SECTION 4

PRELIMINARIES & BILLS OF QUANTITIES

Page 2: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 1

PRELIMINARIES

NOTES

NOTES: The agreement is to be the JBCC Series 2000 PrincipalBuilding Agreement prepared by the Joint Building ContractCommittee July 2007 edition 5.0 code 2101

The ASAQS Preliminaries (November 2007 Edition) publishedby the Association of South African Quantity Surveyors for usewith the said JBCC Principal Building Agreement shall bedeemed to be incorporated herein.

Tenderers are referred to the abovementioned documents forthe full intent and meaning of each clause thereof. Theseclauses are hereinafter referred to by clause number andheading only.

Where standard clauses or alternatives are not entirelyapplicable to this contract such modifications, corrections orsupplements as will apply are given under each relevant clauseheading and such modifications, corrections or supplementsshall take precedence notwithstanding anything contrarycontained in the abovementioned documents.

Where any item is not relevant to this specific contract suchitem is marked N/A, signifying "not applicable".

Carried to Collection R Section No. 1SECTION 4A - PRELIMINARIESBill No. 1Preliminaries2010J049House De Welzim

- 1 -

Page 3: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

PREAMBLES FOR TRADES

The Model Preambles for Trades (1999 Edition) as publishedby the Association of South African Quantity Surveyors shall bedeemed to be incorporated in these Bills of Quantities and noclaims arising from brevity of description of items fullydescribed in the said Model Preambles will be entertained.Supplementary preambles are incorporated in these Bills ofQuantities to satisfy the requirements of this project. Suchsupplementary preambles shall take precedence over theprovisions of the said Model Preambles. The contractor'sprices for all items throughout these Bills of Quantities musttake account of and include for all of the obligations,requirements and specifications given in the said ModelPreambles and in any supplementary preambles.

SECTION A : PRINCIPAL BUILDINGAGREEMENT

Definitions (A1)

A Definitions and Interpretation Item

Objective and Preparation (A2-A14)

B Offer, acceptance and performance obligations Item

C Documents Item

D Design Responsibility Item

E Employer's Agents Item

F Contractor's Site Representative Item

G Compliance with laws and regulations Item

H Works Risk Item

J Indemnities Item

K General Insurances Item

L Special Insurances Item

Carried to Collection R Section No. 1SECTION 4A - PRELIMINARIESBill No. 1Preliminaries2010J049House De Welzim

- 2 -

Page 4: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

A Effecting Insurances Item

B Assignment Item

C Security Item

Execution (A15- A23)

D Preparation for and execution of the works Item

E Site and Access Item

F Specific security and access restrictions apply. ReferSection C of Preliminaries. Item

G Contract Instructions

Supervision by the Principal Agent and other Agents isintended as a means of checking the interpretation of workdone and providing clarification and further informationwhere required during the progress of the work.Supervision shall not in any way relieve the contractor ofhis responsibility for ensuring that the work is carried outsatisfactorily in all aspects, in good time and in accordancewith the contract. Although the principal Agent and theother Agents will make spot checks from time to time ondimensions and levels as the work proceeds, checking ofthe setting out, dimensions levels and positioning for allitems is the contractors responsibility and should anyerrors occur during the course of or be found aftercompletion of the Works, the cost of remedying same willbe for the Contractor's account. Item

H Setting out of the Works Item

J The contractor shall notify the principal agent if anyencroachments of adjoining buildings, structures,boundries, etc. exist in order that the necessaryarrangements may be made for the rectification of anysuch encroachments. Item

K Temporary Works and Plant Item

L Nominated subcontractors Item

Carried to Collection R Section No. 1SECTION 4A - PRELIMINARIESBill No. 1Preliminaries2010J049House De Welzim

- 3 -

Page 5: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

A Selected subcontractors Item

B Employer's Direct Contractors Item

C Contractor's domestic subcontractors Completion (A24-A30) Item

Completion (A24-A30)

D Practical Completion Item

E Works Completion Item

F Final Completion Item

G Nothing in clause 26 shall be construed so as to restrict orremove in any way the contractor's liability for any latentdefects and any insufficiencies in the works or materialsnor to prescribe the employers common law rights in anyway. Item

H Latent defects liability period Item

J Sectional Completion Revision of date for Practicalcompletion. The removal and replacement of materialsand/or workmanship that do not conform to the descriptionshall not constitute grounds for an extension of theconstruction period nor for an adjustment to the contractsum. Item

K Penalty for late or noncompletion Item

Payment (A31- A35)

L Interim Payment - Notwithstanding this or any otherclause, materials and goods stored off site shall not beincluded in the amount authorised for payment. Item

M Material on site shall be paid to the maximum asdetermined by the Employers Financier. Item

N Clause 31.9 : Replace "seven (7) calendar days" with"fourteen (14) calendar days." Item

Carried to Collection R Section No. 1SECTION 4A - PRELIMINARIESBill No. 1Preliminaries2010J049House De Welzim

- 4 -

Page 6: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

A Adjustment to the Contract ValueAll fluctuations in costs, with the exception of fluctuationsin the rate of Value Added Tax, shall be for the account ofthe contractor. Where prices are submitted by thecontractor or n/s subcontractor during the progress of theworks in respect of contract instructions or in regard to aclaim under the terms of the contract and notwithstandingthe fact that such prices may be used in an interimpayment certificate, there is to be no presumption ofacceptance. Should the principal agent wish to accept anysuch prices prior to the issue of the Final PaymentCertificate, it shall be in writing. CPAP is not applicable. Item

B Recovery of expense or loss Item

C Final Account and Final Payment Item

D Payment to other parties Item

Termination (A36- A39)

E Termination by Employer - Contractor's default Item

F Termination by Employer - Loss and damage Item

G Termination by Contractor - Employer's default Item

H Termination - cessation of the works Item

Disputes (A40)

J Settlement of Disputes Item

K Clause 41.0 - Post Tender Provisions - The required posttender information shall be inserted in the post tenderprovisions after consultation with the contractor. Item

L Contract Agreement (A41-A42) Item

M Clause 42.0 - Contractual Agreement. The requiredinformation of the contracting parties and the amount ofthe accepted contract sum shall be inserted in thecontractual agreement for signature of the agreement bythe contracting parties. Item

Carried to Collection R Section No. 1SECTION 4A - PRELIMINARIESBill No. 1Preliminaries2010J049House De Welzim

- 5 -

Page 7: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

SECTION B - PRELIMINARIES

Definitions and interpretation

A Clause 1.0 - Definitions and interpretation Item

Documents

B Clause 2.1 - Checking of documents Item

C Clause 2.2 - Provisional bills of quantitiesThese bills of quantities are in multiple procurement format- are provisionally measured and the subsequent tradesare budgetary allowances and selected/ nominatedsubcontract amounts. Item

D Clause 2.3 - Availability of construction documentationThe budgetary allowances and Selected/nominatedsubcontract amounts allocated for subsequent tradesincluded in this document will be separately procured,based on multiple procurement of subcontractors duringthe construction period. Item

Previous work and adjoining properties

E Clause 3.1 - Previous work - dimensional accuracy Item

F Clause 3.2 - Previous work - defects Item

G Clause 3.3 - Inspection of adjoining properties Item

Samples, shop drawings and manufacturer's instructions

H Clause 4.1 - Samples of materials Item

J Clause 4.2 - Workmanship samples Item

K Clause 4.3 - Shop drawings Item

L Clause 4.4 - Compliance with manufacturer's instructions Item

Deposits and fees

M Clause 5.1 - Deposits and fees Item

Carried to Collection R Section No. 1SECTION 4A - PRELIMINARIESBill No. 1Preliminaries2010J049House De Welzim

