WEAVER WEAVER WEAVER WEAVER CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION MANAGEMENT, INC. MANAGEMENT, INC. MANAGEMENT, INC. MANAGEMENT, INC. 3679 S. Huron St., Suite 404 Englewood, CO 80110 Phone: (303) 789-4111 FAX: (303) 789-4310 S U B M I T S U B M I T S U B M I T S U B M I T T A L A L A L A L T R A N S M I T A L T R A N S M I T A L T R A N S M I T A L T R A N S M I T A L January 27, 2012 WGC WGC WGC WGC Submittal Submittal Submittal Submittal No: : : : 08 08 08 0871 71 71 710-00 00 00 002 PROJECT: Harold Thompson Harold Thompson Harold Thompson Harold Thompson Regional Regional Regional Regional WRF WRF WRF WRF (Includes 08 (Includes 08 (Includes 08 (Includes 0810 10 10 100) Birdsall Rd. Fountain, CO 80817 Job No. 2908 ENGINEER: GMS, Inc. GMS, Inc. GMS, Inc. GMS, Inc. 611 No. Weber St., #300 Colorado Springs, CO 80903 719-475-2935 Roger Sams OWNER: Lower Fountain Metropolitan Lower Fountain Metropolitan Lower Fountain Metropolitan Lower Fountain Metropolitan Sewage Disposal District Sewage Disposal District Sewage Disposal District Sewage Disposal District 901 S. Santa Fe Ave. Fountain, CO 80817 719-382-5303 James Heckman CONTRACTOR: Newco Door & Hardware, Inc. Newco Door & Hardware, Inc. Newco Door & Hardware, Inc. Newco Door & Hardware, Inc. 6606 E. 47 th Ave Denver, CO 80216 303-579-0558 [email protected] SUBJECT: Submittal for Hollow Metal Doors/Frames (08100) and for Finish Hardware (08710) at the Equipment & Maintenance Building SPEC SECTION: 15800 PREVIOUS SUBMISSION DATES: DEVIATIONS FROM SPEC: YES X NO CONTRACTOR’S STAMP: This submittal has been reviewed by Weaver General Construction and approved with respect to the means, methods, techniques, & safety precautions & programs incidental thereto. Weaver General Construction also warrants that this submittal complies with contracted documents and comprises on deviations thereto: Contractor’s Stamp: Engineer’s Stamp: Date: 1/27/12 Reviewed by: Chuck Berry ( ) Reviewed Without Comments (X) Reviewed With Comments ENGINEER’S COMMENTS:___________________________________________________________ ______________________________________________________________________

Upload: others

Post on 11-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the

WEAVER WEAVER WEAVER WEAVER CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTION MANAGEMENT, INC.MANAGEMENT, INC.MANAGEMENT, INC.MANAGEMENT, INC. 3679 S. Huron St., Suite 404 Englewood, CO 80110 Phone: (303) 789-4111 FAX: (303) 789-4310

S U B M I TS U B M I TS U B M I TS U B M I T TTTT A L A L A L A L T R A N S M I T A LT R A N S M I T A LT R A N S M I T A LT R A N S M I T A L

January 27, 2012

WGCWGCWGCWGC Submittal Submittal Submittal Submittal NNNNoooo: : : : 08080808717171710000----000000002222 PROJECT: Harold Thompson Harold Thompson Harold Thompson Harold Thompson Regional Regional Regional Regional WRFWRFWRFWRF (Includes 08(Includes 08(Includes 08(Includes 08101010100000))))

Birdsall Rd. Fountain, CO 80817 Job No. 2908

ENGINEER: GMS, Inc.GMS, Inc.GMS, Inc.GMS, Inc. 611 No. Weber St., #300 Colorado Springs, CO 80903 719-475-2935 Roger Sams

