    PROJECT MANGEMENT (569)Topic:-

    The role of audit in management of a project. Select aproject undertaken by a business organization and

    analyze the role of audit team being played in thatspecific project, e.g. pre audit, post audit, and its

    impact on the project

    SUBMITTED BY_ ASAD HUSSAIN

    SUBMITTED TO SIR ATAULLAH SHAH SB.

    1

  • 8/3/2019 Project Management 569

    2/25

    Asad Hussain MBA HRM Roll No.508195455

    ROLL NUMBER 508195455.

    MOB. NUMBER 03335174447.

    ACKNOWLEDGEMENT

    All praises to Almighty Allah, the most Gracious, the most Beneficent

    and the most Merciful, who enabled me to complete this assignment.

    There is always a sense of gratitude one expresses to others for the

    helpful and needy service they render during all phases of life. I have

    completed this assignment with the help of different personalities. I

    wish to express my gratitude towards all of them.

    It gives me immense pleasure to express my deep regards and

    sincere sense of gratitude to Mr. Salman Baig, Deputy Director Rural

    Cell, PTA H/Qs, Islamabad for his support which helped me throughout

    my assignment.

    I would also like to thank my teacher MR. ATAULLAH SHAH SB for

    steering my confidence and capability for giving me insight into

    assignment by giving me exposure to the arena of competitive and

    real world.

    Lastly I would like to thank my parents and friends for their constant

    support during the duration of my training.

    Thank You One and AllASAD HUSSAIN.

    2

  • 8/3/2019 Project Management 569

    3/25

    Asad Hussain MBA HRM Roll No.508195455

    ROLL NO. 508195455.MBA (HRM).

    EXECUTIVE SUMMARY

    This assignment is a research-oriented activity, which represents both the

    theoretical and practical implication of the topic. In the first section of this

    assignment, I explain the theoretical aspect of the topic and all major parts has

    been explained which are involved in the Audit of any project. For empirical

    study, I select Pakistan Telecom Authority (PTA) which is a regulatory authority

    for telecom sector and me the employee of countrys biggest telecom company

    i.e. Pakistan Telecommunication Company Limited, to analyze the audit process

    of a PTA project for installation of Telecentres throughout the country.

    3

  • 8/3/2019 Project Management 569

    4/25

    Asad Hussain MBA HRM Roll No.508195455

    CONTENTS:

    TITLE PAGE... 1

    ACKNOWLEDGEMENT 2

    EXECUTIVE SUMMARY.. 3

    CONTENTS..... 4

    INTRODUCTION OF TOPIC. 5

    REPORTING SCHEDULE. 5

    FINAL REPORT. 6

    PHASE-I.. 7

    PHASE-II.. 8

    PHASE-III.... 9

    CONCLUSION 10PROJECT AUDITING 11

    PURPOSE OF EVALUATION. 12

    DEPTH OF AUDIT. 13

    MEASUREMENT 15

    PRACTICAL STUDY (PTA).. 16

    DEPARTMENTALIZATION. 17

    THE PROCESS OF AUDIT 19

    FINANCIALS.. 20

    OBSERVATIONS 20

    DATA COLLECTION METHOD 21

    SWOT ANALYSIS.. 21

    CONCLUSION. 22

    4

  • 8/3/2019 Project Management 569

    5/25

    Asad Hussain MBA HRM Roll No.508195455

    RECOMMENDATIONS.. 23

    Project Audit Process

    Introduction

    The process of auditing any project starts out with a formal

    notification being sent to the project members, informing them of theimpending audit. The notification will also inform the project members

    of the audit team's objective and what compliance issues the team

    will be examining. After sending project members notification of the

    impending audit, the audit team will schedule and conduct a face-to-

    face meeting with the project head and any administrators. The audit

    team will examine the project's records and data files ahead of the

    full audit.