- 6 -

Page 8: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Temporary services

A Clause 6.1 - Water Item

B Clause 6.2 - Electricity Item

C Clause 6.3 - Telecommunication facilities Item

D Clause 6.4 - Ablution facilities Item

Prime cost amounts

E Clause 7.1 - Responsibility for prime cost amounts Item

Special attendance on n/s subcontractors

F Clause 8.1 - Special attendance Item

General

G Clause 9.1 - Protection of the works Item

H Clause 9.2 - Protection/isolation of existing/sectionallyoccupied works Item

J Clause 9.3 - Security of the works Item

K Clause 9.4 - Notice before covering work Item

L Clause 9.5 - Disturbance Item

M Clause 9.6 - Environmental disturbance Item

N Clause 9.7 - Works cleaning and clearing Item

P Clause 9.8 - Vermin Item

Q Clause 9.9 - Overhand work Item

Schedule of variables

Information necessary for elections and completion of thoseclauses contained in the schedule which are necessary fortender purposes is given in Section 2 : "Contract Data EC"

Carried to Collection R Section No. 1SECTION 4A - PRELIMINARIESBill No. 1Preliminaries2010J049House De Welzim

- 7 -

Page 9: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

SECTION C: SPECIFIC PRELIMINARIES

A Where warranties for materials and/or workmanship arecalled for, the contractor shall obtain a written warranty,addressed to the employer, from the firm supplying thematerials and/or doing the work and shall deliver same tothe principal agtent on the certified completion of thecontract. The warranty shall state that workmanship,materials and installation are warranteed for a specifiedperiod from the date of final completion and that anydefects that may arise during the specified period shall bemade good at the expense of the firm supplying thematerials and/or doing the work, upon written notice to doso. The warranty will not be enforced if the work isdamaged by defects in the construction of the building inwhich case the responsibility for replacement shall restentirely with the contractor. Item

SHOP DRAWINGS

B The contractor and/or nominated/selected sub-contractorshall prepare and submit, at his own expense, three (3)copies of shop drawings of all fabricated work, working orsetting out drawings shop details and schedules to theprincipal agent for approval prior to commencement ofmanufacture. Correction of shop drawings shall notconstitute a change in scope of work unless the contractornotifies the principal agent in writing within seven (7) daysand shall not proceed with fabrication until so authorizedby the architect. Item

SAMPLES

Carried to Collection R Section No. 1SECTION 4A - PRELIMINARIESBill No. 1Preliminaries2010J049House De Welzim

- 8 -

Page 10: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

A Samples are physical examples furnished by thecontractor to illustrate materials, equipment orworkmanship and to establish standards by which the workwill be judged. The contractor shall furnish without delaysuch samples and "mock ups" as may be called for by thearchitect who may reject all material and workmanship notcorresponding with the approved samples. Samples mustbe submitted in duplicate or as instructed and must allow areasonable time for their consideration. Samples must beproperly labelled with the project name and location,contractor's name, the type, finish composition ofmaterials date of submission and the contract documentreference in which the project is identified. Item

OVERTIME

B Should overtime be required to be worked for any reasonwhatsoever, the costs of such overtime are to be borne bythe contractor unless the principal agent has specificallyauthorized in writing, prior to the execution thereof, thatcosts for such overtime are to be borne by the employer. Item

CO-OPERATION OF CONTRACTOR FOR COSTCONTROL

C It is specifically agreed that the contractor accepts theobligation of assisting the professional consultants inimplementing proper cost control in an effort to preventthe final building cost from exceeding the budget. It isspecifically agreed that the professionals and thecontractor will endeavour to agree and sign off variationswithin sixty days of them arising. Item

PROPRIETARY BRANDED PRODUCTS

D The contractor shall take delivery of, handle, store, useapply and/or fix all proprietary branded products in strictaccordance with the manufacturer's instruction afterconsultation with the manufacturer's authorizedrepresentative. Item

Carried to Collection R Section No. 1SECTION 4A - PRELIMINARIESBill No. 1Preliminaries2010J049House De Welzim

- 9 -

Page 11: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

AS-BUILT DRAWINGS

A The position of construction breaks and the extent ofindividual concrete pours are to be recorded by thecontractor on the structural engineer's drawings and are tobe submitted to the principal agent and the structuralengineer for their records. Item

SITE INSTRUCTIONS

B Site instructions issued on site are to be recorded intriplicate in a site instruction book which is to bemaintained on site by the contractor. Item

LABOUR RECORD

C At the end of each week the contractor shall provide theprincipal agent with a written record, in schedule form,reflecting the number and description of tradesmen andlabourers employed by him and all subcontractors on theworks each day. Item

PLANT RECORD

D At the end of each week the contractor shall provide theprincipal agent with a written record, in schedule form,reflecting the number, type and capacity of all plant,excluding hand tools, currently used on the works. Item

HEALTH AND SAFETY ACT (Act 85 of 1993)

E Compliance with the current Occupation Health and SafetyAct and all relevant and applicable regulations, especiallythe Construction Health & Safety Act, (as amended) for theduration of the contract. Item

HIV AND AIDS POLICY

F Observation of all legislation, policies and by-lawsregulating the "AIDS" endemic and "HIV" prevention,treatment and observation. Item

Carried to Collection R Section No. 1SECTION 4A - PRELIMINARIESBill No. 1Preliminaries2010J049House De Welzim

- 1 0 -

Page 12: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

NON CESSION OF MONIES

A The contractor shall not cede nor assign his rights orclaims to any monies due or to become due under thiscontract and no purported cession or assignment will berecognised without the written consent of the employer. Item

INSPECTION BY ARCHITECT

B The Architect shall make such visits to the Works as hemay from time to time deem necessary. In the event of anymatter arising which the Contractor considers of suchimportance that the Architect must be consulted, everyreasonable attempt shall be made by the Contractor tocommunicate with him before proceeding with the point atissue. Item

C It must, however, be borne in mind that the Architect isemployed, to ensure correct compliance with the terms ofthis contract, proper building procedures in accordancewith the best traditions of the various trades and adequatefinishes as specified and to his satisfaction. The Architectis thus in no way responsible for any act or omission on thepart of the Contractor which may result in any patent orlatent defects in materials or workmanship, breach orneglect of any local regulations. The Contractor thereforeremains at all times responsible for any neglect, deviationor wrong act, whether the same be discovered before orafter the final certificate, or any other certificate is issued. Item

Carried to Collection R Section No. 1SECTION 4A - PRELIMINARIESBill No. 1Preliminaries2010J049House De Welzim

- 1 1 -

Page 13: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

SETTING OUT OF BUILDINGS

A A registered Land Surveyor shall set out the works, gatherall relevant data such as datum levels, platform heightsetc. and hand this information to the Principal Agent in anelectronic format. The contractor shall submit on a weeklybasis and updated "Schedule of Information Required" toall parties concerned, indicating dates upon which suchinformation and details are required in relation to thebuilding programme. Timeous advanced notice is to begiven by the contractor for information or drawings whichare required on site. The contractor shall be responsiblefor the timeous notification to the Quantity Surveyor toenable him to call for tenders for all work to be executedby selected sub-contractors and shall, therefore, notify thequantity surveyor in writing at least fourteen (14) days priorto required availability date of these tender documents. Noclaim whatsoever will be afterwards admitted due to thecontractor having failed to comply with this condition. Item

DRAWINGS AND DIMENSIONS

B Upon receipt of detail drawings for any works, thecontractor shall, before putting that work in hand, ascertainthat the dimensions given on the detail drawingscorrespond with the dimensions of any work already built.In the event of a discrepancy between the detail drawingsand the work already built, the discrepancy, shall bebrought to the principal agent's attention who shall decidethe procedure. All drawings, whatever their origin, are tobe issued to the site, or to any other designated person orpersons, only through the principal agent's office and shallbear the principal agent's office stamp and signature. Anup to date register of all drawings issued to the contractorshall be kept on the works. Any other drawings used on thesite will be used at the contractor's risk and should anywork be incorrect due to the use of unauthorised drawings,the cost of rectifying such work shall be for the contractor'saccount. All drawings used on the works shall be properlymounted on suitable sheet material, or otherwiseprotected and kept in good condition. Any drawingsbecoming bleached or otherwise obscured so that theycannot be properly read shall be returned to the principalagent for replacement, as any errors due to misreading ofdamaged or obscured drawings shall be made good by thecontractor at his own expense. Item

