AmountR
ItemNo
Quantity Rate
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
BILL NO 1
PRELIMINARIES
The agreement shall be the JBCC Series 2000 Principal Building Agreement prepared by the Joint Building Contract Committee, Edition 5(R1) Code 2101 © July 2007
PRINCIPAL BUILDING AGREEMENT
The preliminaries shall be the JBCC Series 2000 Preliminaries prepared by the Joint Building Contracts Committee, 3rd Edition Code 2103 © May 2005 and shall be deemed to be incorporated herein.
PRELIMINARIES
Except where otherwise stated these Bills of Quantities have been prepared in accordance with the Model Preambles for Trades (1999 Edition) as recommended and published by the Association of South African Quantity Surveyors.
MODEL PREAMBLES
Tenderers shall be deemed to have referred to the aforementioned documents for the full intent and meaning of each clause. These clauses are hereinafter referred to by the heading and clause number only.
FULL INTENT AND MEANING OF CLAUSES
Where standard clauses or alternatives are not entirely applicable to this contract documents, such modifications, corrections or supplements as will apply are given under each relevant clause heading.
Where any item is not relevant to this specific contract such item is marked N/A (signifying "not applicable").
-1-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
Tenderers are referred to the abovementioned documents for the full intent and meaning of each clause thereof (hereinafter referred to by heading and clause number only). Tenderers shall allow apposite each clause for any cost involved with complying with such clause. Any clauses left unpriced shall be deemed to be covered by rates and prices elsewhere incorporated throughout these bills of quantities.
PRICING OF CLAUSES
Should 'Alternative A', as set out within clause 10.3 hereinafter, be used for the adjustment of preliminaries then each item priced is to be allocated to one or more categories by the insertion of the letter "F", "V" or "T", as the case may be, against the price in the "Rate" column. These letters shall indicate the relevant categories as follows :
PAYMENT CATEGORIES
"F" - Denotes a fixed amount which shall not be varied
"V" - Denotes an amount which shall be varied in proportion to the contract value
"T" - Denotes an amount which shall be varied in proportion to time
SECTION A : JBCC PRINCIPAL BUILDING AGREEMENT
ItemDefinitions and interpretation
Clause 1.01
DEFINITIONS AND INTERPRETATION
ItemOffer, acceptance and performance
Clause 2.02
OBJECTIVE AND PREPARATION
ItemDocuments
Clause 3.03
-2-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
ItemDesign responsibility
Clause 4.01
ItemEmployer's agents
Clause 5.02
ItemSite representative
Clause 6.03
ItemCompliance with regulations
Clause 7.04
Item
Works risk
Clause 8.0
5
ItemIndemnities
Clause 9.06
ItemWorks insurances
Clause 10.07
ItemLiability insurances
Clause 11.08
ItemEffecting insurances
Clause 12.09
N/ANo Clause
Clause 13.010
ItemSecurity
Clause 14.011
ItemPreparation for and execution of the works
Clause 15.012
EXECUTION
ItemAccess to the works
Clause 16.013
ItemContract instructions
Clause 17.014
-3-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
ItemSetting out of the works
Clause 18.01
ItemAssignment
Clause 19.02
ItemNominated subcontractors
Clause 20.03
ItemSelected subcontractors
Clause 21.04
ItemEmployer's direct contractors
Clause 22.05
ItemContractor's domestic subcontractors
Clause 23.06
Item
Practical completion
Clause 24.0
7
COMPLETION
ItemWorks completion
Clause 25.08
Item
Final completion
The contractor shall attend to defects during the defects liability period on a progressive basis, to the satisfaction of the principal agent, and will not be permitted to wait until the end of the defects liability period or until the amount of defects accumulates in order to attend to a comprehensive list of defects.
Clause 26.0
9
ItemLatent defects liability period
Clause 27.010
ItemSectional completion
Clause 28.011
-4-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
Item
Revision of date for practical completionClause 29.6 has been amended by the addition of Clause 29.6.4:“A motivation in terms of the approved programme and supporting documentation as required in Clause 4.2 of Section B: JBCC Preliminaries”
Clause 29.0
1
Item
Penalty for noncompletionAll references to "practical completion" in clause 30.1 should be amended to read "practical completion and works completion".
Clause 30.0
2
Item
Interim payment to the contractor
Clause 31.9 is amended by the deletion of "...within seven (7) calender days of the date of issue of the payment certificate. Payment shall be subject to the contractor giving the employer a tax invoice for the amount due." and replacing with "within fourteen (14) calender days from the date of receipt of an original tax invoice reflecting the amount certified."
Clause 31.10 is amended by the deletion of "...of the date of practical completion" in the first sentence and replacing with "...of the date of final completion".
Clause 31.12 is amended by the deletion of "within seven (7) calender days" in the first sentence and replacing with "within fourteen (14) calender days"
Clause 31.0
3
PAYMENT
-5-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
Item
Adjustment to the contract value
Clause 32.10 is amended by the omission of "including a reasonable allowance for waste,"
Notwithstanding the provisions of clause 32.13 or any other clause all fluctuations in costs shall be for the account of the contractor.
The rates in these bills of quantities as priced by the contractor shall be fixed. The contractor is to make due allowance for any price increases in his tender and in the rates in the bills of quantities up to and including final completion.
Clause 32.0
1
ItemRecovery of expense and loss
Clause 33.02
Item
Final account and final payment
Clause 34.10 is amended by the deletion of "within seven (7) calender days of the date of issue of the final payment certificate subject to the contractor giving the employer a tax invoice for the amount due" and replacing with "within fourteen (14) calender days from the date of receipt of an original tax invoice reflecting the amount reflected in the final payment certificate."
Clause 34.13 is amended by the deletion of "within seven (7) calender days" in the first sentence and replacing with "within fourteen (14) calender days"
Clause 34.0
3
ItemPayment to other parties
Clause 35.04
ItemCancellation by employer - contractor's default
Clause 36.05
CANCELLATION
ItemCancellation by employer - loss and damage
Clause 37.06
-6-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
ItemCancellation by contractor - employer's default
Clause 38.01
ItemCancellation - cessation of the works
Clause 39.02
ItemDispute settlement
Clause 40.03
DISPUTE
ItemState clauses
Clause 41.04
SUBSTITUTE PROVISIONS
-7-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
CONTRACT VARIABLES
Information necessary for completion of those clauses contained in the schedule, as necessary for tender purposes, is given hereunder:
THE SCHEDULE
ItemPre-tender information
Clause 42.01
Clause
42.1 CONTRACTING AND OTHER PARTIES
42.1.1 Employer: Vaal University of Technology
Domicilium:Andries Potgieter Blvd, Vanderbijl-
park, 1911
Telephone: +27 11Fax: +27 11
42.1.2 Principal Agent:Organic
Architects
Telephone: +27Fax: +27Email:
42.1.3 Agent (1):Organic
Architect
Agent's service:
Telephone: +27Fax: +27Email:
-8-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
950 9000
11 886 2171
11 886 2171
Architecture
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
42.1.4 Agent (2): Bakhele Consulting CC
Agent's service: Quantity Surveyor
Domicilium: 26 Tecoma PlaceCountry ViewMindrand1685
Telephone: +27 (11) 318 5069 Fax: +27 (11) 318 3033E-mail
42.1.5 Agent (3):
Agent's service:
Domicilium:
Telephone: +27Fax: +27 Email:
-9-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
42.2 CONTRACT DETAILS
42.2.1 Works description:
Ablution Facilities are renovated on the Vanderbijl Main
Campus of the VUT in Blocks A,B,E,F,J,K,M & U
The Gross Construction Area is 44 AblutionBlocks
42.2.2 Site description:
The works is split in three phases. Phase 1
covering the ablutions in Blocks A1,A3, A4,B1,
B2, E2 & E3. Phase 2 covers the ablutions in
Blocks E1, G, M & U. Phase 3 covers the ablu-
tions in Blocks F & K as well as Paraplegic
ablutions in blocks F & G.
