request for quotation -...

5
Republic of the Philippines Department of Finance Bureau of Customs 1099 Manila REQUEST FOR QUOTATION The Bureau of Customs (BOC), through its Administration Office (AO), will undertake a Small Value Procurement for the Renovation of Common Comfort Rooms at OCOM Building, in accordance with the Revised Implementing Rules and Regulations of Republic Act No. 9184. The details of the project are as follows: Name of Project Renovation of Common Comfort Rooms at OCOM Building Location OCOM Bldg., South Harbor, Gate 3, Port Area, Manila Approved Budget for the Contract Three Hundred and Twenty Thousand Pesos (P 320,000.00) inclusive of tax QTY. SCOPE OF WORKS 1 lot 1. Male and Female Common Comfort Room 1. Replacement of floor and wall tiles. Use 60 x 60 cm floor tiles and 30 x 60 cm wall tiles (SOL tiles or approved equivalent). 2. Replacement of ceiling, electrical wirings and lightings. Submit sample of lighting fixture. 3. Replacement of plumbing fixtures and accessories (water closet with sloan valve, lavatory, bidet and faucets). Submit brochures and samples for approval. - 4. Replacement of lavatory counter top with granite slab. Submit sample of granite. 5. Replacement of vanity mirror. 6. Replacement of partition doors and main door. Use modular partition door and solid wood for main door or approved equivalent 7. Rehabilitation of window and relocation of exhaust fan. 8. See plans and drawings for specifications. 9. Painting works. Duration: Sixty (60) calendar days upon signing of Purchase Order Interested suppliers are required to submit their valid and current Mayor's Permit, PHILGEPS Registration Certificate and DTI / SEC Registration, Bill of Quantity / Detailed Estimate and duly signed price quotation form (Annex "A''). Submission of quotation and eligibility documents is on or before July 15, 2015 10:00 a.m. at General Services Division (GSD), Ground Floor, OCOM Building, South Harbor, Gate 3, Port Area, Manila. Award of contract shall be made to the lowest quotation, which complies with the minimum description as stated above and other terms and conditions stated in the price quotation form. Any interlineations, erasures or overwriting shall be valid only if they are signed or initialled by the bidder or his/her duly authorized representative/so The BOC reserves the right to accept or reject any or all quotations and to impose additional terms and conditions as it may deem proper. For inquiry, you may contact us at telefax no. 527-4519. Very truly yours,

Upload: vannguyet

Post on 27-Mar-2018

218 views

Category:

Documents


3 download

TRANSCRIPT

Republic of the PhilippinesDepartment of Finance

Bureau of Customs1099 Manila

REQUEST FOR QUOTATION

The Bureau of Customs (BOC), through its Administration Office (AO), will undertake a Small ValueProcurement for the Renovation of Common Comfort Rooms at OCOM Building, in accordance with theRevised Implementing Rules and Regulations of Republic Act No. 9184. The details of the project are asfollows:

Name of Project Renovation of Common Comfort Rooms at OCOMBuilding

Location OCOM Bldg., South Harbor, Gate 3, Port Area, Manila

Approved Budget for the Contract Three Hundred and Twenty Thousand Pesos(P 320,000.00) inclusive of tax

QTY. SCOPE OF WORKS1 lot 1. Male and Female Common Comfort Room

1. Replacement of floor and wall tiles. Use 60 x 60 cm floor tiles and30 x 60 cm wall tiles (SOL tiles or approved equivalent).

2. Replacement of ceiling, electrical wirings and lightings.Submit sample of lighting fixture.

3. Replacement of plumbing fixtures and accessories (water closet withsloan valve, lavatory, bidet and faucets). Submit brochures and samplesfor approval. -

4. Replacement of lavatory counter top with granite slab. Submit sample ofgranite.

5. Replacement of vanity mirror.6. Replacement of partition doors and main door. Use modular partition door

and solid wood for main door or approved equivalent7. Rehabilitation of window and relocation of exhaust fan.8. See plans and drawings for specifications.9. Painting works.

Duration: Sixty (60) calendar days upon signing of Purchase Order

Interested suppliers are required to submit their valid and current Mayor's Permit, PHILGEPS RegistrationCertificate and DTI / SEC Registration, Bill of Quantity / Detailed Estimate and duly signed price quotationform (Annex "A'').