Carried to Collection R Section No. 1SECTION 4A - PRELIMINARIESBill No. 1Preliminaries2010J049House De Welzim

- 1 2 -

Page 14: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

INJURY TO PERSONS OR PROPERTY

A The Contractor shall in terms of the Compensation forOccupational Injuries and Diseases Act, 1993 (Act 130,1993) (COID Act) be registered with the Director Generalof the Department of Labour as an Employer by the namein which the accepted tender was submitted and for theintended line of business pertaining to the Contract and therelevant COID Act Section 83 Assessments shall be keptfully paid up throughout the duration of the Contract. TheContractor must allow under this clause for allrequirements as specified in the Compensation forOccupational Injuries and Diseases Act, 1993 (Act 130,1993) and must fully adhere to all requirements and shouldallow to comply with all the relevant Legislation, as well asC.S.I.R Internal Services Health and Safety Specification -Annexure A. A safety audit will be done on a regular basisof all requirements. Item

MEDIA RELEASES, ADVERTISING, ETC

B All right of publication of articles in the media, together withany advertising relating to, or in any way connected withthis project shall vest in the employer. The contractor,together with his sub-contractors shall not, without thewritten consent of the employer, cause any statement oradvertisement to be printed, screened or aired by themedia. Item

SECURITY

C The site is within a security village. The contractor will besubject to the rules of the estate as it may apply andchange from time to time. Working hours are restricted.The current allpicable rules form part of this tenderdocument and is attached. Workers, supervisors,suppliers, sub-contractors may be required to register andpay for a contractor's access card Item

Carried to Collection R Section No. 1SECTION 4A - PRELIMINARIESBill No. 1Preliminaries2010J049House De Welzim

- 1 3 -

Page 15: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

PRIME COST AMOUNTS

A Notwithstanding any information to the contrary in thecontract document or preliminaries, references to "PrimeCost" or "PC" shall mean the cost at which an item ormaterial is obtained inclusive of delivery to site andexclusive of value added tax. Unless otherwise statedinstallation is not included in the Prime Cost and thecontractor is to include this in his rate. The prime Costdoes not include any allowance for wastage and refers tocost per net measurable unit. The contractor is to allow forwastage, shrinkage, bulking etc. Item

Carried to Collection R Section No. 1SECTION 4A - PRELIMINARIESBill No. 1Preliminaries2010J049House De Welzim

- 1 4 -

Page 16: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Section No. 1

SECTION 4A - PRELIMINARIES

Bill No. 1

Preliminaries

SUMMARY

Page AmountNo

Total Brought Forward from Page No. -1-

-2-

-3-

-4-

-5-

-6-

-7-

-8-

-9-

-10-

-11-

-12-

-13-

-14-

Carried to Final Summary R Section No. 1SECTION 4A - PRELIMINARIESBill No. 1Preliminaries2010J049House De Welzim

- 1 5 -

Page 17: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL NO 1

ALTERATIONS

SUPPLEMENTARY PREAMBLES

View site

Before submitting his tender the contractor shall visit the siteand satisfy himself as to the nature and extent of the work to bedone and the value of the materials contained in the buildingsor portions of the buildings to be demolished. No claim for anyvariations of the contract sum in respect of the nature andextent of the work or of inferior or damaged materials will beentertained

General

Water supply pipes and other piping that may be encounteredand found necessary to disconnect or cut, shall be effectuallystopped off or grubbed up and removed, and any newconnections that may be necessary shall be made with properfittings, to the satisfaction of the principal agent

Making good of finishes shall include making good of the brickand concrete surfaces onto which the new finishes are applied,where necessary

The contractor will be required to take all dimensions affectingthe existing buildings on the site and he will be held solelyresponsible for the accuracy of all such dimensions where usedin the manufacture of new items (doors, windows, fittings, etc)

Removing of material shall include loading and carting away toa dump-site located by the contractor. It shall include anydumping fees etc

Old materials

Old materials resulting from the alterations and demolitions areto be removed from the site unless otherwise specified

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 1Alterations2010J049House De Welzim

- 1 6 -

Page 18: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Notices

Special care is to be taken not to interfere unnecessarily withany electrical or telephone installations that may be met withand due notice is to be given to the Principal Agent when anydisconnections or removal of wires, fittings, etc are necessaryand the contractor is to afford every facility to the electricianscarrying out this work

Demolitions

All demolition work is to be carried out in accordance with theLocal By-laws and to the requirements of the requirements ofthe Local Health Authorities. The contractor is to allow forgiving notices and paying any fees related to municipalrequirements

All demolition work is to be carried out in strict accordance withthe instructions and to the satisfaction of the Principal Agent

Temporary coverings, Screens etc.

The contractor will be held responsible for any damage toproperty or goods in the existing buildings due to his not havingtaken adequate precautions, and all damage caused is to bemade good at the contractors own expense. The contractormust provide for all necessary screens, partitions, tarpaulins,barriers, signage, demarcation etc. to protect the work andprevent any nuisance from dust as may be required or directed.

Damage to persons or property

The contractor will be held responsible for any damage topersons or property and for the safety of the structures and heis to allow for protecting and indemnifying persons using theexisting buildings from injury by virtue of the buildingoperations, including providing necessary barriers, signs, etc.

Setting out

All dimensions affecting work in the existing buildings are to betaken on the site and the contractor will be responsible fortaking correct sizes of all new work, the sizes given in this billare approximate.

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 1Alterations2010J049House De Welzim

- 1 7 -

Page 19: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Making good

Prices for all works described throughout the Bills of Quantitiesare to include for making good, whether specifically mentionedor not in all trades except Painting, unless otherwise described.

The contractor must make good to existing work damaged ordisturbed through alterations and to existing work remainingafter doors, screens, fittings, walls, etc are removed, by fitting inshort lengths of skirtings, architrave's, etc. and taking out andmaking good suspended ceilings and floors on necessaryjoists etc. Plaster finishing to walls and ceilings and renderingfloor tiles, etc, to floors for facing up walls with brickwork cut,toothed and bonded to existing with facing bricks, quarry tilesor common brickwork to receive finishing, unless otherwisedescribed

All materials in making good are to match existing and the workis to be left complete and perfect in every respect.

Fixing in position

Fixing new and re-fixing existing materials is to include forcutting and fitting over existing skirtings, cornices, quadrants,etc. or for cutting existing work and for finishing up to new andfor making good as previously described

Re-fixing existing materials is to include for all necessarycutting to suit, forming mitres, fair ends, etc, for supplying shortlengths of new materials to make up for any deficiencies andfor supplying new screws, nails, etc. as is necessary.

Junction of new and existing

Making good at junctions of new and existing works is toinclude for piercing out, cutting through and removing shortlengths of existing materials and for jointing to match existing.

Credit For old Materials

Provision is made in the final summary to quote the value ofmaterials in summary to be taken into consideration whenadjudicating the tenders. The rates below are to be free of saidvalues. Only items marked as "(Credit)" to be taken intoconsideration

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 1Alterations2010J049House De Welzim

- 1 8 -

Page 20: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

REMOVAL OF EXISTING WORK

Break down and remove brickwork etc

A 230mm Walls m2 6

Hack up and remove

B Brick paving m2 261

C Surface bed 85mm thick, excavate and remove in situmaterial, level and compact to receive new surface bed170mm lower than before m2 13

Taking out and removing doors, windows, etc from onebrick walls including thresholds, sills etc. (Credit)

D Aluminium window size 400mm X 400mm. No 1

E Timber garage door 4800 X 2125 No 1

Carefully take out and remove timber door, keeping framein existing position, including protecting and preparingframe to receive new doors (Credit)

F Timber door size 813 X 2032mm No 9

Carefully take out and remove ironmongery from timberdoors, and set a side for re-use and later refixing in a newdoor.

