-eas
Photo 107 The
P
Photo
e activities of est corner of enc
soil feature an
Photo 109 Soil
111 Soil of tre
excavation at closure
nd divided layer
ench
r
RSa
Photo
Photo 1
Photo 11
Photo
eport: April-Juambor Prei Ku
112 The activarti
114 The artifacexcav
16 The excavat
118 The excavKru
une, 2012 uk Conservati
vities of analysiifacts
cts were found vation
tion conduct by
vation trench nuke
ion Project
is of the
during
y MCFA
near O
19
P
P
Photo 113 Th
Photo 11
Photo 117 The
Photo 119 The
he activities of artifacts
15 The artifacts
excavation co
excavation co
f analysis of the
s recording
nduct by MCF
nduct by MCF
e
FA
FA
RSa
Photo
Phot
Photo 1
Photo 1
eport: April-Juambor Prei Ku
o 120 The activ
to 122 The acti
24 The structu
126 To study so
une, 2012 uk Conservati
vities of excav
ivities of excav
ure form as an e
oil feature by h
ion Project
ation
vation
enclosure
hand drill
20
Photo 121 T
Photo 123 A
Photo 125 T
Photo 127 The
The activities o
trench, which
They make a mdrawing a pla
e tool for excav
of excavation
found a structu
measurement toan
vation of MCF
ure
o
FA
RSa
Photoe
Photo
PhoIs
PhoIs
eport: April-Juambor Prei Ku
o 128 The MoTexcavation site
o 130 The excaMCFA has
oto 132 An GPsanapura by W
oto 134 An GPsanapura by W
une, 2012 uk Conservati
T and ADB vise made by MCF
vation trench ms filling back
S survey insideWaseda Universi
S survey insidWaseda Univers
ion Project
sited the FA
made by
e the ity
e the ity
21
Photo 129 Texcavat
Photo 131 Wefor the conce
Photo 133Isanapur
Photo 135Isanapur
The MoT and Ation site made b
e discussed withept design and
building
An GPS survera by Waseda U
An GPS survera by Waseda U
ADB visited theby MCFA
h ADB and Molocation of the
ey inside the University
ey inside the University
e
oT e