Submission of quotation and eligibility documents is on or before July 15, 2015 10:00 a.m. at GeneralServices Division (GSD), Ground Floor, OCOM Building, South Harbor, Gate 3, Port Area, Manila.

Award of contract shall be made to the lowest quotation, which complies with the minimum descriptionas stated above and other terms and conditions stated in the price quotation form.

Any interlineations, erasures or overwriting shall be valid only if they are signed or initialled by the bidderor his/her duly authorized representative/so

The BOC reserves the right to accept or reject any or all quotations and to impose additional terms andconditions as it may deem proper.

For inquiry, you may contact us at telefax no. 527-4519.

Very truly yours,

Q FOR QUOTATION

), through its Administration Office (AO), will undertake a Small Value~lOVCrti°on of Common Comfort Rooms at OCOM Building, in accordance with the

:.;::::::r..er.5Ilg les and Regulations of Republic Act No. 9184. The details of the project are as

Renovation of Common Comfort Rooms at OCOMBuilding

Interested suppliers are required to submit their valid and current Mayor's Permit, PHILGEPS RegistrationCertificate and DTI / SEC Registration, Bill of Quantity / Detailed Estimate and duly signed price quotationform (Annex "A").

OCOM Bldg., South Harbor, Gate 3, Port Area, Manila

Submission of quotation and eligibility documents is on or before July 15, 2015 10:00 a.m. at GeneralServices Division (GSD), Ground Floor, OCOM Building, South Harbor, Gate 3, Port Area, Manila.

A.:>i:H"UIfe<l B dge for the Contract Three Hundred and Twenty Thousand Pesos(P 320,000.00) inclusive of tax

Award of contract shall be made to the lowest quotation, which complies with the minimum descriptionas stated above and other terms and conditions stated in the price quotation form.

SCOPE OF WORKS

Any interlineations, erasures or overwriting shall be valid only if they are signed or initialled by the bidderor his/her duly authorized representative/so

Comfort Room~)(ac:ement 0 00 a wall tiles. Use 60 x 60 cm floor tiles and

11 iles (SOL iles or approved equivalent).cement 0 ceiling, electrical wirings and lightings.

SUbmit sam le of lighting fixture.3. Replacement of plumbing fixtures and accessories (water closet with

sloan valve, lavatory, bidet and faucets). Submit brochures and samplesfor approval.

4. Replacement of lavatory counter top with granite slab. Submit sample ofgranite.

5. Replacement of vanity mirror.6. Replacement of partition doors and main door. Use modular partition door

and solid wood for main door or approved equivalent.7. Rehabilitation of window and relocation of exhaust fan.8. See plans and drawings for specifications.9. Painting works.

The BOC reserves the right to accept or reject any or all quotations and to impose additional terms andconditions as it may deem proper.

Duration: Sixty (60) calendar days upon signing of Purchase Order

For inquiry, you may contact us at telefax no. 527-4519.

Very truly ;ours'f). s:O. LElOSor, Admin ration Office

PRICE QUOTATION FORM

k:;.;rJrUstJrati" on Offi ceoms

r anila

After having carefully read and accepted the terms and conditions in the Request for Quotation,h der l tation/s for the it fllereun er ISour quo a Ion s or e I ems as 0 ows:

Qty. SCOPE OF WORKS Unit TotalPrice Price

1 lot I. Male and Female Common Comfort Room1. Replacement of floor and wall tiles. Use 60 x 60 cm floor tiles

and 30 x 60 cm wall tiles (SOL tiles or approved equivalent).2. Replacement of ceiling, electrical wirings and lightings.

Submit sample of lighting fixture.3. Replacement of plumbing fixtures and accessories (water

closet with sloan valve, lavatory, bidet and faucets). Submitbrochures and samples for approval.

4. Replacement of lavatory counter top with granite slab.Submit sample of granite.

5. Replacement of vanity mirror.6. Replacement of partition doors and main door. Use modular

partition door and solid wood for main door or approvedequivalent.

7. Rehabilitation of window and relocation of exhaust fan.8. See plans and drawings for specifications.9. Painting works.

TOTAL (Amount in Figures)

Total amount in words: _

One year warranty on defects from issuance of certificate of completion and acceptance.

The above-quoted prices are inclusive of all costs and applicable taxes.