G Hinges,bolts, handles, locksets, etc No 9

Hacking up/off and removing tiles including removingmortar bed or adhesive from concrete or brickwork andpreparing surfaces for new screed, plaster, tile finish, etc

H Ceramic floor tiles m2 2

J Ceramic wall tiles m2 11

K Natural stone tiles m2 10

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 1Alterations2010J049House De Welzim

- 1 9 -

Page 21: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Hacking up/off and removing granolithic, screeds, plaster,etc and finishes from concrete or brickwork and preparingsurfaces for new screed, plaster, tile finishes, etc

A Epoxy finish from floors m2 35

B Epoxy finish from treads and risers of stairs m2 1

C Internal cement plaster from walls m2 56

D External cement plaster from walls m2 57

Take out and remove piping, sanitary fittings and tapsincluding cutting off as necessary, disconnecting pipingfrom fittings (Credit).

E Wash hand basin on and including pedestal, with pillartaps, including short lenghts of piping. No 1

F WC pan with cistern, including short lenghts of piping. No 1

Carefully Take out doors, windows, etc includingthresholds, sills, etc setting aside for re-use and laterrefixing in a new position

G Alluminium folding door and frame, 3280 X 2125mmincluding setting up and building in old track and guide innew brickwork. No 1

Take down or out and remove including cutting, grindingetc as may be required

H Steel balustrades (Credit) m 11

J Toiletroll holders, soapdishes, curtain tracks, mirrors, towelrails etc (Credit) Item

K 18.5m of Pallisade Wall consisting of small brick wall, withcolumns and steel balustrades (Credit) between columns.+/- 1300mm high Item

L 3.00m long Steel gate (Credit) Item

M 8.1m long Steel Balustrades +/- 1200mm high Item

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 1Alterations2010J049House De Welzim

- 2 0 -

Page 22: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

A Boundary Wall 20.6m long, including steel gate 4.4m long. Item

Carefully take out and remove, setting aside for re-use andlater refixing on to new roof trusses.

B Roof Tiles m2 24

C Roof barge tiles m 25

Cut into and leave remaining in place

D Cut into existing roof including trusses, batterns, bracing,wall plates etc as required to accommodate new rooftrusses Item

Chisel out and remove, and prepare for new brickwork

E 400 X 400mm Alluminium window frame, to receive newbrick work No 1

OPENINGS THROUGH EXISTING WALLS ETC

Altering Openings

F Altering opening in one brick wall where three 400 X400mm high aluminium windows are to be removed toform an opening for a new aluminium folding door 3000 X2125mm high overall by breaking out brickwork on bothsides, bottom and top including removing precast concretelintels, placing temporary propping, making good cementplaster on both side into reveals. (New door, frame andpaintwork elsewhere) No 1

G Altering opening in one brick wall where 900 X 1800mmhigh aluminium window is to be removed to form anopening 1200 X 2700mm high overall including removingprecast concrete lintel, placing temporary propping,making good internal cement plaster on both sides, ceilingplaster, and floor screeds. (making good paintworkelsewhere) No 1

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 1Alterations2010J049House De Welzim

- 2 1 -

Page 23: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

A Altering opening in one brick wall where 1250 X 2125mmhigh timber door is to be removed to form an opening 1500X 2700mm high overall by breaking out brickwork includingremoving precast concrete lintel, placing temporarypropping, making good cement plaster on both sides,ceiling, and floor screeds. (Making good paintworkelsewhere) No 1

B Altering opening in one brick wall where 813 X 2032mmhigh timber door is to be removed to form an opening 900X 2700mm high overall by breaking out brickwork includingremoving precast concrete lintel, placing temporarypropping, making good cement plaster on both sides,ceiling, and floor screeds. (Making good paintworkelsewhere) No 1

BUILDING UP OPENINGS

Brickwork in NFP bricks in class II mortar in building upopenings

C 230mm Walls m2 6

MAKING GOOD OF FINISHES ETC

Making good internal cement plaster

D Walls in patches m2 5

Sundries

E Cutting toothings and bonding new brickwork to existing m2 4

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 1Alterations2010J049House De Welzim

- 2 2 -

Page 24: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 1

Alterations

SUMMARY

Page AmountNo

Total Brought Forward from Page No. -16-

-17-

-18-

-19-

-20-

-21-

-22-

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 4B - BUILDING WORKSBill No. 1Alterations2010J049House De Welzim

- 2 3 -

Page 25: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 2

EARTHWORKS ( PROVISIONAL)

SUPPLEMENTARY PREAMBLES

Engineer's Specification

Refer to the specifications prepared by Johan Erwee engineersdated 01 Febuary 2011

Net measurements

All units of measurement are net and no allowance have beenmade for bulking

Nature of ground

The nature of the ground is assumed to be pickable material,therefore "earth", but possibly interspersed with "hard rock" or"soft rock"

Carting away of excavated material

Descriptions of carting away of excavated material shall bedeemed to include loading excavated material onto trucksdirectly from the excavations or, alternatively, from stock pilessituated on the building site, paying any fees levied by theauthorities including estate management, etc

SITE CLEARANCE ETC

Site clearance

A Digging up and removing rubbish, debris, vegetation,hedges, shrubs, lawn, bush, etc including trees notexceeding 200mm girth and 100mm deep topsoil to becarted away to a dumping site located by the contractor. m2 176

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 4B - BUILDING WORKSBill No. 2Earthworks2010J049House De Welzim

- 2 4 -

Page 26: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 3

CONCRETE, FORMWORK ANDREINFORCEMENT

SUPPLEMENTARY PREAMBLES

Cost of tests

The costs of making, storing and testing of concrete test cubesas required under clause 7 "Tests" of SABS 1200 G shallinclude the cost of providing cube moulds necessary for thepurpose, for testing costs and for submitting reports on thetests to the architect. The testing shall be undertaken by anindependent firm or institution nominated by the contractor tothe approval of the architect. (Test cubes are measuredseparately)

Formwork

Description of formwork shall be deemed to include use andwaste only (except where described as "left in" or "permanent"),for fitting together in the required forms, wedging, plumbing andfixing to true angles and surfaces as necessary to ensure easyrelease during stripping and for reconditioning as necessarybefore re-use

The vertical strutting shall be carried down to such constructionas is sufficiently strong to afford the required support withoutdamage and shall remain in position until the newly constructedwork is able to support itself.

Formworks to soffits of solid slabs etc shall be deemed to beslabs not exceeding 250mm thick unless otherwise described

Formwork to sides of bases, pile caps, ground beams, etc willonly be measured where it is prescribed by the engineer fordesign reasons. Formwork necessitated by irregularity orcollapse of excavated faces will not be measured and the costthereof shall be deemed to be included in the allowance fortaking the risk of collapse of the sides of the excavations,provision for which is made in "Earthworks"

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 3Concrete Formwork & Reinforcement2010J049House De Welzim

- 2 5 -

Page 27: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

REINFORCED CONCRETE RAFT FOUNDATIONS

Reinforced concrete raft foundations. Refer to thespecifications and detailed drawings compiled by JohanErwee Engineers dated 1 Febuary 2011. All work to becarried out in accordance with the specificatons, approveddesign drawings and to the satisfaction of Johan ErweeEngineers.