42.2.3 Work or installations by direct contractors:
N/A
42.2.4 Specific options that are applicable to Stateorgan
only:
Not Applicable
42.2.5 Possession of the site is intended to be givenon:
TBA
42.2.6 Period for the commencement of the worksafter
the contractor takes possession of the site:
TBA
-10-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
42.2.7 Intended date of practical completion and thepenalty per calendar day for:
Practical completion for the works as a whole:
Date:Six (6) months after contractual com-mencement datePenalty: 0.05% of contract amount per calender
day
42.2.8 Intended date of practical completion and thepenalties per calendar day for:
The works in sections:
Not Applicable
42.2.9 The law applicable to this agreement shall bethat of:
Republic of South Africa
42.3 INSURANCES
42.3.1 Contract works insurance to be effected by:
Contractor
10% Retention
42.3.2 Supplementary insurance is required:
No
42.3.3 Public liability insurance to be effected by:
Contractor
For the sum of:
With a deductible of:
42.4 DOCUMENTS
-11-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
42.4.1 Waiver of the contractor's lien or right of continuing possesion is required:
Yes
42.4.2 Construction document copies to be supplied to the contractor free of charge:
Number of : 3
Any additional copies required by the contractor to be paid directly by the contractor.
42.4.3 Bills of quantities drawn up in accordance with:
The Standard System of Measuring Building Work (6th Edition Revised)
42.4.4 On acceptance of the tender the priced bills of
quantities is to be submitted simultaneously
42.4.5 JBCC Engineering General Conditions are to be included in the contract documents:
No
42.4.6 The contract value is to be adjusted using escalation adjustment indices:
No - All rates to be fixed
-12-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
42.4.7 Details of changes made to the provision of JBCC Series 2000 standard documentation.
A. Principal Building Agreement
Clause 7.0 Note addedClause 25.0 Sub-clause deletedClause 26.0 Note addedClause 29.6 Sub-clause addedClause 30.0 AmendedClause 31.9 AmendedClause 31.10 AmendedClause 31.12 AmendedClause 32.0 Note addedClause 32.6 AmendedClause 32.10 AmendedClause 32.13 Note addedClause 34.10 AmendedClause 34.13 Amended
B. JBCC Preliminaries
Clause 2.2 Note addedClause 4.2 Note addedClause 8.1 AmendedClause 9.2 Amended
Post tender information
Post tender information shall be completed based on consultation with the contractor.
-13-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
SECTION B : JBCC PRELIMINARIES
ItemDefinitions and interpretation
Clause 1.01
1.0 DEFINITIONS AND INTERPRETATION
ItemChecking of documents
Clause 2.12
2.0 DOCUMENTS
Item
Provisional bills of quantitiesThe Bills of Quantities shall not be used for ordering purposes
Clause 2.2
3
ItemAvailability of construction documentation
Clause 2.34
ItemInterest of agents
Clause 2.45
ItemPriced documents
Clause 2.56
ItemTender submission
Clause 2.67
ItemDefined works area
Clause 3.18
3.0 THE SITE
ItemGeotechnical investigation
Clause 3.29
ItemInspection of the site
Clause 3.310
N/AExisting premises occupied
Clause 3.411
N/APrevious work - dimensional accuracy
Clause 3.512
-14-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
N/APrevious work - defects
Clause 3.61
ItemServices - known
Clause 3.72
ItemServices - unknown
Clause 3.83
ItemProtection of trees
Clause 3.94
ItemArticles of value
Clause 3.105
ItemInspection of adjoining properties
Clause 3.116
ItemManagement of the works
Clause 4.17
4.0 MANAGEMENT OF CONTRACT
ItemProgramme for the works
Clause 4.28
ItemProgress meetings
Clause 4.39
ItemTechnical meetings
Clause 4.410
ItemSamples of materials
Clause 5.111
5.0 SAMPLES AND SHOP DRAWINGS
ItemWorkmanship samples
Clause 5.212
ItemShop drawings
Clause 5.313
-15-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
ItemDeposits and fees
Clause 6.11
6.0 TEMPORARY WORKS AND PLANT
ItemEnclosure of the works Clause 6.2
2
ItemAdvertising
Clause 6.33
ItemPlant, equipment, sheds and offices
Clause 6.44
ItemMain notice board
Clause 6.55
ItemSubcontractor's notice board
Clause 6.66
ItemLocation
Clause 7.17
7.0 TEMPORARY SERVICES
ItemWater
Clause 7.28
ItemElectricity
Clause 7.39
ItemTelecommunication equipment
Clause 7.410
ItemAblution facilities
Clause 7.511
-16-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
Item
Responsibility for prime cost amounts
Clause 8.1 is amended by the omission of "hoisting and fixing" in the second sentence and replacing with "hoisting, wastage and fixing".
Clause 8.1 is further amended by deletion of "The contract documents shall make provision for the contractor to separately price" in the second sentence and replacing with "The contractor shall include in the rate for relevant item".
Clause 8.1
1
8.0 PRIME COST AMOUNTS
ItemGeneral attendance
Clause 9.12
9.0 ATTENDANCE ON N/S SUBCONTRACTORS
Item
Special attendance
The last three words contained within Clause 9.2, i.e. "...in the schedule", shall be deleted and replaced by "...within the relevant item incorporated in these Bills of Quantities."
Clause 9.2
3
ItemCommissioning - fuel, water and power
Clause 9.34
ItemStatutory taxes, duties and levies
Clause 10.15
10.0 FINANCIAL ASPECTS
ItemPayment of preliminaries
Clause 10.26
ItemAdjustment of preliminaries
Clause 10.37
ItemPayment certificate cash flow
Clause 10.48
-17-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
ItemContractor information supply
Clause 10.51
ItemProtection of the works
Clause 11.12
11.0 GENERAL
Item
Protection/isolation of existing/sectionally occupied works
Clause 11.2
3
ItemSite security
Clause 11.34
ItemNotice before covering work
Clause 11.45
ItemDisturbance
Clause 11.56
ItemWorks cleaning and clearing
Clause 11.67
ItemVermin
Clause 11.78
ItemOverhand work
Clause 11.89
Information necessary for completion of those clauses contained in the schedules, as necessary for tender purposes, is given hereunder.
12.0 SCHEDULE OF VARIABLES
ItemPre-tender information
Clause 12.110
Clause(and reference)
-18-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
12.1.1 Provisional bills of quantities(2.2) The quantities are provisional
Yes
12.1.2 Availability of construction documentation(2.3) Construction documentation is not complete
Yes
12.1.3 Interests of agents
12.1.4 Defined works area(3.1) Details:
Tenderers shall establish by personal viewing of the site conditions any restrictions and limited means of access and the like.
