NERSA Hearing2nd March 2012

Red Cap Kouga Wind Farm

NERSA Hearings

Port Elizabeth

2nd of March 2012

NERSA Hearing2nd March 2012

NERSA Hearing2nd March 2012

Why Wind Power?

NERSA Hearing2nd March 2012

LOCAL ELECTRICITY DEMAND – NELSON MANDELA BAY

NERSA Hearing2nd March 2012

WIND AND WATER

NERSA Hearing2nd March 2012

NERSA Hearing2nd March 2012

Kouga Wind Farm Overview

NERSA Hearing2nd March 2012

NERSA Hearing2nd March 2012

KOUGA WIND FARM OVERVIEW

• 32 Turbines

• 80 MW

• Nordex 2.5 MW N90 turbines

• Hub height of 80m

• Wind farm area 2,948 Hectares

• Actual footprint 28 Hectares

Total Area

Transformed AreaNERSA Hearing2nd March 2012

WHO WE ARE

Africoast Company Profile_Jan2010.doc Afri-Coast Engineers

COMPANY PROFILE

2010

Afri-Coast Engineers SA (Pty) Ltd PO Box 5104 Walmer 6065 Port Elizabeth South Africa Physical Address:

Afri-Coast House C/o Rose & Havelock Streets Central Port Elizabeth Contact details:

Tel: +27 41 505 8000 Fax: +27 41 585 3437 Email: [email protected] URL: www.africoast.com Contact: Venance da Silva ([email protected])

Donald McGillivray ([email protected]) Tsepang Setipa ([email protected]) Dup van Renen ([email protected])

MEMBER COMPANY OF THE SOUTH AFRICAN ASSOCIATION OF CONSULTING ENGINEERS, AFFILIATED TO THE INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS

RED CAP KOUGA COMMUNITY DEVELOPMENT TRUST

Red Cap Kouga Wind

Farm

BBBEE Holdco

74%

26%

Broad based Community Trust

100% of

Ordinary

Shares

Dividends

Pref Shares

100%

Trickle

Dividend

up to 25%

Pref Shares

Redemption up

to 75%

NERSA Hearing2nd March 2012

Construction start - July 2012

Commercial Operation - 2nd quarter 2014

NERSA Hearing2nd March 2012

NERSA Hearing2nd March 2012

RISK MITIGATION

• Fully wrapped EPC contract

• O&M of 10 years

NERSA Hearing2nd March 2012

CONCLUSSION

MWs

Prudent risk mitigation

Significant community benefit

Proudly South African

NERSA Hearing2nd March 2012

Thank you

Mark Tanton

info@red-

cap.co.za