OWNER: Lower Fountain Metropolitan Lower Fountain Metropolitan Lower Fountain Metropolitan Lower Fountain Metropolitan Sewage Disposal DistrictSewage Disposal DistrictSewage Disposal DistrictSewage Disposal District 901 S. Santa Fe Ave. Fountain, CO 80817 719-382-5303 James Heckman

CONTRACTOR: Newco Door & Hardware, Inc.Newco Door & Hardware, Inc.Newco Door & Hardware, Inc.Newco Door & Hardware, Inc. 6606 E. 47

th Ave

Denver, CO 80216 303-579-0558 [email protected]

SUBJECT: Submittal for Hollow Metal Doors/Frames (08100) and for Finish Hardware (08710) at the Equipment & Maintenance Building SPEC SECTION: 15800 PREVIOUS SUBMISSION DATES: DEVIATIONS FROM SPEC: YES X NO

CONTRACTOR’S STAMP: This submittal has been reviewed by Weaver General Construction and approved with

respect to the means, methods, techniques, & safety precautions & programs incidental thereto. Weaver General Construction also warrants that this submittal complies with contracted documents and comprises on deviations

thereto:

Contractor’s Stamp: Engineer’s Stamp: Date: 1/27/12 Reviewed by: Chuck Berry ( ) Reviewed Without Comments (XXXX) Reviewed With Comments ENGINEER’S COMMENTS:_________________________________________________________________________________________________________________________________

Page 2: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the

Project: HDTWRF

Location: Fountain, CO

Supplier: Newco Door and Hardware, LLC

Date: 1/27/12

Submittal No: 08710-002 (Includes Section 08100)

WCM Submittal Review Comments:

1. Paragraph 2.1, A, 1. calls for heavy weight hinges and in 2.1, A, 4. calls for Hager BB1199

hinges. Hager BB1199 hinges are Standard Weight per the Hager product data.

2. On page 3 of the hardware schedule portion of the submittal, the supplier has several

questions for the architect.

3. There are several items in part 2 of the hardware specifications referred to by manufacturer

name and model number or equivalent. The supplier has submitted an equivalent on several

of the items.

4. Metal building shop drawing review will have to include girt elevations relative to the exterior

door frame head elevations.

5. Door supplier has submitted Pioneer as an equivalent to the spec listed manufacturers of

doors and frames.

6. On the Newco door elevation drawings for doors EM1, EM2 and EM3, is the vision lite toward

the hinge side or the latch side of the door? The Pioneer door elevation NG, which seems to

be most similar to the contract drawing type A, shows the lite toward the latch side. The

project contract drawings require the lite to be toward the hinge side.

Page 3: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 4: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 5: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 6: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 7: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 8: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 9: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 10: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 11: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 12: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 13: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 14: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 15: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 16: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 17: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 18: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 19: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 20: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 21: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 22: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 23: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 24: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 25: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 26: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 27: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 28: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 29: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 30: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 31: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 32: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 33: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 34: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 35: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 36: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 37: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 38: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 39: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 40: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 41: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 42: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the
Page 43: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the

Newco Door & Hardware, LLCNewco Door & Hardware, LLCNewco Door & Hardware, LLCNewco Door & Hardware, LLC., ., ., ., EEEE----mail: [email protected] mail: [email protected] mail: [email protected] mail: [email protected] 6606 East 476606 East 476606 East 476606 East 47thththth Avenue P: 303.576.0558 F: 303.576.0565 Avenue P: 303.576.0558 F: 303.576.0565 Avenue P: 303.576.0558 F: 303.576.0565 Avenue P: 303.576.0558 F: 303.576.0565 Denver, Co. 80216 Denver, Co. 80216 Denver, Co. 80216 Denver, Co. 80216 Cell Phone: 303.903.3947 Cell Phone: 303.903.3947 Cell Phone: 303.903.3947 Cell Phone: 303.903.3947

Project:

Harold D. Thompson

Regional Water Reclamation Facility

Lower Fountain Metropoloitan Sewage Disposal District

Equipment, Maintenance and Storage Building

Architect:

GMS, Inc.