The area of the works to be occupied by the contractor, any restriction to the area and the limit of access or exit will be pointed out to the contractor by the principal agent on handing over of the site.
12.1.5 Geotechnical investigation
12.1.6 Existing premises occupied(3.4) Specific requirements:
Not Applicable
12.1.7 Services known(3.7) Details:
All known services will be pointed out at the site inspection/site hand over meeting.
12.1.8 Protection of trees(3.9) Specific requirements:
Not Applicable
-19-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
12.1.9 Inspection of adjoining properties(3.11) Specific requirements:
No additional specific requirements
12.1.10 Enclosure of the works(6.2) Specific requirements:
The contractor to supply suitable barriers around the site to protect the general public and parked motors from building activities
12.1.11 Offices(6.4.3) Specific requirements:
The Contractor to provide facility for both a consultants office on site and a boardroom to accommodate 10 people.
12.1.12 Main notice board(6.5) Specific requirements:
A standard notice board will be required.
12.1.13 Subcontractors notice board(6.6) A notice board is required:
No
12.1.14 Water(7.2) Alternative selected:
Alternative C
12.1.15 Electricity(7.3) Alternative selected:
Alternative C
12.1.16 Telecommunications(7.4) Alternative selected:
Alternative B
-20-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
12.1.17 Ablution facilities(7.5) Alternative selected:
Alternative A
12.1.18 Special attendance(9.2) Subcontractor details:
No additional requirements
12.1.19 Protection of the works(11.1) Specific requirements:
Not Applicable
12.1.20 Protection of existing/sectionally occupied works(11.2) Protection is required:
Not applicable
12.1.21 Disturbance(11.5) Specific requirements:
SECTION C : SPECIFIC PRELIMINARIES
SUPPLEMENTARY DOCUMENTATION
Item
The position of construction breaks and the extent of individual concrete pours are to be recorded by the contractor on the structural engineer's drawings and are to be submitted to the principal agent and the structural engineer for their records.
1
As built drawings
Item
Contract instructions issued on site are to be recorded in triplicate in an instruction book which is to be maintained on site by the contractor.
2
Contract instructions
-21-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
Item
The contractor shall not cede or assign his rights or claims to any monies due or to become due under this contract
1
Non cession of monies
Item
At the end of each week the contractor shall provide the principal agent with a written record, in schedule form, reflecting the number and description of tradesmen and labourers employed by him and all subcontractors on the works each day.
2
Labour record
Item
At the end of each week the contractor shall provide the principal agent with a written record, in schedule form, reflecting the number, type and capacity of all plant, excluding hand tools, currently used on the works.
3
Plant record
-22-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
MATERIALS AND WORKMANSHIP
Item
The contractor shall take delivery of, handle, store, use, apply and/or fix all proprietary branded products in strict accordance with the manufacturer's instructions after consultation with the manufacturer's authorised representitive
1
Proprietary branded products
Item
The contractor warrants and undertakes in favour of the employer that:
Insofar as the works or any part of the works has been or will be designed by him, he will exercise reasonable, due and proper skill and care in such design.
Insofar as any part of the materials and goods for the works has been or will be selected by him, he will exercise due and proper skill and care in such selection of materials and goods.
He is suitably qualified and competent to carry out such design work and selection of materials and goods.
He shall comply with and satisfy any performance specification or requirements insofar as such performance specification or requirements are included or referred to in the sub-contract.
2
Warranty for design and materials
-23-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
Item
The contractor shall obtain written guarantees where called for, addressed to the employer, from the firms supplying the materials or doing the work and deliver such guarantees to the principal agent.
The guarantees shall state that workmanship, materials and installation are guaranteed for a specified period reckoned from the date of practical completion of the works and that any defects in the workmanship, materials and installation that may arise during that period shall be made good at the expense of the firm doing the work upon written notice from the principal agent or the employer to do so.
Guarantees
Item
The contractor shall give notice to the principal agent of his intention to cover up any work or materials with earth or other material in order that the principal agent may inspect same before they are so covered.
In default of such notice being received such work or materials shall be uncovered and later made good at the contractor's expense.
1
Notice before covering up
FINANCIAL ASPECTS
Item
The additional costs of overtime work shall be for the employer's account only when prior written agreement thereto is given by the principal agent.
2
Overtime
GENERAL
Item
The ownership of the copyright in and to all drawings, specifications, models and documents of any nature delivered to the contractor or produced by or on behalf of the contractor in connection with the works; and, the artistic character and/or artistic design of the works, shall remain vested in and/or is hereby assigned to the employer by the contractor.
3
Copyright
-24-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
Item
As the project is of a highly confidential nature the contractor shall:
Treat all drawings, specifications, models and documents of any nature delivered to the contractor or produced by or on behalf of the contractor in connection with the works as being confidential.
Keep secret and not directly or indirectly disclose or divulge to any person (except insofar as may be necessary in connection with the project) any information contained in the contract documents without the previous written consent of the principal agent.
Not copy, photograph and/or repeat either wholly or in part any of the contract documents referred to above (except insofar as may be necessary in connection with the project); return to the principal agent all contract documents issued herewith upon submission of the tender; and, upon completion of the works deliver to the principal agent all contract documents of any nature pertaining to the project.
1
Confidentiality
-25-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1Total Brought Forward from Page No.
PRELIMINARIES
Bill No. 1
AmountR
PageNo
COLLECTION
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
-26-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Collection R
PRELIMINARIES
Bill No. 1
AmountR
PageNo
COLLECTION
Brought Forward R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
25
24
23
22
21Total Brought Forward from Page No.
-27-
PRELIMINARIESBill No. 1Section No. 1
ORGANIC ARCHITECTS
Carried to Final Summary R
AmountR
ItemNo
Quantity Rate
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
BILL No 1
NOTE: Tenderers are advised to study the Model Preambles for Trades (Latest Edition) before pricing this bill
ALTERATIONS
NOTE: Unless otherwise stated herein, all items in this bill shall be deemed to be fixed priced for the duration of the contract
SUPPLEMENTARY PREAMBLES
In taking down and removing existing work the utmost care shall be observed to avoid any structural or other damage to the remaining portion of the building, equipment, etc. The contractor shall cover up and protect from injury all work, equipment, etc not removed and shall make good at his own expense any damage that may occur.
Protection of existing work, equipment, etc
TEMPORARY BARRIERS, SCREENS, ETC
Item
Provide and erect all casings, dust protection and protections for and cover up all existing fittings, equipment, doors, windows, joinery work, walls, floors, etc not disturbed during the alterations and clear away and make good on completion
1
Temporary barriers, screens, etc including removal
A : 0.00 C : 0.00 D : 0.00 J : 1.00
W : 0.00
REMOVAL OF EXISTING WORK
-28-
ALTERATIONSBill No. 1Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
25m²Half brick wall1
Breaking down and removing brickwork etc
A : 25 C : 0 D : 0 J : 0
W : 0
m²One brick wall2
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²230 x 230 x 105mm Concrete breeze blocks in walls3
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
NoTimber single door and frame 813 x 2032mm high4
Taking out and removing doors, windows, etc from brickwork to be demolished
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
No
1200 x 1500mm high New steel windows to match existing.