A 20Mpa Concrete raft foundation for residential house inpickable soil including trench excavations, dampcourse,soil poisoning, concrete, formwork, reinforcing, curing,surface bed and carting away of excess material to adumping site located by the contractor, etc (approximately140m² for double storey addition) Item

B 20Mpa Concrete raft foundation for residential house inpickable soil including trench excavations, dampcourse,soil poisoning, concrete, formwork, reinforcing, curing,surface bed and carting away of excess material to adumping site located by the contractor, etc (13m² for singlestorey addition) Item

REINFORCED CONCRETE

25MPa /19mm concrete

C Slabs including beams and inverted beams m3 17

TEST BLOCKS

D Making and testing of three 150 x 150 x 150mm concretestrength test cubes per set No 5

ROUGH FORMWORK (DEGREE OF ACCURACYIII)

Rough formwork to sides

E Edges, risers, ends and reveals not exceeding 300mmhigh or wide. m 8

Rough formwork to soffits

F Slabs propped up not exceeding 3,50m high m2 83

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 3Concrete Formwork & Reinforcement2010J049House De Welzim

- 2 6 -

Page 28: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

A Slabs propped up exceeding 5,0m not exceeding 6,5mhigh m2 3

REINFORCEMENT

Mild steel reinforcement to structural concrete work

B 8 mm Diameter bars t 0.433

High tensile steel reinforcement to structural concretework

C 25mm Diameter bars t 0.095

D 16mm Diameter bars t 0.052

E 12mm Diameter bars t 1.281

F 10mm Diameter bars t 0.844

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 3Concrete Formwork & Reinforcement2010J049House De Welzim

- 2 7 -

Page 29: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 3

Concrete Formwork & Reinforcement

SUMMARY

Page AmountNo

Total Brought Forward from Page No. -25-

-26-

-27-

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 4B - BUILDING WORKSBill No. 3Concrete Formwork & Reinforcement2010J049House De Welzim

- 2 8 -

Page 30: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 4

PRECAST CONCRETE

SUPPLEMENTARY PREAMBLES

Sizes:

Blocks, sills, etc measured linear shall be made in suitablelengths. Large size setting out drawings shall be preparedwhere necessary and submitted to the architect for approvalbefore moulds are made

General:

Where kerbstones, blocks, etc are laid in ground descriptionsshall be deemed to include necessary excavation, filling in andramming

PRECAST CONCRETE

Precast lintels 110 X 75mm

A Standard precast concrete lintels m 81

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 4B - BUILDING WORKSBill No. 4Precast Concrete2010J049House De Welzim

- 2 9 -

Page 31: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 5

MASONRY

SUPPLEMENTARY PREAMBLES

BRICKWORK

Sizes in descriptions

Where sizes in descriptions are given in brick units, "one brick"shall represent the length and "half brick" the width of a brick

Hollow walls etc

Descriptions of hollow walls shall be deemed to include leavingevery fifth perpend of the bottom course of the external skinopen as a weep hole.

Walls in two skins described as "bagged and sealed" shall bedeemed to include having the outer face of the inner skinbagged with 1:6 cement and sand mixture and sealed with twocoats "Brixeal" bitumen emulsion waterproofing coating.

Face bricks

Face Bricks shall be ordered timeously to obtain uniformity insize and colour. Face Bricks to be selected from three palletssimultaneosly to avoid to ensure uniformity of colour.

Pointing

Descriptions of recessed pointing to fair face brickwork andface brickwork shall be deemed to include square recessed,hollow recessed, weathered pointing, etc

SUPERSTRUCTURE

Brickwork of NFP bricks in class II mortar

A Mass brickwork in piers and columns m3 9

B Mass brickwork in chimneys m3 5

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 5Masonry2010J049House De Welzim

- 3 0 -

Page 32: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

A 115mm Walls m2 35

B 230mm Walls m2 236

BRICKWORK SUNDRIES

Brickwork reinforcement

C 75mm Wide reinforcement built in horizontally m 77

D 150mm Wide reinforcement built in horizontally m 556

Turning pieces

E 115mm Wide turning piece to lintels m 50

NATURAL STONE CLADDING ETC

150mm Thick natural stone cladding including wire ties,jointing etc (Prime cost amount of R 350/m² includingdelivery and excluding VAT)

F To walls m2 121

PAVING

110 x 220 x 50mm Brick pavers (Prime cost amount ofR130.00/m² including delivery and excluding VAT) on50mm riversand on approved weedkiller, including surfacepreparation.

G Paving to falls, including edges, cutting etc m2 196

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 5Masonry2010J049House De Welzim

- 3 1 -

Page 33: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 5

Masonry

SUMMARY

Page AmountNo

Total Brought Forward from Page No. -30-

-31-

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 4B - BUILDING WORKSBill No. 5Masonry2010J049House De Welzim

- 3 2 -

Page 34: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 6

WATERPROOFING

SUPPLEMENTARY PREAMBLES

Waterproofing

Waterproofing of roofs, basements, etc shall be laid under a tenyear guarantee. Waterproofing to roofs shall be laid to evenfalls to outlets etc with necessary ridges, hips and valleys.Descriptions of sheet or membrane waterproofing shall bedeemed to include additional labour to turn-ups and turn-downs

DAMP-PROOFING OF WALLS AND FLOORS

One layer of 375 micron embossed damp proof course.

A Under Cills m2 8

WATERPROOFING TO CONCRETE ROOFS

One layer Derbigum SP4 torch-on waterproofingMembrane with 75mm side laps and 100mm end lapssealed to primed surfaces on concrete or screed surfacesand finished with two coats Roofcote bituminousaluminium paint, by approved specialist being a member ofthe Gauteng Waterproofing Association. Installation tocarry a ten year guarantee

B On concrete floors m2 4

WATERPROOFING TO BALCONIES

One layer Derbigum Cover Grade CG3 and one layer CG4torch on waterproofing Membrane with 75mm side lapsand 100mm end laps on concrete or screed surfaces, byapproved specialist being a member of the GautengWaterproofing Association. Installation to carry a ten yearguarantee

C On concrete floors m2 5

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 6Waterproofing2010J049House De Welzim

- 3 3 -

Page 35: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

A Seal edges at junction with parapet or balustrade notexceeding 100mm high including turn-ups m 10

WATERPROOFING TO WALLS, PARAPETS, ETC

Three coat "Fibre seal" fibre reinforced Acrylicwaterproofing per manufacturer's specification

B On parapet walls including 85mm turn down to bottom oftop corbelling course m2 4

C On walls and floors of showers m2 12

JOINT SEALANTS ETC

Silicone sealing compound including backing cord, bondbreaker, primer, etc

D 5 x 10mm in joints between tiles and sanitary fitting orworktop, etc m 8

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 6Waterproofing2010J049House De Welzim

- 3 4 -

Page 36: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 6

Waterproofing

SUMMARY

Page AmountNo

Total Brought Forward from Page No. -33-

-34-

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 4B - BUILDING WORKSBill No. 6Waterproofing2010J049House De Welzim

- 3 5 -

Page 37: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 7

ROOF COVERINGS ETC

CONCRETE ROOF TILES

420 X 332mm "Marley Monarch Double Roman" concreteroof tiles, nailed onto battens spaced at max 345mmcentres including one layer underlay. (battens elsewhere)Pricing of ridges, hips and valleys to include junctions andfair ends

A Roof Covering with a pitch of 26 degrees m2 163

B Ridge tiles m 17

C Valley tiles m 30

D Hip tiles m 19

SHEET METAL FLASHINGS

Galvanized sheet iron:

E 0,8 mm Side wall flashing and cover flashing, sealed intoplaster joints m 4

F 0,8 mm Headwall flashing and cover flashing, sealed intoplaster joints m 9

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 4B - BUILDING WORKSBill No. 7Roof Coverings etc2010J049House De Welzim

- 3 6 -

Page 38: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 8

CARPENTRY AND JOINERY

SUPPLEMENTARY PREAMBLES

Roofs

Roof trusses to be designed and constructed with soft woodstructural timber to include for live loads, wind loads and to taketile roof covering, purlins and fibre cement of gysumplasterboard ceilings with brandering. Each roof truss shallhave all its members accurately cut and close butted togetherand rigidly fixed by CSIR approved patented galvanized metalspiked connectors, fixed on both sides of each intersection byan approved method, all in accordance with the manufacturer'sinstructions.

The design, manufacture and transportation of the roof trusses,bracing, etc. shall be under the control of a registered Engineerin accordance with SABS 0243 and it shall be required from themanufacturer of the trusses to lodge a written guarantee thathis construction has been designed by a qualified StructuralEngineer and that he is in possession of a capability certificateissued by the Institute for Timber Construction an approved bythe Repressentative/agent.

The tenderer's attention is drawn to the fact that the tenderdrawings only represent the overall size and bearing points ofthe trusses and not the required design.

Erection must be carried out as described in "The Erection andBracing of Timber Roof Trusses" published by the Truss PlateAssociation of South Africa Ltd. and the National TimberResearch Institute, CSIR.

Descriptions of roof trusses shall be deemed to include fordesigh, manufacture, supply, hoisting and fixing in position,trimming ends, notching, etc. and for any temporary bracing.

