project completion / ey @ block 23 shake shack … · shake shack santan village. project includes...

2
THE quarterly newsletter from hardison/downey construction /highlights 1707 E. Highland Ave., Suite 125 Phoenix, Arizona 85016 www.hardisondowney.com March 2020 PROJECT COMPLETION / SHAKE SHACK SANTAN VILLAGE Project includes new construction of a stand alone 3,100 SF wood-frame restaurant space at the southwest corner of the SanTan Village shopping center in Gilbert Arizona. The project includes 1,225 SF of dining area, 459 SF of open kitchen area viewable by the public and 641 SF of open seating covered patio area with gas heaters and a misting system. The interior finishes are a mix of reclaimed wood panels, ATAS metal panels, and drywall. The unique exterior finishes showcase Resysta Board tongue and groove siding, curtain wall glass systems, and ATAS corrugated metal panels. PROJECT COMPLETION / EY @ BLOCK 23 Project includes a full floor phased renovation of 15,300 SF in a brand new office building for a multinational professional services accounting firm. This project features open and private office space, phone rooms, a break room, team rooms, a large training room with an operable partition. The project also includes LED lighting, new flooring and high end finishes throughout. PROJECT UPDATES OWNER: Shake Shack ARCHITECT: zebra Projects LOCATION: Gilbert, Arizona SIZE: 3,100 SF OWNER: EY ARCHITECT: Gensler LOCATION: Phoenix, Arizona SIZE: 15,300 SF

Upload: others

Post on 19-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT COMPLETION / EY @ BLOCK 23 SHAKE SHACK … · SHAKE SHACK SANTAN VILLAGE. Project includes new construction of a stand alone 3,100 SF wood-frame restaurant . space at the

THE quarterly newsletter from hardison/downey construction

/highlights

1707 E. Highland Ave., Suite 125Phoenix, Arizona 85016

www.hardisondowney.com

March 2020

PROJECT COMPLETION / SHAKE SHACK SANTAN VILLAGE

Project includes new construction of a stand alone 3,100 SF wood-frame restaurant space at the southwest corner of the SanTan Village shopping center in Gilbert Arizona. The project includes 1,225 SF of dining area, 459 SF of open kitchen area viewable by the public and 641 SF of open seating covered patio area with gas heaters and a misting system. The interior finishes are a mix of reclaimed wood panels, ATAS metal panels, and drywall. The unique exterior finishes showcase Resysta Board tongue and groove siding, curtain wall glass systems, and ATAS corrugated metal panels.

PROJECT COMPLETION / EY @ BLOCK 23

Project includes a full floor phased renovation of 15,300 SF in a brand new office building for a multinational professional services accounting firm. This project features open and private office space, phone rooms, a break room, team rooms, a large training room with an operable partition. The project also includes LED lighting, new flooring and high end finishes throughout.

PROJECT UPDATES

OWNER: Shake Shack

ARCHITECT: zebra Projects

LOCATION: Gilbert, Arizona

SIZE: 3,100 SF

OWNER: EY

ARCHITECT: Gensler

LOCATION: Phoenix, Arizona

SIZE: 15,300 SF

Page 2: PROJECT COMPLETION / EY @ BLOCK 23 SHAKE SHACK … · SHAKE SHACK SANTAN VILLAGE. Project includes new construction of a stand alone 3,100 SF wood-frame restaurant . space at the

THE quarterly newsletter from hardison/downey construction

/highlights

1707 E. Highland Ave., Suite 125Phoenix, Arizona 85016

www.hardisondowney.com

March 2020

If you have any comments, questions or other feedback, or to unsubscribe, please email [email protected] more frequent hardison/downey updates, check out our social media pages.

COMPANY NEWS

FEATURED EMPLOYEE

10 THINGS YOU DIDN’T KNOW ABOUT BRUCE FLATNESS [SR. PROJECT SUPERINTENDENT]

BUILD FORE GOOD NETS $83K FOR TEACH FOR AMERICAIn November 2019, Kitchell and hardison/downey hosted our seventh annual Build FORE Good (BFG) golf tournament, raising $83,700 for the Teach for America Phoenix chapter. BFG is a day dedicated to having fun and raising money for local nonprofits in a beautiful, unpretentious setting at the pristine Kierland golf course. Over the course of seven years the event has raised more than $700,000 for local nonprofits. And despite those who think this is just a play day outdoors during Arizona’s beautiful fall weather, it is in fact a lot of hard work! The event requires months of advance planning, including soliciting our industry and trade partners to purchase sponsorships, making the fundraising portion of this possible (and gratifying for our sponsors).

This year’s event kicked off with cute kids from a Teach for America school leading everyone in the Pledge of Allegiance and high-fiving the golfers as they went to their assigned holes for the shotgun start.

The sold-out event had 216 golfers and is made possible with the help of 30-plus volunteers.

Teach For America is a leadership development organization that recruits remarkable, diverse college graduates and professionals to teach for at least two years in low-income communities, and supports them as lifelong leaders and advocates working from every sector and field to increase educational opportunities for students.

If you would like to participate as a player or sponsor next year, please contact [email protected].

See the video recap here.

h/d’s NEW DIGS

hardison/downey has relocated to 1707 E. Highland Ave. Suite 125, in Phoenix. Our awesome new office space is situated on the northeast corner of Kitchell’s Highland Campus, and features hybrid conventional/open office space programming.

1 I welcomed my first grandchild in January. 6 I am a huge Minnesota Vikings fan.

2 I have lived in the Valley of the Sun since 1982. 7 One of my favorite hobbies is desert four-wheeling.

3 My wife of 38 years and I have three children. 8 Anyone who knows me well, will tell you that I love Jazz.

4 I began my career in construction as a carpenter. 9 I am a lottery winner, yet still dedicated to work.

5 I am related to Calvin Coolidge - the 30th U.S. President. I enjoy participating in Goat Yoga (goats not sheep).10