Recommended Outline Development Plan for Kwun Tong Action Area
Harbourfront CommissionTask Force on Kai Tak Harbourfront Development
15 May 2019
![Page 2: Recommended Outline Development Plan for KwunTong Action Area · 6. Change Kei Yip Lane from two‐way to one‐ way and allow right turn to Kei Yip Street 1. Change to signalised](https://reader030.vdocuments.us/reader030/viewer/2022040223/5e515cff82a60c3d7b131a9d/html5/thumbnails/2.jpg)
3
2
2 56
4
1 6
53 4
Kwun Tong Public Pier
Kwun Tong Ferry Pier Square (KTFPS)
Study Area
1
Kwun Tong Typhoon Shelter
(KTTS)
Kai TakApproach Channel
(KTAC)
Kai Tak Runway Tip(KTRT)
Kwun Tong Action Area(KTAA)
KTAA
Waterbody (KTTS and KTAC)
Footbridge Connecting the Manulife Financial Centre and the Waterfront
Public Transport Interchange (PTI)
Kwun Tong Ferry Concourse Cooked Food Market (CFM)
Kei Yip Street Refuse Collection Point (RCP)
2
![Page 3: Recommended Outline Development Plan for KwunTong Action Area · 6. Change Kei Yip Lane from two‐way to one‐ way and allow right turn to Kei Yip Street 1. Change to signalised](https://reader030.vdocuments.us/reader030/viewer/2022040223/5e515cff82a60c3d7b131a9d/html5/thumbnails/3.jpg)
Alleviate existing traffic congestion problem at the junction of Hoi Yuen Road and Wai Yip Street
Provide more parking spaces
Improve overall environment of PTI
Support Option 1 open space arrangement (continuous at‐grade promenade)
Support Option 2 building disposition (two‐tower design)
Avoid blockage of visual / wind corridor along Hoi Yuen Road
Avoid blockage of view by Kwun Tong Bypass
Minimize impact of RCP to the waterfront area
1
2
PODP (Based on Two Option Schemes)
Option 1 – “Green Carpet” Approach Option 2 – “Integrated Grid” Approach
3
4
Major Comments Received in Public Consultations
5
1
3
2
5
6
7
4
6
8
8
7
3
![Page 4: Recommended Outline Development Plan for KwunTong Action Area · 6. Change Kei Yip Lane from two‐way to one‐ way and allow right turn to Kei Yip Street 1. Change to signalised](https://reader030.vdocuments.us/reader030/viewer/2022040223/5e515cff82a60c3d7b131a9d/html5/thumbnails/4.jpg)
4
Key Revisions to PODP
Sawtooth Layout Design• Reduction in area to 7 050m2 (‐12%) • Waiting area and other ancillary facilities for
passengers and drivers
Stepped‐down viewing deck
RCP remains in situ with reprovisioning of FEHD’s storage area
Reduce walking distance of Footbridge
Convert existing CFM site into open space
• Adopt Option 1’s continuous at‐grade promenade• Adopt Option 2’s two‐tower design layout
![Page 5: Recommended Outline Development Plan for KwunTong Action Area · 6. Change Kei Yip Lane from two‐way to one‐ way and allow right turn to Kei Yip Street 1. Change to signalised](https://reader030.vdocuments.us/reader030/viewer/2022040223/5e515cff82a60c3d7b131a9d/html5/thumbnails/5.jpg)
• Preserving Victoria Harbouro No reclamation
• Stakeholder Engagement o Stage 1 public consultation from Aug to Nov 2017 (on PODP and waterbody co‐use proposals) o Stage 2 public consultation in progress (on RODP and waterbody co‐use proposals)
• Sustainable Development and Integrated Planning o Integrated open space and pedestrian network to help meeting the current and future economic, social and
environmental needs of the locals and visitorso Mixed use developmento Integrated open space and pedestrian network
• Vibrant and Accessible Harbouro Accessibility from hinterland to the waterfronto Promenade extension to Tsui Ping River and Cha Kwo Lingo Connecting to cycle track network in the Kai Tak Development Area
• Proactive Harbour Enhancement for Public Enjoyment o A series of open spaces with various functions o Large variety of functions/events at the water body
Harbour Planning Principles
5