Consulting Engineers

611 N. Weber, Suite 300

Colorado Springs, Colorado 80903

Phone: Fax:

Contractor:

Weaver Construction, Management, Inc.

3679 South Huron Street, Suite 404

Englewood, Colorado 80110

Phone: 303.789.4111 Fax: 303.789.4310

Prepared By: Rick L. Bradley

Lptp

Date: January 12, 2012

Revision Date:

Job Number: NC1199

Manufacturers:

Cal Royal - Hinge Pin Stops, Latch guards

Hager - Hinges, Kick plates, Passage, Privacy

Ives - Stops

Pioneer - Hollow Meal Doors & Frames

Precision - Exit Devices

Reese - Sweeps, Thresholds, Weather stripping

Stanley - Closers

Page 1

Page 44: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the

In order to better service our customers we require the following information be provided and returned with the

approved submittals.

Project Manager: ______________________________________________________________________

Office / Cell Phone Number: __________________________________ Fax: _______________________

Email Address: ________________________________________________________________________

Superintendent: ________________________________________________________________________

Office / Cell Phone Number: __________________________________ Fax: _______________________

Email Address: ________________________________________________________________________

Dates Required:

1) Hollow Metal Door Frames: ___________________________________________________________

2) Hollow Metal Borrowed Lite Frames: ___________________________________________________

3) Hollow Metal Doors: ________________________________________________________________

4) Timely Steel Frames: ________________________________________________________________

5) Aluminum Frames: __________________________________________________________________

6) Wood Doors: _______________________________________________________________________

*Pre finished wood doors - Sample(s) to be provided by the General Contractor or his agent.

7) Finish Hardware: ____________________________________________________________________

8) Miscellaneous: _____________________________________________________________________

9) If we are to provide the keying for this project, please provide us with the following contact information

Name of the contact: ______________________________ Phone #: ______________________________

Fax #: __________________________________ Email Address: _________________________________

Please have this signed and returned with the submittals. We will not proceed with fabrication, or purchasing of

this project until the above information has been provided.

Failure to provide this information could result in additional lead times and costs.

Signed by: ________________________________________ Date: ______________________________

Page 2

Page 45: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the

Job Note(s):

1) To comply with ADA requirements vision lites cannot exceed 42” above the finish floor to the bottom of the vision lite.

Please verify location of vision lites in all doors with lites.

Architect please advise.

2) Hardware set E. opening D-EM8, has an exit device specified with no outside trim. Is this correct/

Architect please advise.

3) Hardware set E.1. opening D-EM12, has an exit device specified with no outside trim. The door swings into the mechanical

room, with no apparent means to egress from that room.

1) Please verify that the door is to swing into the room, or should it swing out?

2) Please verify that the exit is a correct application.

3) If it is a correct application, should there be an outside trim to get out of the mechanical room?

Architect please advise.

4) Hardware set F, openings E-M9 and E-M10, have passage sets specified. Please verify that this is correct. Should these be

storeroom locksets?

Architect please advise.

5) Hardware set G, opening E-M11, has a passage set specified. I believe this should be a privacy set.

Architect please advise.

6) Exterior elevations show all jambs are to have 4” heads. The legend on sheet EM-2 show exterior walls to have 6” studs and

wall detail 3 on sheet EM-3 shows the frame butting up in the opening, and does not wrap the walls. What type of anchors

do you require in order to install the frames?

Architect please advise.

7) Interior wall legend shows interior walls to be 4 ¾”. Please verify that 5 ¾” frames are correct for the interior walls and

verify what type of anchors are required to install these frames.

Architect / contractor please advise.

8) All doors with sweeps - sweeps show 3/8” vinyl and the thresholds specified are ½”. We suggest using either a ¼” threshold,

or changing the sweep to a surface applied, to allow enough clearance between the threshold and the sweep.

Architect please advise.

9) The Sparta lever specified is not available with the Kaba Ilco mechanical push button locksets. In order to keep the lever

design consistent, may we change the lever design to the Rhodes lever design?