    Reporting Schedule

    After the formality of the initial inquiry is over, the audit team begins

    a full-fledged inquiry into the project. The team will attempt to glean a

    further idea of how the project is functioning by going over the

    project's background documents and conducting interviews with the

    project head and the project's sponsor. The audit team will also

    conduct a series of interviews with members of the project, mapping

    out their individual roles in the project, to get a more detailed idea of

    5

  • 8/3/2019 Project Management 569

    6/25

    Asad Hussain MBA HRM Roll No.508195455

    the project's hierarchy and the validity of each member's role. During

    the inquiry and reporting phase of the audit, the audit team will

    periodically report its finding back to the project's sponsor. The audit

    team will also examine the project members' efficiency in following

    their set timelines and will record any inconsistencies in the project's

    goals and individual project member's performance.

    Final Report

    After sufficient data has been gleaned from the project's data files

    and group member interviews and the audit team has a firm idea of

    how the project is supposed to be carried out, the audit team will

    create a formal draft of its report. After the management team

    presiding over the audit team has reviewed the formal report and

    decided whether to recommend any amendments or further inquires

    into the project, the audit team will construct the final draft. The final

    draft of the audit report will contain a summary, list background and

    key issues raised, and provide an assessment of the quality of the

    project members' performance in carrying out its said goals.

    A project audit provides an opportunity to uncover the issues,

    concerns and challenges encountered in the execution of a project. It

    affords the project manager, project sponsor and project team an

    interim view of what has gone well and what needs to be improved

    with the project to successfully complete it. If done at the close of a

    project, a project audit can be used to develop success criteria for

    future projects by providing a forensic review. This review will provide

    an opportunity to learn what elements of the project were

    6

    http://www.bia.ca/systems-audit.htmhttp://www.bia.ca/systems-audit.htm
  • 8/3/2019 Project Management 569

    7/25

    Asad Hussain MBA HRM Roll No.508195455

    successfully managed and which ones presented some challenges.

    This will help the organization identify what it needs to do so that

    mistakes are not repeated on future projects.

    Regardless of whether the project audit is conducted mid-term on a

    project or at its conclusion, the process is similar. It is generally

    recommended that an outside facilitator conduct the project audit.

    This ensures confidentiality but also provides the team members and

    other stakeholders with the opportunity to be candid. They know that

    their input will be valued and the final report will not identify

    individual names, rather it will only include facts. It is common that

    individuals interviewed during the project audit of a particularly badly

    managed project will find speaking with an outside facilitator provides

    them with the opportunity to express their emotions and feelings

    about their involvement in the project and/or the impact the project

    has had on them. This venting is an important part of the overallaudit.

    A project audit consists of three phases:

    Phase 1: Success Criteria and Questionnaire Development

    Phase 2: In-depth Research

    Phase 3: Report Development

    Phase 1 - Success Criteria and Questionnaire Development

    1. Success Criteria Development

    7

    http://www.bia.ca/articles/UndertakingaSuccessfulProjectAudit.htm#phase1%23phase1http://www.bia.ca/articles/UndertakingaSuccessfulProjectAudit.htm#phase2%23phase2http://www.bia.ca/articles/UndertakingaSuccessfulProjectAudit.htm#phase3%23phase3http://www.bia.ca/articles/UndertakingaSuccessfulProjectAudit.htm#phase1%23phase1http://www.bia.ca/articles/UndertakingaSuccessfulProjectAudit.htm#phase2%23phase2http://www.bia.ca/articles/UndertakingaSuccessfulProjectAudit.htm#phase3%23phase3
  • 8/3/2019 Project Management 569

    8/25

    Asad Hussain MBA HRM Roll No.508195455

    Interview the core project sponsor and project manager to determine

    their success criteria for the project audit. This ensures that their

    individual and collective needs are met.

    2. Questionnaire Development

    Develop a questionnaire to be sent to each member of the

    core project team and selected stakeholders. We find that

    individuals will often complete the questionnaire in advance

    of an interview. It helps them to focus their thoughts. The

    actual interview provides the facilitator with the opportunity

    to gain deeper insights into the interviewees comments.

    The questionnaires help them to reflect on the projects

    successes, failures, challenges and missed opportunities.

    3. Project Audit Questions

    There are many questions that can be asked. It is easiest to

    develop open-ended questions for the interviews. These

    questionnaires can be used for team members and/or other

    stakeholders who cannot attend an interview.