5
Taking out and removing doors, windows, etc from brickwork including preparing all trades for new
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
No813 x 2032mm High overall single door and steel frame from one brick wall
6
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
No1600 x 2032mm high steel framed double door7
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
No2400 x 2200mm high doors tip up garage doors8
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
-29-
ALTERATIONSBill No. 1Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
No813 x 2032mm High overall single door and steel frame from one brick wall
1
Taking out and removing doors, windows, etc from brickwork including making good finishes to match existing
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
No813 x 2032mm High overall single door and steel frame from one brick wall
2
Taking out and removing doors, windows, etc. including thresholds, sills, etc and building up openings in brick walls including making good plaster on both sides and into reveals and concrete thresholds with steel trowelled finish (making good paintwork elsewhere)
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
No813 x 2032mm High overall single door and steel frame from one brick wall
3
Taking out and removing doors, windows, etc. including thresholds, sills, etc and building up openings in brick walls including making good both face brick work on the outside and plaster on the inside and into reveals and concrete thresholds with steel trowelled finish (making good paintwork elsewhere)
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
No1511 x 2100mm High overall steel window from one brick wall
4
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
NoService ironmongery to doors5
Servicing of exitsing ironmongery to doors, windows, etc
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
-30-
ALTERATIONSBill No. 1Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
NoServicing of ironmongey to windows1
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Ceilings including brandering/suspension system, etc2
Taking down and removing roofs, floors, panelling, ceilings, partitions, etc including preparing all trades for new
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
mCornice3
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
mDry wall partition4
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Asbestos ceilings5
Carefully taking down and removing aesbestos ceilings and safely disposing in accordance with the relevant regulations
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
mAesbestos cornice6
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²On ceilings7
Allowance for detecting water stain source to existing ceiling
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Vinyl floor covering8
Taking up and removing vinyl floor coverings, carpeting, etc and preparing all trades for new
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
-31-
ALTERATIONSBill No. 1Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
m²Carpet tile floor covering1
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Epoxy floor finish2
Remove existing epoxy floor finish, degrease, and preapre all trades for new epoxy finish.
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Tiles to floors3
Hacking up and removing ceramic tile floor and wall finishes including removing mortar bed or backing and preparing concrete or brick surfaces for new tile finishes
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Tiles to walls4
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
No800 x 800mm wide shower troughs on floors5
Taking up and removing 800 x 800mm wide ceramic shower troughs including disconnecting piping from fittings, repairing and preparing concrete and screed for new floor coverings
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
No1000 x 2500mm long concrete troughs and taps, fill up floor trenches and make good.
6
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
No3500 x 900mm wide x 400mm high overall steel flat platform on floors
7
Taking out and removing sundry metalwork
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
-32-
ALTERATIONSBill No. 1Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
NoVertical flat steel sheets 1700 x 1000mm high on walls1
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
NoStainless steel sink and drainer on timber cupboard 1000 x 500 x 900mm high
2
Taking out and removing piping, sanitary fittings, etc including disconnecting piping from fittings and making good floor and wall finishes (making good tiling and paintwork elsewhere)
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
NoVitreous china wash hand basin3
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
NoVitreous china WC pan with cistern4
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
NoVitreous china wall hung urinal with flush valve5
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
NoShower heads and taps, etc6
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
NoMirror 400 x 500mm high from wall7
Carefully taking out and removing glass and mirrors and setting aside including re-fixing later in new position elsewhere
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
BUILDING UP OPENINGS
-33-
ALTERATIONSBill No. 1Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
m²One brick walls1
Brickwork in NFP bricks to match existing in class II mortar in building up openings and finishes to match existing
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Half brick walls2
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
mMaking good brickwork to face of wall where half brick cross wall was removed
3
MAKING GOOD OF FINISHES ETC
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
mMaking good brickwork to face of wall where one brick cross wall was removed
4
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
mCutting toothings and bonding new brickwork to existing5
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Suspended ceiling tiles, suspension grid,etc6
Clean existing suspended ceiling tiles with a suitable agent
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
mWalls where half brick walls were removed7
Making good floors to match existing
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
PREPARATORY WORK TO EXISTING SURFACES
-34-
ALTERATIONSBill No. 1Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
m²On floors1
Clean down floor surfaces with " Plascon" concrete etcher and seal all joints, cracks, etc on existing concrete floor
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²On Ceilings2
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
mTrim timber door leaf3
Carefully trim 20mm deep to the bottom of existing timber door leaf to form air inlet
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Timber partitions4
Sand down existing timber partitions and re-seal
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
mTimber doors5
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Timber doors6
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Rub down existing concrete soffit and prepare to receive paint
7
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Strip-off and clean down paint from existing handrails8
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
-35-
ALTERATIONSBill No. 1Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
No300 x 400mm high openings in doors1
Form openings in new timber door leafs for 400 x 300 mm high grille(grilles to be installed by Others)
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
No300 x 400mm high openings in doors2
Form openings in existing timber door leafs for 400 x 300 mm high grille(grilles to be installed by Others)
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
mCut back screed 200mm on each side of crack down to bare concrete
3
The following in floor crack repairs:
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
mNail in Valmatex metal lathing (REF 315) x 150mm wide using Hilti nails at 250mm centres each side
4
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Screed in patches where cracks were repaired5
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
CLEANING TO EXISTING SURFACES
m²Suspended ceiling tiles6
Steam clean existing suspended ceiling tiles including suspension grid with a suitable cleaning agent
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
-36-
ALTERATIONSBill No. 1Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
m²Concrete floors1
Chemically clean existing screed of grease with a suitable cleaning agent including fixing/filling cracksand crevices
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Plastered walls2
Chemically clean existing walls of grease with a suitable cleaning agent including fixing/filling cracksand crevices and making good finishes to match existing
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Face brick walls3
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Plastered walls4
Rub down, clean, patch and repair plsater including preparing all trades for new finishes
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Steel windows5
Sand and clean down existing paint from existing windows including preparing all trades for new paint (X1)
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m
Thoroughly clean all window sills and reseal all joints and junctions.
6
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
OPENINGS THROUGH EXISTING WALLS ETC
-37-
ALTERATIONSBill No. 1Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
No
Altering opening in one brick wall where 1800 x 2600mm high concrete breeze block were removed to form opening for new single door and frame size 813 x 2032mm high overall by building in brickwork on one side and at the top including necessary precast concrete lintel and making good plaster on the inside and face brick work on the outside to match existing(new door and frame and making good paintwork elsewhere)
1
Altering openings
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
NoOpening 813 x 2032mm high through one brick wall2
Breaking out for and forming openings through brick walls for doors and frames, etc including necessary precast concrete lintels and making good plaster on both sides and into reveals and concrete thresholds with steel trowelled finish (doors and frames and making good paintwork elsewhere)
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
NoOpening 950 x 1895mm high through one brick wall3
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
NoOpening 813 x 2032mm high through one brick wall4
Breaking out for and forming openings through brick walls for doors and frames, etc including necessary precast concrete lintels and making good plaster on one side and facebrick to match existing on the other side and into reveals and concrete thresholds with steel trowelled finish (doors and frames and making good paintwork elsewhere)
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
-38-
ALTERATIONSBill No. 1Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
Item
Allow the provisional sum of R7 500(Seven Thousand Five Hundred Rand) nett for repairs to damaged gutters, down pipes, etc to be measured and priced in accordance with these Bills of Quantities and omitted in part or whole as instructed by the Architect
1
SUNDRY BUILDERS WORK
A : 0.00 C : 0.00 D : 0.00 J : 0.00
W : 0.00
Item
Allow the provisional sum of R45 000(Forty Five Thousand Rand) nett for Sundry Builders work to be measured and priced in accordance with these Bills of Quantities and omitted in part or whole as instructed by the Architect
2
A : 0.00 C : 0.00 D : 0.00 J : 0.00
W : 0.00
-39-
ALTERATIONSBill No. 1Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
ALTERATIONS
Bill No. 1
AmountR
PageNo
COLLECTION
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
39
38
37
36
35
34
33
32
31
30
29
28Total Brought Forward from Page No.
