TIA 569 Standards Update TIA569 Standards Update Pathways & Spaces Ignacio Diaz, RCDD April 25, 2012

Upload: vuongbao

Post on 10-Jan-2017

479 views

Category:

Documents


105 download

TRANSCRIPT

  • TIA 569 Standards UpdateTIA569StandardsUpdatePathways&Spaces

    IgnacioDiaz,RCDDApril25,2012

  • TIA569Pathways&SpacesStandard

    ThepurposeofthisStandardistostandardizespecificpathwayandspacedesignandconstructionpracticesinsupportoftelecommunicationsmediaandequipmentwithinbuildingsbuildings.

    Scopelimitedtotelecommunicationsaspectofbuildingdesignbutinfluencesdesignofotherbuildingservices(i.e.g g g (HVAC,electricalpower,etc)

    Definerequirementsforkeyspaces BuildingSpaces Access&ServiceProviderSpaces MultitenantBuildingSpaces BuildingPathways

    Cabling distribution should try to find a solution that will:Cabling distribution should try to find a solution that will:Accommodate cabling changesMinimize occupant disruption when horizontal pathways are accessedAllow for future growth

  • TIA569Pathways&SpacesStandard

    Astandardestablishedforrooms,pathways,andareasintoandthroughwhichstructured cabling components and equipment are installed Applies to:structuredcabling,components,andequipmentareinstalled.Appliesto:

    Conduits UnderfloorductsandFloorBoxes

    A fl (R i d Fl ) Accessfloor(RaisedFloors) Ceilingpathways(JHooks&Rings) Cabletraysystems

    P i t th Perimeterpathways Raceways

    TelecommunicationsCloset&EquipmentRoom Sizes & Provisions Sizes&Provisions

  • TIA569Pathways&SpacesStandardBuildingSpaces:GeneralRequirements

    GeneralRequirementsapplyto DistributorRoom Common Distributor Room CommonDistributorRoom EntranceRoom AccessProviderSpace ServiceProviderSpacep

    Temperature&humidityguidelinesperASHRAEThermalGuidelinesforDataProcessingEnvironments

    T & h idi i l i i h ll Temperature&humidityintelecommunicationsspaceshallmeetrequirementsforASHRAEClass3

    UPSlargerthan100kVAlocatedinseparateroomg p

    Bonding&groundingsystemshallbeprovidedperANSI/TIA607B

  • TIA569Pathways&SpacesStandardBuildingSpaces:GeneralRequirements

    Plywoodbackboard inplywood(atleastonewall) Paintedwithtwocoatsfireretardantpaint Nolongerrequiredtobepaintedwhite

    Ceilings Ceilingheightmin,8ftclearspace(10ftbetweenfinishedfloorandlowest

    pointofceiling)

    Recommendformaxflexibilitynottousesuspendedceiling Floorloading

    Static&dynamiccapacityshallbesufficienttobearbothdistributed&concentratedloads

    Shallconsultstructuralengineer Lighting

    Min500luxinhorizontalplane Min200luxinverticalplane Measured1m(3ft)abovefinishedfloor( ) Poweredseparatelyfromtelecommunicationsequipment Shouldnotusedimmerswitches

    Doors Minimum of 36 x 80 (optional 72x 90)Minimumof36 x80 (optional72 x90 )

  • TIA569Pathways&SpacesStandardBuildingSpaces:DistributorRoom

    Commonaccessforcablingsubsystems&buildingpathwaysl bl Containstelecommunicationsequipment,cableterminations,&

    crossconnect

    Inacommercialbuildingitiscalledanequipmentroomortelecommunications room depending on what is in ittelecommunicationsroomdependingonwhatisinit

    Shouldfollowgeneralguidelines Multipledistributorroomsonsamefloorinterconnectedby

    minimum of one metric designator 78 (trade size 3) conduit orminimumofonemetricdesignator78(tradesize3)conduitorequivalentpathway

  • TIA569Pathways&SpacesStandardBuildingSpaces:DistributorRoom

    DistributorB(i.e.intermediatecrossconnect(IC)incommercialbuilding) min. of 10 m2 (100 ft2)building)min.of10m (100ft )

    DistributorC(i.e.MCincommercialbuilding)min.12m2 (120ft2)forbuildingwithgrossareaupto50,000m2 (500,000ft2)

    Increase 1 m2 (10 ft2) per 10 000 m2 (100 000 ft2) increase in Increase1m2 (10ft2)per10,000m2 (100,000ft2)increaseinbuildingsize