    Develop the questions so that they will help to identify the major

    project successes; the major project issues, concerns and challenges;

    how the team worked together; how vendors were managed; how

    reporting and meetings were handled; how risk and change wasmanaged, etc.

    Phase 2 - In-Depth Research

    8

  • 8/3/2019 Project Management 569

    9/25

    Asad Hussain MBA HRM Roll No.508195455

    1. Conduct individual research interviews with the Project Sponsor,

    Project Manager and Project Team members in order to identify

    the past, current and future issues, concerns, challenges and

    opportunities.

    2. Conduct individual research interviews with stakeholders

    including vendors, suppliers, contractors, other project internal

    and external resources and selected customers.

    3. Assess the issues, challenges and concerns in more depth to get

    to the root causes of the problems.

    4. Review all historical and current documentation related to this

    project including;

    Team Structure

    Scope Statement

    Business Requirements

    Project Plan

    Milestone Report Meeting Minutes

    Action Items

    Risk Logs

    Issue Logs

    Change Logs

    5. Review the Project Plan to determine how the Vendor Plan has

    been incorporated into the overall project plan.

    6. Interview selected Stakeholders to identify and determine what

    their expectations of the project had been and to identify to what

    extent their expectations have been met.

    9

  • 8/3/2019 Project Management 569

    10/25

    Asad Hussain MBA HRM Roll No.508195455

    7. Review the Project Quality Management and the Product Quality

    Management to identify the issues, concerns and challenges in

    the overall management of the project and to identify the

    opportunities that can be realized through improvements to the

    attention of project and product quality.

    Identify the Lessons Learned that can improve the performance of

    other future projects within the organization.

    Phase 3 - Report Development

    1. Compile the information collected from all of the interviews.

    2. Compile the information collected from individuals who only

    completed the questionnaire.

    3. Consolidate the findings from the project documentation review.

    4. Identify the issues, concerns and challenges presented through

    the review of the Project Quality Management and Product

    Quality Management plans and isolate the opportunities you

    believe may be realized.

    5. Identify all of the projects issues, concerns and challenges.

    6. Identify all of the projects opportunities that can be realized

    through this reports recommendations.

    7. Identify the Lessons Learned that can improve the performanceof future projects within the organization.

    Finalize the creation of the report and recommendations on the basis

    of the findings and present this detailed report and recommendations

    10

  • 8/3/2019 Project Management 569

    11/25

    Asad Hussain MBA HRM Roll No.508195455

    including the road map to get future projects to the next level of

    performance.

    Conclusion

    The purpose of a project audit is to identify Lessons Learned that

    can help improve the performance of a project or to improve the

    performance of future projects by undertaking a forensic review to

    uncover problems to be avoided. In this way, project audits are highly

    beneficial to the organization and provide the following multitude of

    outcomes:

    Development of Lessons Learned on the project that can be

    applied to both the organization and its vendors.

    Development of strategies, which if implemented within the

    organization, will increase the likelihood of future projects and

    change initiatives being managed successfully.

    Development of project success criteria which might include on-

    time, on-budget, meeting customer and other stakeholder

    requirements, transition to next phase successfully executed,

    etc.

    Recognition of risk management so that risk assessment and the

    development of associated contingency plans becomes

    commonplace within the organization.

    Development of change management success criteria which

    might include how staff are involved, how customers are

    11

    http://www.bia.ca/project-and-quality-success-system.htmhttp://www.bia.ca/project-and-quality-success-system.htm
  • 8/3/2019 Project Management 569