![Page 6: Recommended Outline Development Plan for KwunTong Action Area · 6. Change Kei Yip Lane from two‐way to one‐ way and allow right turn to Kei Yip Street 1. Change to signalised](https://reader030.vdocuments.us/reader030/viewer/2022040223/5e515cff82a60c3d7b131a9d/html5/thumbnails/6.jpg)
Drainage Reserve within “C” Site
Future Underground Stormwater Tank
Maximum Building Height (in mPD)
Public Road within “C” Site
POSPD
KTVFP Access Road
Existing Footbridge
Elevated Pedestrian Connection
Study Area
Commercial Use (“C”)
Open Space (“O”)
Government Use (“G”)
Other Specified Uses (“OU”)
6
Recommended Outline Development Plan
![Page 7: Recommended Outline Development Plan for KwunTong Action Area · 6. Change Kei Yip Lane from two‐way to one‐ way and allow right turn to Kei Yip Street 1. Change to signalised](https://reader030.vdocuments.us/reader030/viewer/2022040223/5e515cff82a60c3d7b131a9d/html5/thumbnails/7.jpg)
Proposed Master Urban Design Plan
At‐Grade Open Space Network
Elevated Green Deck
At‐grade “Open Space Node”
“Open Space Node” at Elevated Level
Existing Footbridge
Proposed Footbridge
At‐grade Pedestrian Network
Elevated Pedestrian Network
Proposed Building Height Restriction (in mPD)
Proposed Pet Garden
View / Air Corridor
KTVFP Access Road
Landscaped Staircase
Staircase
Escalator
Elevator
Proposed Vertical Connection
Proposed / Existing Building Entry At‐Grade Level Proposed Building Entry atElevated Green Deck Level
7
![Page 8: Recommended Outline Development Plan for KwunTong Action Area · 6. Change Kei Yip Lane from two‐way to one‐ way and allow right turn to Kei Yip Street 1. Change to signalised](https://reader030.vdocuments.us/reader030/viewer/2022040223/5e515cff82a60c3d7b131a9d/html5/thumbnails/8.jpg)
Indicative Massing
Pier
At‐grade Open Space(+ 4.48mPD)
Elevated Green Deck(+12.25mPD)
Office
Retail, F&BArts and Cultural / Institutional (AC/I)Government, Institutionor Community (G/IC)
8
![Page 9: Recommended Outline Development Plan for KwunTong Action Area · 6. Change Kei Yip Lane from two‐way to one‐ way and allow right turn to Kei Yip Street 1. Change to signalised](https://reader030.vdocuments.us/reader030/viewer/2022040223/5e515cff82a60c3d7b131a9d/html5/thumbnails/9.jpg)
Proposed Building Height Profile
9
![Page 10: Recommended Outline Development Plan for KwunTong Action Area · 6. Change Kei Yip Lane from two‐way to one‐ way and allow right turn to Kei Yip Street 1. Change to signalised](https://reader030.vdocuments.us/reader030/viewer/2022040223/5e515cff82a60c3d7b131a9d/html5/thumbnails/10.jpg)
Proposed Landscape Plan
Open Space Node (Multi‐Purpose Event Space)
Waterfront Promenade Elevated Green Deck (Creative Plaza)
Landscaped Staircase Entry Gateway (Ferry Plaza)
Entry Plaza
Alfresco Dining
6
5
534
1
2
7
10
![Page 11: Recommended Outline Development Plan for KwunTong Action Area · 6. Change Kei Yip Lane from two‐way to one‐ way and allow right turn to Kei Yip Street 1. Change to signalised](https://reader030.vdocuments.us/reader030/viewer/2022040223/5e515cff82a60c3d7b131a9d/html5/thumbnails/11.jpg)
7. Change to two‐way direction
6. Change Kei Yip Lane from two‐way to one‐way and allow right turn to Kei Yip Street
1. Change to signalisedjunction
4. Modification of existing hammer head
2. Shifting crossing westward
3. Extension of Kei Yip Lane as an additional road
5. Proposed traffic sign to control traffic direction
Proposed Traffic and Transport Arrangements
Proposed Road Network and PTI
Proposed Zebra Crossing
Proposed Public Road Network
11
![Page 12: Recommended Outline Development Plan for KwunTong Action Area · 6. Change Kei Yip Lane from two‐way to one‐ way and allow right turn to Kei Yip Street 1. Change to signalised](https://reader030.vdocuments.us/reader030/viewer/2022040223/5e515cff82a60c3d7b131a9d/html5/thumbnails/12.jpg)
Proposed Parking and Loading/Unloading Facilities
* 54 parking spaces if half of ancillary GV L/UL bays are shared for GV parking use at night‐time.