    Minimum1distributorroomperfloor

    Minimumtwodedicated120VAC/20Aoutlets 6ftspacing; 6inabovefloor

  • TIA569Pathways&SpacesStandardBuildingSpaces:EntranceRoom/Space

    EntranceRoom/Space Entranceforoutsideplant&pathwaysshallmeetrequirements

    of ANSI/TIA758B (Outside Plant ) standardofANSI/TIA758B(OutsidePlant)standard

    Inbuildingsupto10,000sqm(100,000sqft),wallmountingterminatinghardwaremaybesuitable

    Minimum of two dedicated 120 VAC /20 A outletsMinimumoftwodedicated120VAC/20Aoutlets

    DistributorEnclosure Centrally locatedCentrallylocated Lighting,measuredindistributorenclosure,minimum500lux Minimumofonededicated120VAC/20Aoutlet

  • TIA569Pathways&SpacesStandardAccess&ServiceProviderSpaces

    Usedforthelocationoftransmission,reception,andsupportequipment

    MinimumAccess&ServiceProviderSpace:1.5mx2m(4ftx6ft)

    ShouldbeclosetoDistributorC(i.e.MC)

    Atleastonededicated120VAC/20A,nonswitchedduplexelectrical receptacle for equipmentelectricalreceptacleforequipment

  • TIA569Pathways&SpacesStandardBuildingSpaces:Racks&Cabinets

    Minimum3ftfrontclearance;4ftispreferable

    Minimum 2 ft rear clearance; 3 ft is preferable Minimum2ftrearclearance;3ftispreferable Equipmentmayrequireadditionalclearance

    Suggestusingcabinets6indeeperorwiderthanl ilargestequipment

    Shouldhaveadjustablemountingrails Rails should have markingsRailsshouldhavemarkings

  • TIA569Pathways&SpacesStandardBuildingSpaces:Racks&Cabinets

    Cabinetsshallbeselected&configuredtoprovideadequatecooling(somesuggestionslistedbelow) Forcedairflowusingfansg Naturalairflowbetweenhot&coldaisles Hotaisle/coldaislecabinetarrangement Useofblankingpanelsandbaffles

    Sealing air leaks around cable ingress points Sealingairleaksaroundcableingresspoints

    Verticalcablemanagershallbeinstalledbetweenracksandatbothendsofeveryrow(atleast3.25inwide)

    Horizontalmanagementsufficienttoprovidestrategicgrowthofupto100%butnotimpaircooling

  • TIA569Pathways&SpacesStandardBuildingPathways

    Considerquantity,size&bendradiusrequirementsofcableq y, qwhendeterminingsizeofpathway

    Allowforgrowth

    N t l t d i l t h ft Notlocatedinelevatorshafts

    Areasaboveceilingsmaybeusedaspathwayfortelecommunicationscables&forconnectinghardware

    Coinstallationoftelecommunicationscable&typicalbranchcircuit(120/240VAC/20A)mustmeetrequirementsofNFPA70

  • TIA569Pathways&SpacesStandardBuildingPathways

    Zeropathwayseparationpermittedwhentelecommunications cables & power cables both enclosed intelecommunicationscables&powercablesbothenclosedinmetallicpathways

    (minwallthicknessof1mm(0,04in)ofsteelor1.5mm(0,06 in)aluminum)(0,06in)aluminum)

    Providestablewithguidelinesforseparationoftelecommunicationspathwaysforbalancedtwistedpaircabling from adjacent power wiringcablingfromadjacentpowerwiring

    BalancedTPcablingseparatedfromfluorescentlamps/fixturesbyminimumof125mm(5in)

  • TIA569Pathways&SpacesStandardBuildingPathways

    Pathwayseparationfromsourcesofelectromagneticenergy:

    Condition 5KVA

    Unshielded Power Lines in proximity to open PVC

    Pathways

    5 in 12 in 24 in

    Unshielded Power Lines 2 5 6 i 12 iUnshielded Power Lines in proximity to Grounded

    Metallic Pathways

    2.5 in

    6 in 12 in

    Power Lines enclosed in

  • TIA569Pathways&SpacesStandardBuildingPathways

    Minimum75mm(3in)clearverticalspaceavailableaboveceilingtilesifusingaspathway

    Min.300mm(12in)clearanceabovecabletraysystemorrunway

    Traysmaybedividedwithbarrierforphysicalseparationbetweenpower&TPcable

    Noncontinuoussupportslocatedatintervalsnottoppexceed1.5m(5ft)

  • TIA569Pathways&SpacesStandardBuildingPathways

    CableTrays Plannedforinitialmaxcalculatedfillratioof25%Note A calculated fill ratio of 50% for 4 pair & similarNote:Acalculatedfillratioof50%for4pair&similarcablewillphysicallyfillentiretrayduetospacesbetweencables

    CableRunway Stackednohigherthan150mm(6in)

    Pathwaysfreefromburrs,sharpedgesorprojections

    Traysandwirewaysmaybedividedwithabarriertoallowforphysicalseparationofdifferenttypesofservices.