Architect please advise.

Page 3

Page 46: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the

Abbreviations

Abbreviation(s) For Hollow Metal Doors and Frames:

86 - Mortise Lock Prep

161 - Cylindrical Lock Prep

453 - 3 Each 4.5” X 4.5” Hinges

CYL - Cylindrical

CYLS - Cylinders

H453 - 3 Each Heavy Weight 4.5” X 4.5” Hinges

FBW - Fully Back Welded

FWC - Full Width Cloer Reinforcement

FWH - Full Width Hinge Reinforcement

LH - Left Hand

LHR - Left Hand Reverse

MRTS - Mortise

PA - Parallel Arm Closer Reinforcement

REG - Regular Arm Closer Reinforcement

RH - Right Hand

RHR - Right Hand Reverse

RESR - Rim Exit Strike Reinforcement

SNB - Sex Nuts and Bolts

SSR - Special Strike Reinforcement

TB - Thru Bolt(s)

UC - Uner Cut

WGS - Welded Ground Smooth

Abbreviation(s) For Wood Doors:

86 - Mortise Lock Prep

161 - Cylindrical Lock Prep

B1E - Bevel 1 Edge (Leading Edge)

B2E - Bevel Both Edges

CYL - Cylindrical

CYLS - Cylinders

H453 - 3 Each Heavy Weight 4.5” X 4.5” Hinges

HC - Hollow Core

LH - Left Hand

LHR - Left Hand Reverse

MPLE - Maple

MRTS - Mortise

MVE - Matching Vertical Edge

PSRO - Plain Slice Red Oak

RH - Right Hand

RHR - Right Hand Reverse

RCB - Rotary Cut Birch

SC - Solid Core

SNB - Sex Nuts and Bolts

SWE - Soft Wood Edges

TB - Thru Bolts

UC - Under Cut

Page 4

Page 47: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the

Hw Set A

Opng/Tag Location Handing

D-EM2 Exterior from Vehicle Bays Right Hand Reverse

D-EM3 Exterior from Vehicle Bays Left Hand Reverse

Pioneer Hmf 2 - 3070 5 ¾” 4” hd. 14ga. gal. welded hollow metal frames - Type a

prep for H453 hinges, asa strike, parallel arm closer reinforcement

Pioneer Hmd 2 - 3070 1 ¾” flush 16ga. gal. hollow metal doors - Type a

prep H453 hinges, 161 cylindrical lockset, standard under cut, seamless edge

vision lite cut out 6” x 27” located 15” down and 8” in

Nation Guard VL Kits 2 - L-FRA 100 6” X 27” for use with ¼” glass provide by others

Mfr Qty Subtype Item Description

Hager 6 Butts BB1199 4.5 X 4.5 US32D nrp

Simplex 1 Mech. Combo Lock LL1021S 2 ¾ x ASA x US26D LH

Simplex 1 Mech. Combo Lock LR1021S 2 ¾ x ASA x US26D RH

Schlage 2 I/C Cores 23-030 626

Stanley 2 Closer D4551 SRI Hold Open x snb 689

Ives 2 Floor Stop FS448 626

Hager 2 Kick plate .050 10” x 34” 630

Reese 2 Threshold S426A 36”

Reese 2 Weather stripping 678A 1/36” x 2/84

Reese 2 Sweep DB594AF 36”

Cal Royal 2 Latch guards GJLPG2 US26D .