ROOF CONSTRUCTION

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 8Carpentry & Joinery2010J049House De Welzim

- 3 7 -

Page 39: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Plate nailed timber roof truss construction

The following is applicable in respect of roof trusses:

Trusses at maximum 1000mm centres

Roof covering is Marley Double Roman concrete roof tiles on38 x 50mm battens at 345mm Centres

Grade 6 SA Pine

A 76 X 52mm Wall plate m 55

Roof construction of 26º double pitched trusses with300mm overhang including wall plates, purlins, bracing etc(refer drawings for dimensions)

B Roof construction for the additional L shaped building,consisting of scissor trusses over the new lounge area,10.10 X 5.90m joining to the old roof and a double pitchroof trusses over the main bedroom area, 7.20 X 9.50mincluding all hip, vally, rafter beams and bracing asneccessory to construct roof as per plan attached

No 1

C Roof construction for the extended entertainment area4.15 X 3.00m consisting of double pitch roof trusses as perplan attached. No 1

SKIRTINGS

Wrought Meranti

D 19 x 135mm High Profiled skirting (Prime Cost amount ofR100.00 including delivery and excluding VAT) m 75

DOORS AND FRAMES ETC

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 8Carpentry & Joinery2010J049House De Welzim

- 3 8 -

Page 40: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

"Innoware" or similar

A Sectional overhead garage door size 4880 x 2125mm highoverall with Gemini overhead motors and two remotes(Prime Cost amount of R16,000.00 including delivery,installation, finish and excluding VAT) (D7) No 1

B Sectional overhead garage door size 2440 x 2125mm highoverall with Gemini overhead motors and two remotes(Prime Cost amount of R10,000.00 including delivery,installation, finish and excluding VAT) (D8) No 1

Semi-Solid Doors

C Single 40mm Interior Doors size 813 x 2125mm high(Pime cost amount of R800.00 including delivery andexcluding VAT) (D10) No 4

Horizontally slatted solid fire doors

D 1/2 hour fire door 813 X 2125mm high fitted into a timberframe (Timber Frame measured elsewhere) No 1

Solid Meranti

E Frame for single door No 5

F 40mm Single door size 813 x 2032mm high hung toexisting timber frame (Prime Cost amount of R800.00including delivery and excluding VAT) No 9

Solid meranti horizontally slatted doors

G Purpose made pivot door and frame size 1780 X 2125mm,- Refer drawing attached - D6 No 1

ARCHITRAVES

Wrought Meranti

H 19 x 135mm High profiled architrave (Prime Cost amountof R60.00 including delivery and excluding VAT)

m 23

J 19 x 90mm Filler piece between door frame and architrave m 19

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 8Carpentry & Joinery2010J049House De Welzim

- 3 9 -

Page 41: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

A 19 x 30mm Filler piece between door frame and architrave m 4

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 8Carpentry & Joinery2010J049House De Welzim

- 4 0 -

Page 42: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 8

Carpentry & Joinery

SUMMARY

Page AmountNo

Total Brought Forward from Page No. -37-

-38-

-39-

-40-

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 4B - BUILDING WORKSBill No. 8Carpentry & Joinery2010J049House De Welzim

- 4 1 -

Page 43: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 9

CEILINGS, PARTITIONS AND ACCESSFLOORING

SUPPLEMENTARY PREAMBLES

Descriptions:

Items described as "nailed" shall be deemed to be fixed withhardened steel nails or pins or shot pinned to brickwork orconcrete or Bolted to steel trusses.

Items described as "plugged" shall be deemed to includescrewing to fibre, plastic or metal plugs at not exceeding600mm centres, and where described as "bolted" the boltshave been given elsewhere

CEILINGS

6.5mm Tapered edge Gypsum ceiling boards nailed to andincluding 38x38mm SAP brandering to bottom of timbertrusses at 400mm intervals, Apply 48mm RhinoTape overjoints and FibaTape over butt joints and apply one coatminimum 3mm RhinoLite or similar skim coat to a smoothand even polished finish

A Horizontal ceilings m2 57

25mm "Thermocoustex" ceiling boards with 48mmRhinoTape over joints and FibaTape over butt joints andapply one coat minimum 3mm RhinoLite or similar skimcoat to a smooth and even polished finish

B Raking ceilings between rafters on and including 38 x 38SA Pine brandering fitted over rafters at 350mm centres(each 3rd brandering substituted with purlins measuredelsewhere) m2 43

Gypsum board cornices

C 75mm Coved cornice m 111

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 9Ceilings Partitions and Access Flooring2010J049House De Welzim

- 4 2 -

Page 44: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

INSULATION

Glass wool insulation

A 75mm Insulation in blanket form closely fitted and laid ontop of brandering between roof timbers etc m2 57

B 75mm Insulation in blanket form closely fitted and laid onceiling between trusses etc m2 43

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 9Ceilings Partitions and Access Flooring2010J049House De Welzim

- 4 3 -

Page 45: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 9

Ceilings Partitions and Access Flooring

SUMMARY

Page AmountNo

Total Brought Forward from Page No. -42-

-43-

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 4B - BUILDING WORKSBill No. 9Ceilings Partitions and Access Flooring2010J049House De Welzim

- 4 4 -

Page 46: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 10

FLOOR COVERINGS, PLASTIC LININGS,ETC

FLOOR COVERINGS

Stretch Carpets on underlay (Prime Cost amount ofR350.00 installed and excluding VAT)

A On floors m2 35

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 4B - BUILDING WORKSBill No. 10Floor covering, Plastic linings2010J049House De Welzim

- 4 5 -

Page 47: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 11

IRONMONGERY

SUPPLEMENTARY PREAMBLES

Finishes to ironmongery

Where applicable finishes to ironmongery are indicated bysuffixes in accordance with the following list: BS Satin bronze lacquered CH Chromium plated SC Satin chromium plated SE Silver enamelled GE Grey enamelled AS Anodised silver AB Anodised bronze AG Anodised gold ABL Anodised black PB Polished brass PL Polished and lacquered PT Epoxy coated SD Sanded

HINGES, BOLTS, ETC

Brass

A 3mm X 120mm Ballbearing Hinge (Prime Cost amount ofR100.00 per pair including delivery and excluding VAT) No 5

LOCKS

Brass / Chromium Plated

B Cylinder sashlock (Prime Cost amount of R120.00including delivery and excluding VAT) No 5

C Double Cylinder (Prime Cost amount of R125.00 includingdelivery and excluding VAT) No 5

HANDLES

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 11Ironmongery2010J049House De Welzim

- 4 6 -

Page 48: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Brass

A Handle Pair (Prime Cost amount of R350.00 includingdelivery and excluding VAT) No 5

Refixing of existing ironmongery sets.

B Servicing and repairing all existing hinges, handles,locksets, etc removed from timber doors, and fitting intonew timber doors. No 9

BATHROOM FITTINGS

Accessories

C Toilet roll holders (Prime Cost amount of R400.00including delivery and excluding VAT) No 2

D Soapdish (Prime Cost amount of R150.00 includingdelivery and excluding VAT) No 5

E Towel rail (Prime Cost amount of R500.00 includingdelivery and excluding VAT) No 2

F Hand Towel rail (Prime Cost amount of R300.00 includingdelivery and excluding VAT) No 3

PELMETS AND CURTAIN TRACKS.

"Yakota Clipper" Curtain tracks with wall mountingbrackets plugged to brick walls.

G Double track m 23

SUNDRIES

Brass

H 3x32mm dividing strip m 4

J Brass magnetic doorstop (Prime Cost amount of R75.00including delivery and excluding VAT) No 5

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 11Ironmongery2010J049House De Welzim

- 4 7 -

Page 49: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 11

Ironmongery

SUMMARY

Page AmountNo

Total Brought Forward from Page No. -46-

-47-

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 4B - BUILDING WORKSBill No. 11Ironmongery2010J049House De Welzim

- 4 8 -

Page 50: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 12

METALWORK

SUPPLEMENTARY PREAMBLES.