    Ifnonmetallictraysandwirewaysarelocatedintheplenum,theyshallbeplenumrated.

  • TIA569Pathways&SpacesStandardBuildingPathways

    CeilingPathway(JHooks&BridleRings)

    Spacing48to60offcenter(eliminatecopperdegradation)

    MaximumofQ(75)4PairUTP

    OverQ(75) addanotherJHookormigratetoCableTray

  • TIA569Pathways&SpacesStandardBuildingPathways

    ConduitSectionsbetweenpullpointsshallnotexceed30m(100ft)

    in runs that total more than 30m (100) insert pull boxes so that no inrunsthattotalmorethan30m(100 ),insertpullboxessothatnosegmentbetweenpullpointsexceedsthe30m(100)limit.

    Nosectionshallcontainmorethantwo90degreebends

    Conduitswithinternaldiameterof50mm(2in)orless,insidebendradiusofabendinconduitshallbeatleast6timestheinternaldiameter

    Conduitswithaninternaldiameterofmorethan50mm(2in),the inside radius of a bend in conduit shall be at least 10 timestheinsideradiusofabendinconduitshallbeatleast10timestheinternaldiameter.

    Bondedtoground,inaccordancetonationalorlocali trequirements

    Hasreferencetableforpullboxsizes

    f ll f f h Maximumfillforfurniturepathwaysis40%

  • TIA569Pathways&SpacesStandardBuildingPathways

    Conduit(RIGID,EMT,ENT,PVC,HDPE)

    / Mustbeaminimumof3/4

    40%FillRatio(NEC)applies

    FireCodesapplyandmustberespectedregardingtheuseofpolymers

  • TIA569Pathways&SpacesStandardPullBoxesandSplices

    Pull Box Installation Locate pull boxes in easily accessible locations Horizontal cable boxes should be installedLocate pull boxes in easily accessible locations. Horizontal cable boxes should be installed

    above suspended ceilings. Should be used when installing a pull string or cable, fishing the

    conduits run, and pulling and looping the cable in the next length of conduit.

    Pull boxes should be used when:Conduits runs are more than 30m (100)Contain more than two 90 bends.

    P ll bo es shall not be sed for splicing cablePull boxes shall not be used for splicing cable.

    Splice boxesIntended to be used for splicing in addition to pulling cable. A slip sleeve is a conduit sleeve that is larger than the main conduit, and slipped over an opening in a conduit run after the

    cable is in place. A gutter is a square, sheet-metal housing, which is placed over an opening in a conduit. Slip sleeves or gutters cannot be used for splices, but can be used in

    place of a pull box, are more economical to install, and will provide more space for pulling.

  • TIA569Pathways&SpacesStandardOtherPathwayTypes

    PowerpolespecificationsPowerpolesstandardsizesaccommodate3m(10),3.7m(12), and4.6m(15)ceiling heightsceilingheights.

    PowerpoleinstallationMountrigidlybetweentheceilingsupportchannelgridandcarpetedortiledfloor.Utilitycolumnsmaybeattachedtothecrossrailsonlyiftherailsare

    l h d h i ili h lsecurelyanchoredtothemainceilingsupportchannel.

    PokethruspecificationPokethrudistributionisusuallyimplementedbyinstallingcablefromtheceilingofthefloorbelow,toapointwhereserviceisdesiredonthatsamefloor,thenpokingthruthefloortoallowthecabletobeattachedtotelecommunicationsdevice.

    PokethruinstallationPokethruinstallationshouldbedoneinaccordancetoalllocalandnationalcodes,instrictaccordancewiththeUnderwritersLaboratoriesproceduresfoundintheFireResistanceDirectory,andthepokethruaddendum4toANSI/TIA/EIA569A.

  • TIA569Pathways&SpacesStandardBuildingPathways

    TheNECandlocalcodestakeprecedence

    wheninstallingconduit,choicesin

    conduit type shall be of the typeconduittypeshallbeofthetype

    permittedundertheappropriate

    electricalcodes.

  • TIA569Pathways&SpacesStandardBackbone

    Backbonepathwaysconsistof:

    Interbuilding backbonepathwayswhichextendbetweenbuildings Intrabuilding backbone pathways which are contained within aIntrabuilding backbonepathwayswhicharecontainedwithina

    building

  • TIA569Pathways&SpacesStandardBackbone

    Intrabuilding pathwaysconsistof:

    Ceilingpathways Conduits SleevesSleeves Slots Trays

  • TIA569Pathways&SpacesStandardBackbone

    Slots Sleeves Trays

  • TIA569Pathways&SpacesStandardBackbone

    Sleeves

    An opening, usually circular, through the wall, ceiling, or floor to allow the passage of cables and wires.