Hw Set B

Opng/Tag Location Handing

D-EM13 Exterior from Electrical Room Left Hand Reverse

Pioneer Hmf 1 - 3070 5 ¾” 4” hd. 14ga. gal. welded hollow metal frames - Type a

prep for H453 hinges, rim exit strike reinforcement, parallel arm closer reinforcement

Pioneer Hmd 1 - 3070 1 ¾” flush 16ga. gal. hollow metal doors - Type a

Prep H453 hinges, 161 cylindrical lockset, standard under cut, seamless edge

vision lite cut out 6” x 27” located 15” down and 8” in

Nation Guard VL Kits 1 - L-FRA 100 6” X 27” for use with ¼” glass provide by others

Mfr Qty Subtype Item Description

Hager 3 Butts BB1199 4.5 X 4.5 US32D nrp

Stanley 1 Rim Exit 2103 x snb US32D LHR

Simplex 1 Mech. Combo Lock LP1021S 2 ¾ x ASA x US26D LHR

Schlage 1 I/C Cores 23-030 626

Stanley 1 Closer D4551 SRI Hold Open x snb 689

Ives 1 Floor Stop FS448 626

Hager 1 Kick plate .050 10” x 34” 630

Reese 1 Threshold S426A 36”

Reese 1 Weather stripping 678A 1/36” x 2/84

Reese 1 Sweep DB594AF 36”

Cal Royal 1 Latch guards GJLPG2 US26D .

Page 5

Page 48: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the

Hw Set D

Opng/Tag Location Handing

D-EM1 Exterior from Electrical Room Right Hand Reverse Active

Pioneer Hmf 1 - 5080 5 ¾” 4” hd. 14ga. gal. welded hollow metal frames - Type a

prep for H454 hinge legs, flush bolt strike, parallel arm closer reinforcement RHR LF only

Pioneer Hmd 1 - 2680 1 ¾” flush 16ga. gal. hollow metal doors - Type a - RHRA

prep 454 hinges, 161 cylindrical lockset w/blank latch bolt edge, standard under cut

vision lite cut out 6” x 27” located 27” down and 8” in

Seamless welded edges, astragal mounted to outside edge of active leaf

Nation Guard VL Kits 1 - L-FRA 100 6” X 27” for use with ¼” glass provide by others

Pioneer Hmd 1 - 2680 1 ¾” flush 16ga. gal. hollow metal doors - Type a - LHR Inactive

prep H454 hinges, manual flush bolts, surface mounted rim exit strike, standard under cut

Seamless welded edges

Mfr Qty Subtype Item Description

Hager 8 Butts BB1199 4.5 X 4.5 US32D nrp

Hager 2 Manual Flush bolts 282D 12” 626

Hager 1 Dust Proof Strike 280X 626

Stanley 1 Rim Exit 2103 x snb US32D RHR 30”

Simplex 1 Mech. Combo Lock LP1021S 2 ¾ x ASA x US26D RHR

Schlage 1 I/C Cores 23-030 626

Stanley 1 Closer D4551 SRI hold open x snb 689

Ives 2 Floor Stop FS446 626 LHR Lf

Hager 2 Kick plate .050 10” x 28” 630

Reese 1 Threshold S426A 60”

Reese 1 Weather stripping 678A 1/60” x 2/96

Reese 1 Sweep DB594AF 30”

Reese 1 Astragal 357SP 96” x 797B 96” .

Page 6

Page 49: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the

Hw Set E

Opng/Tag Location Handing

D-EM8 Vehicle Bays from Electrical Room Left Hand Reverse

Pioneer Hmf 1 - 3070 5 ¾” 14ga. gal. welded hollow metal frames - 1 hour - Type f

prep for H453 hinges, ASA strike, parallel arm closer reinforcement

Pioneer Hmd 1 - 3070 1 ¾” flush 16ga. gal. hollow metal doors - 1 hour - Type f

prep H453 hinges, 161 cylindrical lockset, standard under cut

vision lite cut out 12” x 12” located 30” down and centered

Seamless welded edges

Nation Guard VL Kits 1 - L-FRA 100 12” X 12” for use with ¼” glass provide by others

Mfr Qty Subtype Item Description

Hager 3 Butts BB1199 4.5 X 4.5 US32D

Stanley 1 Rim Exit F2103 x snb US32D LHR

Stanley 1 Closer D4551 SRI pa x snb 689

Cal Royal 1 Hinge Pin Stop IVHP23 626

Hager 1 Kick plate .050 10” x 34” 630

Reese 1 Threshold S426A 36”

Reese 1 Weather stripping 678A 1/36” x 2/84

Reese 1 Sweep DB594AF 36” .