The contractor and/or nominated/selected sub-contractor shallprepare and submit, at his own expense, three (3) copies ofshop drawings of all alluminium work, working or setting outdrawings shop details and schedules to the principal agent forapproval prior to commencement of manufacture. Correctionof shop drawings shall not constitute a change in scope of workunless the contractor notifies the principal agent in writingwithin seven (7) days and shall not proceed with fabricationuntil so authorized by the architect.

ALUMINIUM

Approved windows and sliding or sliding/folding doorswith glazing per AAAMSA standards (unless otherwisestated) with frames in "Black" powdercoating to SANBSANP3055 and with paintable acrylic sealant on internal sideand UV Resistant sealant to the external side betweenframe and steel member / plaster. Installation after curingof plastering. Protect against damage after installation. No'touch-ups' allowed. Profiles, glazing and installation toconform to AAAMSA standards.

Shop drawings are to be submitted and approved by thearchitect prior to installation.

A Window size 400 X 400mm high overall of one fixed panel. Refer drawing attached - W1 No 3

B Window size 600 X 1200mm high overall of one side hungopening sections and one fixed pane including adjustablefriction stay and window catch . Refer drawing attached -W2 No 7

C Window size 600 X 1800mm high overall of one side hungopening section and one fixed pane including adjustablefriction stay and window catch . Refer drawing attached -W3 No 12

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 12Metalwork2010J049House De Welzim

- 4 9 -

Page 51: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

A Window size 600 X 1800mm high overall of one side hungopening section and one fixed pane. All glazing to beobscure glass or sandblasted. including adjustable frictionstay and window catch . Refer drawing attached - W3 No 2

B Window size 900 X 1800mm high overall of two side hungopening sections and two fixed panes including adjustablefriction stay and window catch . Refer drawing attached -W4 No 2

C Window size 1200 X 900mm high overall of two side hungopening sections including adjustable friction stay andwindow catch . Refer drawing attached - W5 No 1

D Window size 900 X 2125mm high overall of three top hungopening sections and one fixed pane including adjustablefriction stay and window catch . Refer drawing attached -W6 No 1

E Window size 2540 X 2125mm high overall of six fixedpanes. Refer drawing attached - W7 No 1

F Sliding/folding door in five leaves size 3460 x 2125mmhigh overall including sliding mechanism, handles, flushbolts and cylinder lockset . Refer drawing attached - D1 No 1

G Sliding/folding door in five leaves size 3000 x 2125mmhigh overall including sliding mechanism, handles, flushbolts and cylinder lockset . Refer drawing attached - D2 No 1

H Sliding/folding door in five leaves size 3070 x 2125mmhigh overall including sliding mechanism, handles, flushbolts and cylinder lockset . Refer drawing attached - D3 No 1

J Sliding/folding door in three leaves size 2540 x 2125mmhigh overall including sliding mechanism, handles, flushbolts and cylinder lockset . Refer drawing attached - D4 No 1

K Window and Sliding door combination 3600 X 2125mmOverall consisting of a double aluminium sliding door size1800 X 2125mm high overall, in two equal sliding panels,and two windows size 900 X 2125mm on either side, eachhaving 3 top hung openings and one fixed pane - refer todrawing attached - D5 No 1

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 12Metalwork2010J049House De Welzim

- 5 0 -

Page 52: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

A Window 2400 X 2635mm high overall with one mullion andthree transoms creating eight equal sized panes and onesidelight below 400 X 2380mm high.(Timber doormeasured elsewhere) - refer to drawing attached - D6

No 1

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 12Metalwork2010J049House De Welzim

- 5 1 -

Page 53: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 12

Metalwork

SUMMARY

Page AmountNo

Total Brought Forward from Page No. -49-

-50-

-51-

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 4B - BUILDING WORKSBill No. 12Metalwork2010J049House De Welzim

- 5 2 -

Page 54: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 13

PLASTERING

GRANOLITHIC

Untinted granolithic, on concrete

A 50mm Thick on floors and landings m2 58

SCREEDS

1:4 Cement screeds wood floated on concrete

B 25mm Thick on floors m2 147

C Average 40mm Thick on floors to falls m2 2

INTERNAL PLASTER

Steel floated cement plaster on brickwork

D On walls m2 376

E On walls in patching m2 4

F On narrow widths m2 31

Cement plaster rendering coat followed by gypsum skimplaster finishing coat, on concrete

G On soffits of slabs m2 85

EXTERNAL PLASTER

Wood floated cement plaster on brickwork

H On walls m2 298

J On narrow widths m2 23

K Extra for plaster band 110mm x 20mm thick includingrounded edges m 206

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 13Plastering2010J049House De Welzim

- 5 3 -

Page 55: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Cement plaster on concrete

A On ceilings m2 37

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 13Plastering2010J049House De Welzim

- 5 4 -

Page 56: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 13

Plastering

SUMMARY

Page AmountNo

Total Brought Forward from Page No. -53-

-54-

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 4B - BUILDING WORKSBill No. 13Plastering2010J049House De Welzim

- 5 5 -

Page 57: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 14

PLUMBING AND DRAINAGE(PROVISIONAL)

SUPPLEMENTARY PREAMBLES

uPVC pipes and fittings:

Soil, waste and vent pipes and fittings shall be solvent weldjointed

uPVC pressure pipes and fittings:

Pipes for water supply shall be of the class stated

Pipes of 40mm diameter and smaller shall be plain ended withsolvent welded uPVC loose sockets and fittings

Pipes of 50mm diameter and greater shall have sockets andspigots with push in type integral rubber ring joints. Bends shallbe uPVC and all other fittings shall be cast iron, all with similarpush-in type joints

Copper pipes:

Pipes shall be hard drawn and half-hard pipes of the classstated. Class 0 (thin walled hard drawn) pipes shall not bebent. Class 1 (thin walled half-hard), class 2 (half-hard) andclass 3 (heavy walled half-hard) pipes shall only be bent withbenders with inner and outer formers. Fittings to copper waste,vent and anti-syphon pipes, capillary solder fittings andcompression fittings shall be "Cobra Watertech" type. Capillarysolder fittings shall comply with ISO 2016. Only compressionfittings shall be used in walls or in ground

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 14Plumbing and Drainage2010J049House De Welzim

- 5 6 -

Page 58: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Reducing fittings

Where fittings have reducing ends or branches they aredescribed as "reducing". In the case of pipes with diametersnot exceeding 60mm only the largest end or branch size isgiven. Should the contractor wish to use other fittings andbushes or reducers he may do so on the understanding that noclaim in this regard will be entertained. In the case of pipeswith diameters exceeding 60mm all sizes are given and noclaim for extra bushes, reducers, etc will be entertained

Exposed concrete surfaces

Exposed surfaces of concrete stormwater channels, coverslabs, inspection eye marker slabs, gulley tops, cleaning eyetops, catchpits, inspection chambers, etc shall be finishedsmooth with plaster

Excavations

No claim for rock excavation will be entertained unless thecontractor has timeously notified the quantity surveyor thereofprior to backfilling

"Soft rock" and "hard rock" shall be as defined in "Earthworks"

Laying, backfilling, bedding, etc. of pipes

Pipes shall be laid and bedded and trenches shall be carefullybackfilled in accordance with manufacturers' instructions

Where no manufacturers' instructions exist pipes shall be laid inaccordance with clauses 5.1 and 5.2 of each of the following: SABS 1200 L : Medium-pressure pipelines LD : Sewers LE : Stormwater drainage Pipe trenches etc shall be backfilled in accordance with clauses3, 5.5, 5.6, 5.7 and 7 of SABS 1200 DB : Earthworks (Pipe trenches) Pipes shall be bedded in accordance with clauses 3.1 to 3.4.1,5.1 to 5.3 and 7 of SABS 1200 LB : Bedding (Pipes). Unless otherwise described bedding of rigid pipes shall beclass B bedding

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 14Plumbing and Drainage2010J049House De Welzim

- 5 7 -

Page 59: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Wire gratings

Descriptions of gutter outlets etc shall be deemed to includewire balloon gratings

Flush pans

Flush pans shall have straight or side outlets and "P" or "S"traps as necessary

Stainless steelbasins, sinks, wash troughs, urinals, etc.