    12/25

  • 8/3/2019 Project Management 569

    13/25

    Asad Hussain MBA HRM Roll No.508195455

    o A third dimension, again somewhat straightforward and

    expected, is business/direct success

    o The last dimension, somewhat more difficult and nebulous

    to ascertain, is future potential

    A successful project evaluation can help an organization:

    o Identify problems earlier

    o Clarify performance, cost, and time relationships

    o Improve project performance

    o Locate opportunities for future technological advances

    o Evaluate the quality of project management

    o Reduce costs

    o Speed the achievement of results

    o Identify mistakes, remedy them, and avoid them in the

    future

    o Provide information to the client

    o Reconfirm the organizations interest in, and commitment

    to, the project

    Evaluation often makes recommendations that relate to

    ancillary, unplanned, but important contributions to the project

    and its parent:

    o Improve understanding of the ways in which projects may

    be of value to the organization

    o Improve processes for organizing and managing projects

    o Provide a congenial environment in which project team

    members can work creatively together

    13

  • 8/3/2019 Project Management 569

    14/25

    Asad Hussain MBA HRM Roll No.508195455

    The Project Audit

    Six parts of a project audit:

    o 1. Current status of the project

    o 2. Future status

    o 3. Status of crucial tasks

    o 4. Risk assessment

    o 5. Information pertinent to other projects

    o 6. Limitations of the audit

    It is far broader in scope than a financial audit and may deal with

    the project as a whole or any component or set of components of

    the project

    Depth of the Audit

    Time and money are two of the most common limits on depth of

    investigation and level of detail presented in the audit report

    Accumulation, storage, and maintenance of auditable data are

    important cost elements

    Two often overlooked costs are the self protective activity of

    team members during an audit, and the potential for project

    morale to suffer as a result of a negative audit

    There are three distinct and easily recognized levels of project

    auditing:

    o General audit - normally most constrained by time and

    resources and is usually a brief review of the project

    touching lightly on the six parts of an audit

    14

  • 8/3/2019 Project Management 569

    15/25

    Asad Hussain MBA HRM Roll No.508195455

    o Detailed audit - usually conducted when a follow-up to the

    general audit is required

    o Technical audit - generally carried out by a qualified

    technician under the direct guidance of the project auditor

    Timing of the Audit

    The first audits are usually done early in the projects life

    Early audits are often focused on the technical issues in order

    to make sure that key technical problems have been solved

    Audits done later in the life cycle of a project are of less

    immediate value to the project, but are more valuable to the

    parent organization

    As the project develops, technical issues are less likely to be

    matters of concern

    Conformity to the schedule and budget become the primary

    interests

    Management issues are major matters of interest for audits

    made late in the projects life

    Postproject audits are often a legal necessity because the

    client specified such an audit in the contract

    Construction and Use of the Audit Report

    The information should be arranged so as to facilitate the

    comparison of predicted versus actual results

    15

  • 8/3/2019 Project Management 569

    16/25

    Asad Hussain MBA HRM Roll No.508195455

    Significant deviations of actual from predicted results should

    be highlighted and explained in a set of footnotes or

    comments

    Negative comments about individuals or groups associated

    with the project should be avoided

    Measurement

    Measurement is an integral part of the audit/evaluation

    process

    Performance against planned budget and schedule usually

    poses no major measurement problems

    Measuring the actual expenditure against the planned budget

    is harder and depends on an in-depth understanding of the

    procedures used by the accounting department

    It is a very difficult task to determine what revenues should be

    assigned to a project

    All cost/revenue allocation decisions must be made when the

    various projects are initiated

    The battles are fought up front and the equity of

    cost/revenue allocations ceases to be so serious an issue

    As long as allocations are made by a formula, major conflict is

    avoided-or at least, mitigated

    16

  • 8/3/2019 Project Management 569

    17/25

    Asad Hussain MBA HRM Roll No.508195455

    Practical Study

    The chosen organization is Pakistan Telecommunication Authority

    (PTA) for the data collection purpose. PTA is an autonomous body

    established under Pakistan Telecommunication (Re-organization) Act

    1996 to regulate, operate and maintain telecommunication systems

    and services in Pakistan. PTA has its Headquarter in Islamabad and

    five Zonal offices in Karachi, Lahore, Rawalpindi, Peshawar and

    Quetta. We shall discuss the use of visual aids by the Organization.

    Functions and responsibilities of Pakistan Telecom Authority are as

    under:

    Regulate the establishment, operation and maintenance of

    telecommunication systems

    Make recommendations to the Government on polices

    Protect the rights of licensees and interests of consumers

    Create fair competition in telecommunication sector

    Promote rapid modernization of telecommunication systems and

    services.