-40-
ALTERATIONSBill No. 1Section No. 2
ORGANIC ARCHITECTS
Carried to Summary R
AmountR
ItemNo
Quantity Rate
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
BILL NO 2
MASONRY
SUPPLEMENTARY PREAMBLES
BRICKWORK
Where sizes in descriptions are given in brick units, "one brick" shall represent the length and "half brick" the width of a brick
Sizes in descriptions
Descriptions of hollow walls shall be deemed to include wall ties and leaving every fifth perpend of the bottom course of the external skin open as a weep hole
Hollow walls etc
Lintels shall bear at least 160mm onto adjacent walling. Where such bearing cannot be obtained due to the proximity of adjacent openings the lintel shall be continuous
Reinforced brick lintels
Bricks shall be ordered timeously to obtain uniformity in size and colour
Face bricks
Descriptions of recessed pointing to fair face brickwork and face brickwork shall be deemed to include square recessed, hollow recessed, weathered pointing, etc
Pointing
SUPERSTRUCTURE
25m²Half brick walls1
Brickwork of NFP bricks in class II mortar
A : 25 C : 0 D : 0 J : 0
W : 0
-41-
MASONRYBill No. 2Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
72m75mm Wide reinforcement built in horizontally1
Brickwork reinforcement
A : 72 C : 0 D : 0 J : 0
W : 0
-42-
MASONRYBill No. 2Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
MASONRY
Bill No. 2
AmountR
PageNo
COLLECTION
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
42
41Total Brought Forward from Page No.
-43-
MASONRYBill No. 2Section No. 2
ORGANIC ARCHITECTS
Carried to Summary R
AmountR
ItemNo
Quantity Rate
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
BILL NO 3
WATERPROOFING
Waterproofing Waterproofing of roofs, basements, etc shall be laid under a ten year guarantee. Waterproofing to roofs shall be laid to even falls to outlets etc with necessary ridges, hips and valleys. Descriptions of sheet or membrane waterproofing shall be deemed to include additional labour to turn-ups and turn-downs
SUPPLEMENTARY PREAMBLES
DAMPPROOFING OF WALLS AND FLOORS
m²In walls1
One layer of 375 micron "Consol Plastics Brikgrip DPC" embossed damp proof course
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
2,022m²On walls2
"Tal Superflex" waterproofing slurry or or equal approved
A : 414 C : 864 D : 744 J : 0
W : 0
529m²On floors3
A : 105 C : 224 D : 200 J : 0
W : 0
-44-
WATERPROOFINGBill No. 3Section No. 2
ORGANIC ARCHITECTS
Carried to Summary R
AmountR
ItemNo
Quantity Rate
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
BILL NO 4
CARPENTRY AND JOINERY
Plate nailed timber roof truss construction
The following is applicable in respect of roof trusses:
Trusses are at maximum 1,20m centres. Roof covering is 0,6mm IBR profile sheeting on 50 x 75mm purlins. Ceilings are 6,4mm skimmed gypsum plasterboard sheeting on 38 x 38mm brandering. The references given in the descriptions refer to the respective types of trusses detailed on the architect's drawing numbered H100/015 accompanying these bills of quantities. The dimensions in the descriptions of the trusses are nominal and actual measurements shall be obtained from the architect and/or the site before design or fabrication commences
SUPPLEMENTARY PREAMBLES
Joinery
Descriptions of frames shall be deemed to include frames, transomes, mullions, rails, etc
Descriptions of hardwood joinery shall be deemed to include pelleting of bolt holes
Fixing
Items described as "nailed" shall be deemed to be fixed with hardened steel nails or shot pins to brickwork or concrete
Decorative laminate finish
Laminate finish shall be glued under pressure. Edge strips shall be butt jointed at junctions with adjacent similar finish
DOORS, ETC
-45-
CARPENTRY AND JOINERYBill No. 4Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
20No44mm Door 1000 x 2100m high (D01)1
Semi-solid flush doors with hardwoowd on both sides and two concealed edges hung to steel frames
A : 4 C : 8 D : 8 J : 0
W : 0
92No44mm Door 760 x 2100m high (D03)2
A : 12 C : 48 D : 32 J : 0
W : 0
8No44mm Door 813 x 2100m high (D02)3
A : 8 C : 0 D : 0 J : 0
W : 0
-46-
CARPENTRY AND JOINERYBill No. 4Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
CARPENTRY AND JOINERY
Bill No. 4
AmountR
PageNo
COLLECTION
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
46
45Total Brought Forward from Page No.
-47-
CARPENTRY AND JOINERYBill No. 4Section No. 2
ORGANIC ARCHITECTS
Carried to Summary R
AmountR
ItemNo
Quantity Rate
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
BILL NO 5
CEILINGS, PARTITIONSAND ACCESS FLOORING
SUPPLEMENTARY PREAMBLES
Items described as "nailed" shall be deemed to be fixed with hardened steel nails or pins or shot pinned to brickwork or concrete
Descriptions
Items described as "plugged" shall be deemed to include screwing to fibre, plastic or metal plugs at not exceeding 600mm centres, and where described as "bolted", the bolts are measured elsewhere
Electric light fittings, diffusers, panels, etc generally are "lay in" units of the same dimensions as the suspension grid described and allowance shall be made accordingly for their support, inclusive of any flexibility in setting out that may be required (ceiling panels have not been deducted and pricing shall take cognisance thereof)
604m²50mm Insulation closely fitted and laid on top of brandering between roof timbers, etc
1
"Aerolite" insulation
A : 124 C : 240 D : 240 J : 0
W : 0
SUSPENDED CEILINGS
332m²Ceilings suspended not exceeding 1m below concrete soffits/truss
2
"Donn" 1200 x 600mm vinyl clad ceiling panels on pre painted exposed tee suspension system including main cross tees,angles, necessary hangers, grids, etc (Colour: white)
A : 41 C : 224 D : 67 J : 0
W : 0
-48-
CEILINGS ETCBill No. 5Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
244m"SM25" pre-painted cornices, nailed1
"Donn" cornices to suspended ceilings
A : 36 C : 168 D : 40 J : 0
W : 0
-49-
CEILINGS ETCBill No. 5Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
CEILINGS ETC
Bill No. 5
AmountR
PageNo
COLLECTION
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
49
48Total Brought Forward from Page No.