Very truly yours,

Name / Signature of Representative

Name of Company

Mayor's Permit No. _DTI or SEC Registration Certificate No. _PhilGEPS Registration No. _PCAS License (Small A minimum requirement) _(Please submit the photocopies of the above documents uoon submission of nuorarion)

--

w:::cI-

~..-.I(f)

C)I-O::::zlO-wo1-0::::.-.1(f) l..I....

X -w~~Zl-(f)--1-.-.1j:::::o::::.-.Iw««0::::0....3:

:z:~Z;;;

0::::oo.-.Iu;

0::::ooo

WC)Uz:5C)0....ZW «0:::: :::c

><

-- wU:50....LW0::::

u....JU 0:::::500....0::::wO::::0:::: ~

<=>.- ,r» .--x

1-1~W ss--I z:-oz;· l ct 0I-

ZwO00

'-0'-0 . -..l~· 00<{~

~O~UZ:eCV)

0 '-0 00·C'0 N LLU w. .-- -'~ <0 -c

UV')

C'0I"'-.. l().0 .--·.--

OS·lOv·l

OL·Z;

BUREAU OF CUSTOMSOFFICE OF COMMISSIONER

BLOG.

71Tl.£:CLiENT:NomORAv"NGS AND SPECIRCAnoNS DULYSTAMPEO OR SEALED AS INSTRUMENTOF SERVICE ARE THE PROPERTIES ANDOOCUMOHS OF THE ARCHITECT. YfHETHERTHE OBJECT YttiICH THEY ARE t.CAOE ISEXECUTED OR NOT. IT SHALL 8E UNlAY5'ULFOR ANY PERSON, WITHOUT THE WRITIENCONSENT Of THE ARCHITECT OR AUTHOROF SAID DOCUMENTS TO DUPUCA TE OR TOMAKE COPIES OF SAID DOCUMENTS FOR USEIN THE REPETITION OF AND FOR OTHERPRD.£CTS OR BUILDING. All.. DRAWINGS ARETO BE RETURNEO WHEN NO LONGER IN USE,

LOCA71ON:

BUREAU OF CUSTOMS PORT OF

DRA'ItN BY:

DATE:

n0411l1'i

w:cif) I-W.-.J if)- >- w

:z: I- 0:::: --.J- 0 C)I-

~0::::0 ~ :z:1x 0

~

-w Z1-0::::

I~ --.J if) ::;;!...L- X -. I if) wZ WWw LL.J Lw 0 U 0::::Uo:::: ZI-if)5=:> U U 505 5 «I---.J0.-. I- t:J0::::.-.J 0...0::::wX 0... 0.-. «« wO::::0:::: !...L- W w 0::::0.-.35: 0:::: ::::2:0:::: 0::::

0.--..------M-

I I 06·0

~

L.l)0-1 L.l)co .. .--.--

L.l) -~('f) 0- ). "~ 0 /

" ~~ ". ..-- .--'"

)

"" .r-.. I~ ~-m1

86·0 or (;8·0 or S' r l

S'6·(;

-~•.... 1°0w '£\.:)......• .:.:.::::..

o•••••

Zow:E~:E«0~Us:E00~U ~«0 ~

C/.J£NT: DRAWN BY:

BUREAU-OF-COS-nY~r5 ~09SI OFFICE OF COMMISSIONER ICOMMON TOILETBLDG. DATE:

LOCATlCNV:

NomORAW,NGS AND SPECIFICATIONS DULYST AMPEO OR SEALED AS INSTRUMENTOF SERVlCE ARE THE PROPERTIES ANDDOCUMENTS OF THE ARCHITECT, \liHETHERTHE OBJECT WHICH THEY ARE /,jADE ISEXECUTED OR NOT, IT SHALL BE UNlA'nf1JLFOR ANY PERSON, WITHOUT THE ~ITTENCONSENT OF THE ARCHITECT OR AUTHOROF SAID DOCUMENTS 10 DUPUCA TE OR TOMAKE COPIES OF SAID DOCUI.lENTS FOR USEIN THE REPETITION OF AND FOR OTI-iERPROJECTS OR BUILDING. ALL DRAVr\NGS ARETO BE RElURNED \\liEN NO LONGER IN Us£'

R••• 1>46 SEC. 25(4)

BUREAU OF CUSTOMS PORTOFMANILA

TITLE:

061915