    17

    http://images.google.com.pk/imgres?imgurl=http://www.views.pk/wp-content/uploads/2007/05/pta.jpg&imgrefurl=http://www.views.pk/pakistan-telecommunication-authority-pta&usg=__1P5mlGQ96t8spOI43YFKNCUEo0s=&h=96&w=150&sz=4&hl=en&start=1&itbs=1&tbnid=toJgw_kuFgw4YM:&tbnh=61&tbnw=96&prev=/images%3Fq%3DPAKISTAN%2BTELECOM%2BAUTHORITY%26hl%3Den%26sa%3DG%26gbv%3D2%26tbs%3Disch:1
  • 8/3/2019 Project Management 569

    18/25

    Asad Hussain MBA HRM Roll No.508195455

    Departmentalization

    18

  • 8/3/2019 Project Management 569

    19/25

    Asad Hussain MBA HRM Roll No.508195455

    PTA has broadly divided into two functional parts Technical and

    Financial headed by Members. Under each member there are

    different divisions headed by DGs like Coordination, Wireless,

    Wireline, Commercial Affairs, Finance, Enforcement, Law &

    Regulations, Economic Affairs and Industry Development. The

    Divisions are further categorized into Directorates headed by

    Directors.

    One of the best project and program of PTA is that of Rabta Ghar or

    Telecenter to enhance rural telephony.

    The Pakistan Telecommunication Authority (PTA) launched a

    telecentre project called Rabta Ghar in rural areas across Pakistan in

    January 2008. Under the first phase of the scheme, PTA along with

    other telecom operators established 400 telecentres for which

    equipment worth PKR 50,000 each was provided free of cost. The

    telecom operators sponsoring Rabta Ghar include PTCL (100),

    Mobilink (100), Ufone (50), Instaphone (15), Intel (10), Worldcall

    (payphones in all Rabta Markaz) and PTA (125) bringing the total to

    400. A Rabta Ghar (telecentre) is a small business set-up that

    provides PCO, internet, fax, printing and scanning services to small

    communities. These telecentres were provided to those individuals

    who are unemployed with at least intermediate qualification and have

    a shop or room of minimum 1012 ft. Individuals from villages/union

    councils were considered for Rabta Ghar where the population is

    4,000 to 10,000 and no public telephone or net cafe facility in the

    radius of 5 km is available. PTA has also arranged free delivery,

    19

  • 8/3/2019 Project Management 569

    20/25

    Asad Hussain MBA HRM Roll No.508195455

    installation and training of the Rabta Ghar equipment on the

    premises of the selected individuals by Intel through its genuine Intel

    dealers (GIDs).

    The development of rural communication is a multi faceted issue and

    PTA realizing its importance is mobilizing all the relevant resources for

    increasing access of telecom services in rural areas. Rabta Ghar

    (Telecentres) are the most suitable strategy for bridging the digital

    divide; therefore PTA has taken the initiative of promoting awareness

    and also facilitating the establishment of Telecentres and PCOs.

    Telecentre is a small establishment providing telephone, fax and

    Internet services to a community. This will not only provide basic

    Telecom services in rural areas but will also create employment

    opportunities.

    PTA launched the Rural Telephony Project across Pakistan. The main

    objective of the project is the establishment of Telecentres across

    Pakistan. The project comprises of the following two main

    components:

    Rabta Ghar through PTA & Telecom Companies Funds

    Rabta Ghar through Micro Credit Loans

    The Process of Audit:

    The project of Rabta Ghar was audited by audit team of the following

    members:-

    20

  • 8/3/2019 Project Management 569

    21/25

    Asad Hussain MBA HRM Roll No.508195455

    1. Mr.Shahid Javaid, Assistant Director

    2. Mr.Gul Hassan, Assistant Director

    3. Mr.Umar Farooq, Assistant

    Financials

    Rabta Ghar was a project of Rs. 30,00,000 under which a total of 400

    Telecenter were installed.

    Process

    Following process of audit.