-50-
CEILINGS ETCBill No. 5Section No. 2
ORGANIC ARCHITECTS
Carried to Summary R
AmountR
ItemNo
Quantity Rate
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
BILL NO 6
FLOOR COVERINGS, PLASTIC LININGS, ETC
FLOOR COVERINGS
m²On floors1
2,5mm thick "Marley Eclipse" PUR heavy duty vinyl floor sheeting with welded joints laid in accordance with the manufacturers instructions
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
mTurn-ups over coves and up against walls not exceeding 500mm girth
2
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²On floors3
Vinyle floor tiles
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²On floors4
500 x 500mm "Belgotex Nexus Berber Point" 650 Grade carpet tiles (Colour: by Architect)
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
m²Broadloom carpets5
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
SKIRTINGS, NOSINGS, ETC
-51-
FLOOR COVERINGSBill No. 6Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
mFloorworX Extruda Black vinyl cove fillet size 8 x 22mm high (Colour Code : MCF22)
1
"Marley"
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
mFloorworX Extruda Black vinyl capping strip size 2 x 22mm high
2
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
mvinyl skirting3
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
POLISH, SEALERS, ETC
m²Three coats FloorworX Sealer onto floor surface and allow to dry between applications
4
Three coats wax polish
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
-52-
FLOOR COVERINGSBill No. 6Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
FLOOR COVERINGS
Bill No. 6
AmountR
PageNo
COLLECTION
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
52
51Total Brought Forward from Page No.
-53-
FLOOR COVERINGSBill No. 6Section No. 2
ORGANIC ARCHITECTS
Carried to Summary R
AmountR
ItemNo
Quantity Rate
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
BILL NO 7
IRONMONGERY
SUPPLEMENTARY PREAMBLES
Where applicable finishes to ironmongery are indicated by suffixes in accordance with the following list: BS Satin bronze lacquered CH Chromium plated SC Satin chromium plated SE Silver enamelled GE Grey enamelled AS Anodised silver AB Anodised bronze AG Anodised gold ABL Anodised black PB Polished brass PL Polished and lacquered PT Epoxy coated SD Sanded
Finishes to ironmongery
HINGES, BOLTS, ETC
LOCKS
"Solid"
LOCKS
20NoThree lever mortice lockset1
"Union"
A : 4 C : 8 D : 8 J : 0
W : 0
96No293/E41 WC indicator bolt2
A : 16 C : 48 D : 32 J : 0
W : 0
HANDLES
20NoSet of pull handle fixed to door3
"Union"
A : 4 C : 8 D : 8 J : 0
W : 0
PUSH PLATES AND KICK PLATES
-54-
IRONMONGERYBill No. 7Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
40NoDKP-22-164 300 x150 x1,2mm blank polished stainless steel push plate
1
"Dorma" or equal approved
A : 8 C : 16 D : 16 J : 0
W : 0
40NoStainless plate 300mm x 900mm wide finished (size to be check on site)
2
Grade 304 Stainless steel kick plate 0,9mm thick countersunk screwed along edges at not exceeding 200mm centres
A : 8 C : 16 D : 16 J : 0
W : 0
DOOR CLOSERS
20No
TS73N/EN3-4 door closer with standard arm - Delayed
Closing
3
"Dorma" or equal approved
A : 4 C : 8 D : 8 J : 0
W : 0
LETTERS, NAMEPLATES, ETC
8NoDSS-130 stainless steel 150 x 150mm " Male" sign4
"Dorma" or equal approved
A : 0 C : 0 D : 8 J : 0
W : 0
12NoDSS-131 stainless steel 150 x 150mm "Female" sign5
A : 4 C : 8 D : 0 J : 0
W : 0
4NoDSS-133 stainless steel 150 x 150mm "Paraplegic" sign6
A : 4 C : 0 D : 0 J : 0
W : 0
BATHROOM FITTINGS
-55-
IRONMONGERYBill No. 7Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
20No soap dispenser1
"Kimberley-Clark" or equally approved
A : 4 C : 8 D : 8 J : 0
W : 0
4Nopaper towel disposer bin 2
A : 4 C : 0 D : 0 J : 0
W : 0
20Nomulti-folded paper towel dispensor 3
A : 4 C : 8 D : 8 J : 0
W : 0
20NoCondom Dispensers4
A : 4 C : 8 D : 8 J : 0
W : 0
64NoSanitary Bin5
A : 16 C : 48 D : 0 J : 0
W : 0
96No
TR3 3 Roll Toilet Roll Holder / Dispenser - Square - Stainless Steel. Order Code TRS0023. 130 x 390 x 140mm
6
Toilet Roll Holder / Dispenser
A : 16 C : 48 D : 32 J : 0
W : 0
8No304 Cisternback grabrail SR2 complete with fixning screws, wall plugs,etc
7
"Vaal Paragon"
A : 8 C : 0 D : 0 J : 0
W : 0
8No304 Stainless steel 'dog leg' grabrail DL2 complete with fixning screws, wall plugs,etc
8
A : 8 C : 0 D : 0 J : 0
W : 0
SUNDRIES
-56-
IRONMONGERYBill No. 7Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
24No38mm Diameter rubber door stop1
Approved
A : 8 C : 8 D : 8 J : 0
W : 0
-57-
IRONMONGERYBill No. 7Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
IRONMONGERY
Bill No. 7
AmountR
PageNo
COLLECTION
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
57
56
55
54Total Brought Forward from Page No.
-58-
IRONMONGERYBill No. 7Section No. 2
ORGANIC ARCHITECTS
Carried to Summary R
AmountR
ItemNo
Quantity Rate
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
BILL NO 8
METALWORK
Descriptions Descriptions of bolts shall be deemed to include nuts and washers Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete Metalwork described as "holed for bolt(s)" shall be deemed to exclude the bolts unless otherwise described
SUPPLEMENTARY PREAMBLES
PRESSED STEEL DOOR FRAMES
4NoFrame for door 1000 x 2032mm high (D1)1
1,2mm Double rebated frames suitable for half brick walls
A : 4 C : 0 D : 0 J : 0
W : 0
SHOWER CUBICLE DOORS
NoHinged door 900mm x 1800mm high2
"Showerflex" epoxy powder coated aluminium shower cubicle doors with sliding gear, cleats, stops, etc and 4mm toughened obscure safety glass, fixed to tiled walls
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
-59-
METALWORKBill No. 8Section No. 2
ORGANIC ARCHITECTS
Carried to Summary R
AmountR
ItemNo
Quantity Rate
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
BILL NO 9
PLASTERING
SUPPLEMENTARY PREAMBLES
SCREEDS
548m²Average 30mm thick on floors to falls1
Screeds wood floated on concrete
A : 124 C : 224 D : 200 J : 0
W : 0
INTERNAL PLASTER
2,032m²On walls2
Cement plaster on brickwork
A : 416 C : 872 D : 744 J : 0
W : 0
322m²On ceilings3
Gypsum skim plaster on concrete
A : 41 C : 224 D : 57 J : 0
W : 0
-60-
PLASTERINGBill No. 9Section No. 2
ORGANIC ARCHITECTS
Carried to Summary R
AmountR
ItemNo
Quantity Rate
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
BILL NO 10
TILING
Descriptions Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc shall be deemed to include 1:3 plaster bedding
SUPPLEMENTARY PREAMBLES
WALL TILING
20m²On walls1
75 x 150mm Subway
A : 4 C : 8 D : 8 J : 0
W : 0
38m²On walls2
Feature Wall tiles
A : 8 C : 15 D : 15 J : 0
W : 0
60m²On walls3
400 x 200mm Ceramic mabula grey
A : 12 C : 24 D : 24 J : 0
W : 0
2,041m²On walls4
400 x 200 x 5mm ceramic tiles fixed with adhesive to plaster Raj grey (plaster elsewhere)
A : 382 C : 847 D : 811 J : 0
W : 0
100m²On narrow widths5
A : 20 C : 40 D : 40 J : 0
W : 0
-61-
TILINGBill No. 10Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
FLOOR TILING
564m²On floors and landings in pattern1
Size 400 x 400mm Ceramic floor tiles fixed with adhesive to screed (screed elsewhere) and flush pointed with tinted waterproof jointing compound
A : 124 C : 224 D : 216 J : 0
W : 0
-62-
TILINGBill No. 10Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
TILING
Bill No. 10
AmountR
PageNo
COLLECTION
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
62
61Total Brought Forward from Page No.
