Page 1: RECORD NOTES OF THE MEETING ON SCHEDULING AND · SPPD Description Status Yes / No Remarks SPD1 SPD2 SPPD SPD /SPPD : CHECK LIST FOR SCHEDULING S.No. Verification Check List SPD ANNEXURE
Page 2: RECORD NOTES OF THE MEETING ON SCHEDULING AND · SPPD Description Status Yes / No Remarks SPD1 SPD2 SPPD SPD /SPPD : CHECK LIST FOR SCHEDULING S.No. Verification Check List SPD ANNEXURE
Page 3: RECORD NOTES OF THE MEETING ON SCHEDULING AND · SPPD Description Status Yes / No Remarks SPD1 SPD2 SPPD SPD /SPPD : CHECK LIST FOR SCHEDULING S.No. Verification Check List SPD ANNEXURE

RECORD NOTES OF THE MEETING ON SCHEDULING AND

KHAN
Rectangle
Page 4: RECORD NOTES OF THE MEETING ON SCHEDULING AND · SPPD Description Status Yes / No Remarks SPD1 SPD2 SPPD SPD /SPPD : CHECK LIST FOR SCHEDULING S.No. Verification Check List SPD ANNEXURE

Annexure-1(1/2)

Page 5: RECORD NOTES OF THE MEETING ON SCHEDULING AND · SPPD Description Status Yes / No Remarks SPD1 SPD2 SPPD SPD /SPPD : CHECK LIST FOR SCHEDULING S.No. Verification Check List SPD ANNEXURE

Annexure-1(2/2)

Page 6: RECORD NOTES OF THE MEETING ON SCHEDULING AND · SPPD Description Status Yes / No Remarks SPD1 SPD2 SPPD SPD /SPPD : CHECK LIST FOR SCHEDULING S.No. Verification Check List SPD ANNEXURE

SPPD

Description Status Yes /

No

Remarks SPD1 SPD2 SPPD

1

Register with SRLDC as User ( Entity )

Yes / No Appendix - IV ( Fees & Charges

of RLDC , CERC Regulations ,

2015

2as per CERC , RE Framework Sch. & forcasting : Annexure - I

Yes / No Annexure - I ( Technical Data )

3

SLD : Visible ( PDF )

Yes / No Complete Project w.r .t

Metering , Protection , Scheme

, etc.

4Notarized copy of PPAs w. r .t connectivity with SPPD

Yes / No

5

Forecast and Schedule Data to be submitted by Wind/Solar

plants/ Lead generator, Principal generator , ( Annexure - II )

Yes / No Annexure - II ( forecast Data )

6 Real Time Avilabiltiy ( Annexure -III ) Yes / No Annexure - III

7generation data ( Annexure - IV )

Yes / No Annexure - IV

8ABT compliant meters at inter - connection points ( ABT

compliant meters shall have provision of automatic meter

reading technology for data transfer to SRLDC )

Yes / No

8.1

SEM Sample Data : NPC (Text file ) , for L&T : DAT , Secure :

MRI ….

Yes / No

8.2 Make of meter / Meter Sl. No. / CT & VT Ratio Yes / No

8.3 Time drift statement Yes / No

9 Notarized copy of PPA RATES on Affidavit TO SRPC for DSM

Preparation

Yes / No Affidavit

10 shall be responsible for sending the SCADA data to the RLDC

and to the Renewable Energy management Center , as and

when required.

Yes / No

11Undertaking by Licensee / Generating Company

Yes / No

11.1Shall be responsible for ensuring metering ( ABT compliant

meter ) , data collection and weekly transmission of data ( in

SRLDC data format ) to SRLDC as per IEGC and extant CERC

Regulations

Yes / No

11.2

Shall under take commercial settlement of all deviation

settlement charges to the Regional Pool Account on Weekly

basis , as per applicable CERC Regulations

Yes / No

11.3

Shall be responsible for commercial settlement on scheduled

generation with it beneficiaries as per the monthly Regional

Energy Account (REA ) issued by SRPC .

Yes / No

SPD /SPPD : CHECK LIST FOR SCHEDULING

S.No. SPD Verification Check List

ANNEXURE 2

Page 7: RECORD NOTES OF THE MEETING ON SCHEDULING AND · SPPD Description Status Yes / No Remarks SPD1 SPD2 SPPD SPD /SPPD : CHECK LIST FOR SCHEDULING S.No. Verification Check List SPD ANNEXURE

SPPD

Description Status Yes /

No

Remarks SPD1 SPD2 SPPD

SPD /SPPD : CHECK LIST FOR SCHEDULING

S.No. SPD Verification Check List

ANNEXURE 2

11.4shall abide by the IEGC and CEA Regulations.

Yes / No

11.5shall follow the new element / generator procedure of SRLDC

while connecting to the grid .

Yes / No

11.6shall undertake to indemnify , defend and save SRLDC

harmless from any and all damages , losses including

commercial lossess due to forecasting error , claims and

actions including commercial losses due to forecasting error ,

claims and actions including those relating to injury to or

death of any person or damage to property , demands , suits

, recoveries , costs and expenses , court costs , attorney fees ,

and all other obligations by or to third parties , arising out of

or resulting from thetransactions undertaken by the

generators .

Yes / No

11.7Shall inform SRLDC regarding the new additions / deletion of

Power system elements within the solar park , as and when

there is a change .

No

11.8Shall be responsible for getting approval of SRPC of the

metering scheme and accounting methodology of solar park

and for each SPD.

No

11.9Shall provide the information sought by SRLDC & SRPC

regarding the solar park activities from time by coordinating

with the SPDs.

No

12

Shall submit to SRLDC the grant of connectivity agreement

with CTU / STU and the agreements entered with SPDs.

Yes / No

13Exemption of transmission charges and losses for the use of

ISTS network ( as per Central Electricity Regulatory

Commission (Sharing of Inter State Transmission Charges and

Losses) (Fifth Amendment) Regulations, 2017. dated :

14.12.2017 )

Yes / No

14

LTA Operationalization

Yes / No