    1. Committee formulated of the above mentioned offices.

    2. Files of all the telecentres have been scrutinized according tothe prescribed rules.

    3. The administration and management of the revolvers has also

    been analyzed.

    4. Committee prepared its initial report and sent it to finance and

    enforcement divisions of PTA for analysis and vetting.

    5. After vetting the audit report has been prepared and

    submitted to Chairman PTA.

    Observations:

    Following were the observations of the team.

    21

  • 8/3/2019 Project Management 569

    22/25

    Asad Hussain MBA HRM Roll No.508195455

    1. 14 telecentres are either not installed or made dead after

    installation.

    2. An amount of RS. 400,000 can not reconciliated

    3. Amount allocated for checking and survey of the telecentres

    has no valid records.

    4. Some machines are left, after the completion, whose cost can

    not be recon ciliated.

    Data collection methods

    I personally visited the office of PTA HQ, Islamabad, and met Mr.

    Salman Baig, Deputy Director Rural Cell who gave me all the details.

    SWOT analysis

    Strengths

    Efficient Employees looking into the Audit Process.

    All facilities provided for Audit.

    High funds allocated for Audit.

    Weaknesses

    Vague records.

    No cooperation from the owners of telecenters.

    Data was computerized which could not be validated by old

    system.

    22

  • 8/3/2019 Project Management 569

    23/25

    Asad Hussain MBA HRM Roll No.508195455

    Opportunities

    Facilitation for future Audit.

    Helped recover the wasted money.

    Helped in quality management of new such projects.

    Threats

    Telecenter owners not well educated who hindered the Audit

    process.

    Low interest of few stakeholders in Audit process.

    Some corrupt contractors made problems for audit.

    Conclusions

    The strategy being used in audit of this project was extremely suitable

    to its objectives.

    Each Rabta Ghar is being equipped with a PC, one Wireless PCO, One

    Internet enabled Wireless set, Printer, scanner, copier and fax (4 in 1

    machine) was checked as per audit rules. In addition to that each

    Rabta Ghar owner is being provided with a comprehensive training

    from the GID and the owner is also being provided a training manualand selflearning CD for future reference. Apart from above, A

    Universal Service Fund (USF) has also been created to bring the focus

    of telecom operators towards rural population, which remained

    unnerved. Up till now, USF has awarded contracts to provide services

    23

  • 8/3/2019 Project Management 569

    24/25

    Asad Hussain MBA HRM Roll No.508195455

    in Malakand, Sukkur, DG Khan, Pishin, Mansehra and Dadu while

    several projects are in pipeline It is expected that over 5 million

    population of these remote areas will get benefit out of these projects.

    USF signed Contract of Pilot project on October 04, 2007 with Telenor

    that aims to provide telecom related services in Malakand Division. A

    subsidy of Rs. 310 Million is being provided to Telenor for this project.

    Telenor will install a total of 175 cell sites in Malakand. A subsidy of

    Rs.112 Million is being provided to Mobilink for the provision of

    telecom services in Sukhar which covers 25% od the province of Sind.

    Warid Telecom under USF will get a subsidy of Rs. 91 Million to

    provide services to the mass population in un-served areas of Dera

    Ghazi Khan division. PTCL will provide basic telephony and data

    services to the population in the yet un-served areas of Baluchistan

    districts of Pishin, Killa Abdullah and Quetta and a subsidy of Rs. 175

    Million is being provided to PTCL for this project. PTCL will get another

    subsidy of Rs. 300 million to provide basic telecom services in

    Mansehra and a subsidy of Rs. 250 million for provision of telecom

    services in Dadu under USF facility. USF has planned to extend the

    Fibre Optic connectivity to the un-served TEHSIL HQs in Pakistan for

    meeting the growing requirements of Voice, Data and Video in these

    areas.

    Recommendations

    I shall submit the following recommendation for this project:

    24

  • 8/3/2019 Project Management 569

    25/25

    Asad Hussain MBA HRM Roll No.508195455

    Introduction of Private Auditors to the Project.

    Media campaigns to enhance awareness among people should

    be launched.

    Number of auditors may be allocated to each area according to

    its rural population and the work done there.