-63-
TILINGBill No. 10Section No. 2
ORGANIC ARCHITECTS
Carried to Summary R
AmountR
ItemNo
Quantity Rate
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
BILL NO 11
PLUMBING AND DRAINAGE(PROVISIONAL)
SUPPLEMENTARY PREAMBLES
Sewer and drainage pipes and fittings shall be jointed and sealed with butyl rubber rings Soil, waste and vent pipes and fittings shall be solvent weld jointed
uPVC pipes and fittings
Pipes for water supply shall be of the class stated Pipes of 40mm diameter and smaller shall be plain ended with solvent welded uPVC loose sockets and fittings Pipes of 50mm diameter and greater shall have sockets and spigots with push-in type integral rubber ring joints. Bends shall be uPVC and all other fittings shall be cast iron, all with similar push-in type joints
uPVC pressure pipes and fittings
All soldered joints shall be wiped and brass unions shall be used for jointing lead to steel
Lead pipes and traps
Where fittings have reducing ends or branches they are described as "reducing". In the case of pipes with diameters not exceeding 60mm only the largest end or branch size is given. Should the contractor wish to use other fittings and bushes or reducers he may do so on the understanding that no claim in this regard will be entertained. In the case of pipes with diameters exceeding 60mm all sizes are given and no claim for extra bushes, reducers, etc will be entertained
Reducing fittings
-64-
PLUMBING AND DRAINAGEBill No. 11Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
Where no manufacturers' instructions exist pipes shall be laid in accordance with clauses 5.1 and 5.2 of each of the following:
SABS 1200 L : Medium-pressure pipelines LD : Sewers LE : Stormwater drainage
Pipe trenches etc shall be backfilled in accordance with clauses 3, 5.5, 5.6, 5.7 and 7 of SABS 1200 DB : Earthworks (Pipe trenches)
Pipes shall be bedded in accordance with clauses 3.1 to 3.4.1, 5.1 to 5.3 and 7 of SABS 1200 LB : Bedding (Pipes).
Unless otherwise described bedding of rigid pipes shall be class B bedding
Flush pans shall have straight or side outlets and "P" or "S" traps as necessary
Flush pans
Descriptions of waste unions shall be deemed to include rubber or vulcanite plugs and chains fixed to fittings
Waste unions
---------------
SOIL DRAINAGE
160m110mm Pipes in and including trenches not exceeding 1m deep
1
uPVC Pipes
A : 40 C : 0 D : 120 J : 0
W : 0
16No110mm End cap2
Extra over uPVC pipes for fittings
A : 16 C : 0 D : 0 J : 0
W : 0
-65-
PLUMBING AND DRAINAGEBill No. 11Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
No110mm Rodding eye1
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
No110mm Inspection eye2
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
32No110mm Bend3
A : 0 C : 0 D : 32 J : 0
W : 0
No100mm Gulley not exceeding 1000mm deep4
uPVC gulleys
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
SANITARY FITTINGS
60No
Vaal Sanitaryware ceramic fireclay 595 x 455mm
“Cameo” oval self-rimming vanity basin with three
semipunched tapholes
5
"Vaal"
A : 12 C : 24 D : 24 J : 0
W : 0
16No
"Vaal Sanitaryware" vitreous china wall hung "Lavatera" urinal with top inlet (Code: 704001) overall size 600 x 385 x 380mm supplied with 38mm CP domical grating (Code 8787), CP top inlet (Code 7041Z0) spreader, two hanging brackets (code 8127Z0), "Flush Master" FJ6000, etc complete
6
A : 0 C : 0 D : 16 J : 0
W : 0
-66-
PLUMBING AND DRAINAGEBill No. 11Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
96No
Vitreous china 6 litre “Hibiscus Elite Duct” cistern (code
7116DP), complete with lid, fitments, push button
mechanism, and duct flush pipe. Can be used with the
Orchid back inlet, can be used with the Orchid Wall
Hung back inlet pan, Parktown back inlet or any other
back inlet pan. The cistern is designed to flush
effectively on 6 litres subject to being installed with a
pan providing an effective 6 litre flush.
1
A : 16 C : 48 D : 32 J : 0
W : 0
4No
Colour White (Code: 775262) Charisma CC or paraplegic vitreous china close coupled suite comprising 90º outlet closed rim washdown pan fixed on and including floor bracket (Code: 8082Z0) with matching with matching 6 litre cistern top dual flush cistern including fitments and Thermoset Soft-Close seat
2
A : 4 C : 0 D : 0 J : 0
W : 0
No800 x 800 steel shower tray with patterned antislip floor and corner waste outlet
3
"Quadri-form" Shower tray
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
No38mm Shower waste union with grating4
WASTE UNIONS ETC
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
TRAPS ETC
64No50mm Deep seal "P" or "S" trap5
"Cobra Watertech"
A : 16 C : 24 D : 24 J : 0
W : 0
TAPS, VALVES, ETC
-67-
PLUMBING AND DRAINAGEBill No. 11Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
64No
KM2-100 Metering bib tap with non-hold open feature
and flow controller. Flow cycle 1-20 secs. ½” BSP Male
connection end. SANS 1808-9.
1
"Cobra Watertech"
A : 16 C : 24 D : 24 J : 0
W : 0
NoCode 068BJ : Overhead shower arm and rose built 1900mm high above floor
2
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
SANITARY PLUMBING
300m50mm Pipes3
uPVC pipes
A : 60 C : 120 D : 120 J : 0
W : 0
92m110mm pipes4
A : 20 C : 40 D : 32 J : 0
W : 0
20No110m reducing valve5
A : 4 C : 8 D : 8 J : 0
W : 0
60No50mm Bend6
Extra over uPVC pipes for fittings
A : 20 C : 0 D : 40 J : 0
W : 0
60No50mm Junction7
A : 20 C : 0 D : 40 J : 0
W : 0
92No50mm Access bend8
A : 12 C : 40 D : 40 J : 0
W : 0
-68-
PLUMBING AND DRAINAGEBill No. 11Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
104No110mm Fittings1
A : 24 C : 40 D : 40 J : 0
W : 0
ItemTesting drainage pipe system2
Testing
A : 0.67 C : 0.00 D : 0.00 J : 0.00
W : 0.00
WATER SUPPLIES
260m15mm Pipes3
Class "O" copper pipes
A : 60 C : 120 D : 80 J : 0
W : 0
360No15mm Fittings4
Extra over class "O" copper pipes for capillary fittings
A : 80 C : 160 D : 120 J : 0
W : 0
4NoAllocate existing water supply pipe system and connect new water supply pipe to existing system
5
Sundries
A : 4 C : 0 D : 0 J : 0
W : 0
ItemTesting water pipe system6
Testing
A : 0.67 C : 0.00 D : 0.00 J : 0.00
W : 0.00
-69-
PLUMBING AND DRAINAGEBill No. 11Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
PLUMBING AND DRAINAGE
Bill No. 11
AmountR
PageNo
COLLECTION
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
69
68
67
66
65
64Total Brought Forward from Page No.