Type of Provision Proposed ProvisionPrivate Car Parking Spaces (Ancillary) Approx. 350Private Car Parking Spaces (Public) 130Goods Vehicle (GV) L/UL bays 36Public GV Parking Spaces 36*Coach Parking Spaces 10
Motorcycle Parking Spaces 5% of total provision for private vehicles
12
![Page 13: Recommended Outline Development Plan for KwunTong Action Area · 6. Change Kei Yip Lane from two‐way to one‐ way and allow right turn to Kei Yip Street 1. Change to signalised](https://reader030.vdocuments.us/reader030/viewer/2022040223/5e515cff82a60c3d7b131a9d/html5/thumbnails/13.jpg)
• Green Building Design BEAM Plus accreditation of Gold or above rating 30% greening ratio Installation of smart water meters
• EV charging facilities
• Sharing of real‐time parking vacancy information
• Automatic refuse collection system (ARCS)
• Smart PTI Real‐time display for estimated time of arrival Interactive panels for public transport information Charging facilities for EVs Passenger waiting area
• Ancillary bike parking facility
Requirements for New Land Sale Sites in KE
Recommendations in KTAA
• with connections to POS and PTI
• 30% greening ratio
Smart and Green Initiatives
Provision of POSPD
Commercial Site POSPD
Lease Requirements
Restriction on Alienation except as a Whole
13
![Page 14: Recommended Outline Development Plan for KwunTong Action Area · 6. Change Kei Yip Lane from two‐way to one‐ way and allow right turn to Kei Yip Street 1. Change to signalised](https://reader030.vdocuments.us/reader030/viewer/2022040223/5e515cff82a60c3d7b131a9d/html5/thumbnails/14.jpg)
Proposed Short‐term Co‐use Proposals in KTTS
Ferry Services Landing Steps
Existing Ferry/KaiTo Service Route
Revised Typhoon Shelter Passage Area in August 2018
Proposed Co‐use Area for Water Sports / Recreation Activities and Non‐pleasure Vessel Berthing
Proposed Designated Water Area for Water Sports Activities
Temporary Water Access for Water Sports and Recreation Activities / Events
Proposed Designated Water Access for Water Sports and Recreation Activities
Proposed Short‐term Tenancy (STT) Sites for Water Sports and Recreation Activities
2
3
1
1 2
3
Proposed Water Sports Centre by HKWSC
Proposed Modification of Glass, Balustrade along Existing Bollards Events Utilizing Kwun Tong Public Pier with Pontoon Access
Proposed Water Access for Recreation Activities
14
![Page 15: Recommended Outline Development Plan for KwunTong Action Area · 6. Change Kei Yip Lane from two‐way to one‐ way and allow right turn to Kei Yip Street 1. Change to signalised](https://reader030.vdocuments.us/reader030/viewer/2022040223/5e515cff82a60c3d7b131a9d/html5/thumbnails/15.jpg)
Proposed Medium to Long‐term Co‐use Proposals in KTTS
Ferry Service Landing Steps
Bollards to Facilitate Anchorage
Existing Ferry / KaiTo Service Route
Revised Typhoon Shelter Passage Area in August 2018Temporary Water Area for Water Sports and Recreation Activities / Events
Temporary Water Area for Recreation Activities
Proposed Designated Water Access for Water Sports Activities
Proposed Designated Water Area for Water Sports Activities (subject to legislative amendments)
Proposed Water Area for Water Sports and Recreation Activities / Temporary Water Area for Water Recreation Events
Flexible Land Area to Support Land‐water Events / Activities
Water Event Viewing Area
Special Events ‐ Dragon Boat Festival Special Events ‐ Sailing Race Village
15
![Page 16: Recommended Outline Development Plan for KwunTong Action Area · 6. Change Kei Yip Lane from two‐way to one‐ way and allow right turn to Kei Yip Street 1. Change to signalised](https://reader030.vdocuments.us/reader030/viewer/2022040223/5e515cff82a60c3d7b131a9d/html5/thumbnails/16.jpg)
o Amendments to the Kwun Tong (South) and Kai Tak Outline Zoning Plans (OZPs)
o Commencement of infrastructure works in KTAA
Way Forward
16
• Quick‐Win/Minor Works Projects
• Refurbishment of KTVFP Terminal Building (Q3 2019)
• Waterfront Promenade (Part) (Q4 2019)
• Facelifting of RCP and Storage Area Reprovisioning (Q2 2020)
• Public Works Projects
• DGV Queuing Space Reconfiguration (2021)
• Road Works (2022)
• Associated Open Spaces (2022)
• Construction of Stormwater Tank and Open Space above (2028)