    Slots

    An opening through a wall floor or ceiling usually rectangular to allowAn opening through a wall, floor, or ceiling , usually rectangular, to allow the passage of cables and wires.

  • TIA569Pathways&SpacesStandardFirestopping

  • TIA569Pathways&SpacesStandardNewVersion!

    Newrevisionworkhasbeengoingonforpastyear

    Referenceforallpremisestandards

    Nolongerspecifictocommercialbuildings

    N i i j t d f bli ti ANSI/TIA NewrevisionjustapprovedforpublicationasANSI/TIA569C

    OtherChangesinclude Removed60%fillmaxlimitforfurniturepathwaysforgrowth;onlyrecommendsinitiallydesigningto40%fill

    Power&noiseseparationapplytoallapplications;nod ti f 10Gb/ li tinewrecommendationsfor10Gb/sapplications

  • TIA569Pathways&SpacesStandardAccommodatingNewASHRAEGuidelines

    TIA569CdraftwasalmostcompletewhenASHRAEchangedguidelinesguidelines

    Twophaseapproachtoincludingchanges1 Added new class names editorially to TIA569C1. AddednewclassnameseditoriallytoTIA 569 C

    NochangetorequirementsforTIA569C2. Workingonaddendumtoharmonize

    Will be TIA569C 1WillbeTIA 569 C.1 Maybecompletebyendofyear

    29

  • TIA569Pathways&SpacesStandard

    ASHRAEchangestoThermalGuidelinesforDataProcessingEnvironments

    Class1&2nowA1&A2 Twonewclasses,A3&A4 A1,A2,A3&A4haveallowable&recommendedranges

    NochangewithA1&A2E d d ll bl f A3 & A4 ExpandedallowablerangeforA3&A4

    Class3&4replacedbyClassB&Cwithnochanges

    30

  • TIA569Pathways&SpacesStandard

    ASHRAE changes to Thermal Guidelines for Data Processing EnvironmentsEnvironments

  • OtherStandardsandTIA569

    Because ANSI/TIA-569-C is now a generic reference for pathways, specific requirements unique to an application will p y p q q ppbe specified in the application standard.

    For example, specific pathway and spaces requirements for commercial buildings will be specified in ANSI/TIA-568-C.1.

    Specific pathway and spaces requirements for healthcare facilities ill be specified in ANSI/TIA 1179facilities will be specified in ANSI/TIA-1179.

    Lets take a look!

    32

  • TIA1179HealthcareFacilitiesStandard

    Healthcarevs.Premises

    BroaderscopeofapplicationspecificIPdevices

    Sensitiveinstallationenvironment

    Largerpathways

    LargerTelecomRooms

    GreaterWorkstationdensities

  • UniqueCablingChallengesTIA1179HealthcareFacilitiesStandard

    Redundant and highdensity pathways (conduits cable

    UniqueCablingChallenges

    Redundantandhighdensitypathways(conduits,cabletray)

    HighlevelsofEMI,hightemperature,chemicalsandgasses may be presentgassesmaybepresent

    Cableselectiondependentonattributestocomplywithatmosphericconditions

    Cableselectionaffectspathways

    Applicationspecific,highterminationworkareadensities

    Stringentcodesandregulations

  • PathwayGuidelinesTIA1179HealthcareFacilitiesStandard

    P th h ld t i ti f

    PathwayGuidelines

    Pathwaysshouldnotcompromiseoperationofthefacility

    Enclosedpathwaysystems inairhandlingt t I f ti C t l R i tspacestomeetInfectionControlRequirements

    (ICR)

    Segregationofcablesfordifferentnetworks&li ti (d t f t t l )applications(duetosafetyprotocols)

  • E t F iliti (EF)&E i tR (ER)

    TIA1179HealthcareFacilitiesStandard

    EntranceFacilities(EF)&EquipmentRooms(ER)

    Routediversity twoseparatepathwaysfromtheentrancefacilitytotheequipmentroom

    Demarcation point of outside access providers may be determined Demarcationpointofoutsideaccessprovidersmaybedeterminedbyfederalorlocalregulations.

    Accommodationofothersystemsmayincreasesize(BAS,nursecall security CATV biomedical systems)call,security,CATV,biomedicalsystems)

    Twicethesizeofadata/telecommunicationscloset(allowingforfuturedoublegrowthrate)

  • TelecommunicationsRooms(TR)andTelecomEnclosures(TE)

    TIA1179HealthcareFacilitiesStandard

    TelecommunicationsRooms(TR)andTelecomEnclosures(TE)

    Nontelecommunicationsservices(i.e.gasses,fluids)notallowed

    2 ( 2 ) LargerTRthanofficebuilding 12m2(130ft2)orlarger

    TEservessmallerfloorareaorwhereTRisnotallowed(beawareofexposureofmagneticfields,radiation,chemicals,etc)