-70-
PLUMBING AND DRAINAGEBill No. 11Section No. 2
ORGANIC ARCHITECTS
Carried to Summary R
AmountR
ItemNo
Quantity Rate
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
BILL NO 12
GLAZING
TOPS, SHELVES, DOORS, MIRRORS, ETC
17No2000 x 1300mm mirror1
4mm thick Polished mirror with 4 off fixing holes complete with chrome plated dome caps to and fixing screws
A : 1 C : 8 D : 8 J : 0
W : 0
4No1660 x 1300mm mirror2
A : 4 C : 0 D : 0 J : 0
W : 0
4No760 x 1300mm mirror3
A : 4 C : 0 D : 0 J : 0
W : 0
20No600 x 1700mm mirror4
A : 4 C : 8 D : 8 J : 0
W : 0
-71-
GLAZINGBill No. 12Section No. 2
ORGANIC ARCHITECTS
Carried to Summary R
AmountR
ItemNo
Quantity Rate
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
BILL NO 13
PAINTWORK
SUPPLEMENTARY PREAMBLES
Descriptions of paintwork shall be deemed to include for all cutting in
DESCRIPTIONS
Previously painted plastered surfacesSurfaces shall be thoroughly washed down and allowed to dry completely before any paint is applied. Blistered or peeling paint shall be completely removed and cracks shall be opened, filled with a suitable filler and finished smooth
PREPARATORY WORK TO EXISTING WORK
Previously painted metal surfacesSurfaces shall be thoroughly rubbed and cleaned down. Blistered or peeling paint shall be completely removed down to bare metal
Previously painted wood surfacesSurfaces shall be thoroughly cleaned down. Blistered or peeling paint shall be completely removed and cracks and crevices shall be primed, filled with suitable filler and finished smooth
All painting shall be done in accordance with "Plascon-Evans" specifications
PAINT SPECIFICATIONS
PAINTWORK, ETC TO NEW WORK ON
PLASTER BOARD SURFACES WITH
377m²Ceilings and cornices1
One coat alkali resistant plaster primer and two coats PVA acrylic emulsion paint on
A : 124 C : 224 D : 29 J : 0
W : 0
METAL SURFACES WITH
-72-
PAINTWORKBill No. 13Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
116m²Door frames1
Spot priming defects in pre-primed surfaces with zinc phosphate metal primer, one coat universal undercoat and two coats super universal enamel paint on steel
A : 6 C : 66 D : 44 J : 0
W : 0
WOOD SURFACES WITH
401m²Doors2
One coat oil wood primer, one coat universal undercoat and two coats super universal enamel paint on
A : 81 C : 186 D : 135 J : 0
W : 0
m²on existing bench3
A : 0.0 C : 0.0 D : 0.0 J : 0.0
W : 0.0
-73-
PAINTWORKBill No. 13Section No. 2
ORGANIC ARCHITECTS
Carried to Collection R
PAINTWORK
Bill No. 13
AmountR
PageNo
COLLECTION
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
73
72Total Brought Forward from Page No.
-74-
PAINTWORKBill No. 13Section No. 2
ORGANIC ARCHITECTS
Carried to Summary R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
Section No.02
FINAL SUMMARY - Section No.02
BillNo
PageNo
AmountR
Section No. 2
40ALTERATIONS1
43MASONRY2
44WATERPROOFING3
47CARPENTRY AND JOINERY4
50CEILINGS ETC5
53FLOOR COVERINGS6
58IRONMONGERY7
59METALWORK8
60PLASTERING9
63TILING10
70PLUMBING AND DRAINAGE11
71GLAZING12
74PAINTWORK13
-75-
Section No. 2
ORGANIC ARCHITECTS
Carried to Final Summary R
AmountR
ItemNo
Quantity Rate
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
BILL NO 1
PROVISIONAL SUMS ETC
The contractor is referred to the Preliminaries for further amplification of "Prime Cost Amounts and Provisional Sums"
SUPPLEMENTARY PREAMBLES
NOTE: The following Provisional Amounts are for work to be carried out by nominated or selected sub-contractors in terms of Clause 21 of the Principal Building Agreement
NOTE: Tenderers are referred to the definition of general attendance on nominated or selected sub-contractors given in Clause 9.1 of the Preliminaries
50,000.00Item
Allow the Provisional Amount of R50 000(Fifty Thousand Rand) NET for Mechanical Work to be executed by a sub-contractor
1
VENTILATION
%Add for profit2
%Add for general attendance on sub-contractor3
Item 200,000.00
Allow the Provisional Amount of R200,000.00 (Two Hun-dred Thousand Rand) NET for Electrical Work to be ex-ecuted by a sub-contractor
4
ELECTRICAL INSTALLATION
%Add for profit5
%Add for general attendance on sub-contractor6
-76-
PROVISIONAL AMOUNTSBill No. 1Section No. 3
ORGANIC ARCHITECTS
Carried to Collection R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
50,000.00Item
Allow the Provisional Amount of R50,000 (Fifty
Thousand Rand) for Electronic Installation to be
determined by the enginner, measured and priced in
accordance with these Bills of Quantities or omitted in
part or whole as instructed by the Principal Agent
1
ELECTRONIC INSTALLATION
%Add for profit2
%Add for general attendance on sub-contractor3
BUDGETARY ALLOWANCES
100,000.00Item
Allow the provisional amount of R100 000 ( Hundred Thousand Rands) NET for Granite tops to be measured and priced in accordance with these Bills of Quantities and omitted in part or whole as instructed by the Principal Agent
4
SUNDRY BUILDER'S WORK
80,000.00Item
Allow the provisional amount of R80,000 (Eighty Thousand Rands) NET for Sundry Builder's Workto be measured and priced in accordance with these Bills of Quantities and omitted in part or whole as instructed by the Principal Agent
5
-77-
PROVISIONAL AMOUNTSBill No. 1Section No. 3
ORGANIC ARCHITECTS
Carried to Collection R
PROVISIONAL AMOUNTS
Bill No. 1
AmountR
PageNo
COLLECTION
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
77
76Total Brought Forward from Page No.
-78-
PROVISIONAL AMOUNTSBill No. 1Section No. 3
ORGANIC ARCHITECTS
Carried to Final Summary R
BLOCK E1,G,M,U
ABLUTION RENOVATIONS PHASE 2
VAAL UNIVERSITY OF TECHNOLOGY
PageNo
FINAL SUMMARY
SectionNo
AmountR
27Section No.011
75Section No.022
78Section No.033
RSub-Total
SUMContigencies
RSub-Total
RADD: Value added Tax at 15%
RSub-Total
-79-
ORGANIC ARCHITECTS
TOTAL CARRIED TO FORM OF TENDER R