Hw Set E.1

Opng/Tag Location Handing

D-EM12 Vehicle Bays to Mechanical Room Left Hand (RHR)

Pioneer Hmf 1 - 3670 5 ¾” 14ga. gal. welded hollow metal frames - 1 hour - Type f

prep for H453 hinges, ASA strike, parallel arm closer reinforcement

Pioneer Hmd 1 - 3670 1 ¾” flush 16ga. gal. hollow metal doors - 1 hour - Type f

prep H453 hinges, 161 cylindrical lockset, standard under cut

vision lite cut out 12” x 12” located 30” down and centered

Seamless welded edges

Nation Guard VL Kits 1 - L-FRA 100 12” X 12” for use with ¼” glass provide by others

Mfr Qty Subtype Item Description

Hager 3 Butts BB1199 4.5 X 4.5 US32D

Stanley 1 Rim Exit F2103 x snb US32D RHR 42”

Stanley 1 Closer D4551 SRI reg x snb 689

Cal Royal 1 Hinge Pin Stop IVHP23 626

Hager 1 Kick plate .050 10” x 40” 630

Reese 1 Threshold S426A 42”

Reese 1 Weather stripping 678A 1/42” x 2/84

Reese 1 Sweep DB594AF 42” .

Page 7

Page 50: S U B M I TS U B M I T TTTT A L A L A L T R A N S M I T A ... Submittals...2. On page 3 of the hardware schedule portion of the submittal, the supplier has several questions for the

Hw Set F

Opng/Tag Location Handing

D-EM9 Vehicle Bays to Storage Left Hand

D-EM10 Vehicle Bays to Heated Storage Room Right Hand

Pioneer Hmf 2 - 3070 5 ¾” 14ga. gal. welded hollow metal frames - Type e

prep for H453 hinges, ASA strike, regular arm closer reinforcement

Pioneer Hmd 2 - 3070 1 ¾” flush 16ga. gal. hollow metal doors - Type e

prep H453 hinges, 161 cylindrical lockset, standard under cut

vision lite cut out 12” x 12” located 30” down and centered

Seamless welded edges

Nation Guard VL Kits 2 - L-FRA 100 12” X 12” for use with ¼” glass provide by others

Mfr Qty Subtype Item Description

Hager 6 Butts BB1199 4.5 X 4.5 US32D

Hager 2 Passage Set 3410 Archer 2 ¾ asa us26d

Stanley 2 Closer D4551 SRI Reg x snb 689

Cal Royal 2 Hinge Pin Stop IVHP23 626

Hager 2 Kick plate .050 10” x 34” 630

Reese 2 Weather stripping 678A 1/36” x 2/84

Reese 2 Sweep DB594AF 36” .

Hw Set G

Opng/Tag Location Handing

D-EM11 Vehicle Bays fr Toilet Room Right Hand Reverse

Pioneer Hmf 1 - 3070 5 ¾” 14ga. gal. welded hollow metal frames - Type c

prep for H453 hinges, ASA strike, parallel arm closer reinforcement

Pioneer Hmd 1 - 3070 1 ¾” flush 16ga. gal. hollow metal doors - Type c

prep H453 hinges, 161 cylindrical lockset, standard under cut

Seamless welded edges

Mfr Qty Subtype Item Description

Hager 3 Butts BB1199 4.5 X 4.5 US32D

Hager 1 Passage Set 3440 Archer 2 ¾ asa US26D

Stanley 1 Closer D4551 SRI x snb 689

Cal Royal 1 Hinge Pin Stop IVHP23 626

Hager 1 Kick plate .050 10” x 34” 630

Reese 1 Weather stripping 678A 1/36” x 2/84

Reese 1 Sweep DB594AF 36” .