Units shall have standard aprons on all exposed edges andtiling keys against walls where applicable

Waste unions

Descriptions of waste unions shall be deemed to include rubberor vulcanite plugs and chains fixed to fittings

Steel sectional water tanks

Tanks shall comply with SABS CKS 114

Rainwater disposal

Description of "suspended" deem to include patent metalhangers as "Plumblink" Pear-shaped hanger bracket or similar of galvanised threaded rod let into soffit of concrete slab andother end fastened to galvanised strap around rainwater pipesuspended not exceeding 1m below soffit, including holes andbolting, not exceeding 1m apart.

Fixing of pipes

Unless specifically otherwise stated, all pipe work shall bechased into brickwork.

RAINWATER DISPOSAL

uPVC Pipes

A 110mm Pipes vertically in brickwork m 8

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 14Plumbing and Drainage2010J049House De Welzim

- 5 8 -

Page 60: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Extra over uPVC pipes for fittings

A 110mm bend No 2

"Fulbore" cast iron outlets

B 100mm Vertical outlet No 5

SOIL DRAINAGE (PROVISIONAL)

Underground quality PVC pipes

C 110mm Pipes laid in trenches not exceeding 1.00m deep m 24

Extra over PVC pipes for fittings

D 110mm ABC cleaning eye in end of pipe No 3

E 110mm Bend No 4

F 110mm Access junction No 3

G 110mm Access pipe No 1

Concrete encasement

H Encase soil pipe in 300 x 300 x 20MPa concrete including3 x Y10 top rebar and 3 x Y 10 bottom rebar and R 8Stirrups @ 500c/c m 3

SANITARY FITTINGS, ETC

NOTE: Prime Cost (PC) Amounts below include wastefittings, connectors, traps, ballcocks, delivery and excludeVAT etc. Contractor to allow for taking delivery,installation, testing and commissioning

White Vitreous China

J WC suite with Geberit concealed cistern and wall hungpan, including toilet seat (Prime cost amount of R 6000.00) No 2

K Basin on pedestal (Prime cost amount of R 2,500.00) No 1

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 14Plumbing and Drainage2010J049House De Welzim

- 5 9 -

Page 61: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

A Drop-in or sit-on basin (Prime cost amount of R 3000.00) No 2

B Free standing bath with centre outlet size 1700 x 700mm(Prime cost amount of R 16,000.00) No 1

"Toilet Friend 0720751339"

C Toilet extractor fan (Prime cost amount of R4000.00including delivery and excluding VAT) (Chasing intobrickwork by main contractor) No 2

TAPS, VALVES, ETC

NOTE: Prime Cost (PC) Amounts below include deliveryand excludes VAT, Contractor to allow for taking delivery,installation, testing and commissioning

Chromium Plated

D 15mm Shower mixer, arm and rose (Prime cost amount ofR 2500.00) plus shower trap and outlet (Prime costamount of R 350.00) No 1

E 20mm Bath mixer (Prime cost amount of R6000.00) withtwo discharge points, one through hand shower head, andthe other through bath mixer. each discharge point to beseparately connected.

No 1

F 15mm Topfix WHB Mixer (Prime cost amount of R2000.00) No 3

SANITARY PLUMBING

Waste water removal system from sanitary fitting toconnection with external sewer system / discharge intogulley, including testing of system.

G For one cluster servicing 1x WHB, 1 x WC on ground floorin new guest WC, including chasing pipes into existingbrickwork and joining into existing verticle waste dischargep i p e . No 1

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 14Plumbing and Drainage2010J049House De Welzim

- 6 0 -

Page 62: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

A For one cluster servicing 1 x WC and 2 x WHB, 1 x showerand 1 x bath on first floor (Main Bathroom) No 1

WATER SUPPLIES

Hot and cold water supply in Galvanized mild steel orClass 2 Copper or NHBRC approved alternative pipingfrom point of entry into building up to termination atsanitary fitting, including routing via electric water heaters,including testing

B For one cluster servicing 1x WHB, 1 x WC on ground floorin new guest WC, including chasing pipes into existingw a l l s No 1

C For one cluster servicing 1 x WC and 2 x WHB, 1 x showerand 1 x bath on first floor (Main Bathroom) No 1

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 14Plumbing and Drainage2010J049House De Welzim

- 6 1 -

Page 63: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 14

Plumbing and Drainage

SUMMARY

Page AmountNo

Total Brought Forward from Page No. -56-

-57-

-58-

-59-

-60-

-61-

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 4B - BUILDING WORKSBill No. 14Plumbing and Drainage2010J049House De Welzim

- 6 2 -

Page 64: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 15

TILING

SUPPLEMENTARY PREAMBLES

WALL TILING

Provide the Prime Cost amount of R300.00/m² includingdelivery and excluding VAT for 450 x 450mm porcelain tilesfixed with porcelain tile adhesive to plaster (plasterelsewhere) flush pointed with jointing compound.

A On walls m2 55

B On narrow widths m2 3

Polished Aluminium trims, listello's etc

C Corner trim (PC of R45.00/m including delivery andexcluding VAT) m 24

FLOOR TILING

Provide the Prime Cost amount of R300.00/m² includingdelivery and excluding VAT for 450 x 450mm porcelain tileswith porcelain tile adhesive including flush pointed withjointing compound.

D On floors and landings m2 112

Provide the Prime Cost amount of R900,00/m² includingdelivery and excluding VAT for 25 x 25mm mosaic tilesfixed with tile adhesive to screed (screed elsewhere) flushpointed with waterproof jointing compound.

E On floors to falls and currents m2 2

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 4B - BUILDING WORKSBill No. 15Tiling2010J049House De Welzim

- 6 3 -

Page 65: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 16

GLAZING

TOPS, SHELVES, DOORS, MIRRORS, ETC

6mm Silvered float glass copper backed mirrors withpolished edges holed for and fixed with chromium plateddome capped mirror screws with rubber buffers to plugs inbrickwork or concrete

A Mirror 400x600mm high No 3

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 4B - BUILDING WORKSBill No. 16Glazing2010J049House De Welzim

- 6 4 -

Page 66: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 17

PAINTWORK

PAINTWORK ETC TO NEW WORK

ON PLASTERBOARD

One coat primer and two coats "Dulux Trade 65" PVAemulsion paint in colours which have a value of 7 or lesson the Munsell system in accordance with SABS 1091

A On ceilings and cornices m2 68

ON FLOATED PLASTER

One coat primer and two coats "Dulux Weathershield" PVAemulsion paint in colours which have a value of 7 or lesson the Munsell system in accordance with SABS 1091

B On exterior walls and columns m2 298

One coat primer and two coats "Dulux Trade 65" or similarapproved PVA emulsion paint in colours which have avalue of 7 or less on the Munsell system in accordancewith SABS 1091

C On ceilings and beams m2 85

One coat primer and two coats "Dulux Weathershield" PVAemulsion paint in colours which have a value of 7 or lesson the Munsell system in accordance with SABS 1091

D Mouldings and bands not exceeding 300mm wide or girthin colours differing from surrounding work m 202

One coat primer and two coats "Dulux Trade 100" orsimilar approved PVA emulsion paint in colours whichhave a value of 7 or less on the Munsell system inaccordance with SABS 1091

E On internal walls m2 362

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 17Painting2010J049House De Welzim

- 6 5 -

Page 67: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

ON WOOD

One coat stain and two coats teac oil

A On doors and door frames m2 18

B On existing or re-used doors and door frames m2 13

C On skirtings and architraves not exceeding 300mm wide m 97

Carried to Collection R Section No. 2SECTION 4B - BUILDING WORKSBill No. 17Painting2010J049House De Welzim

- 6 6 -

Page 68: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 17

Painting

SUMMARY

Page AmountNo

Total Brought Forward from Page No. -65-

-66-

Carried Forward to Summary of Section No. 2 R Section No. 2SECTION 4B - BUILDING WORKSBill No. 17Painting2010J049House De Welzim

- 6 7 -

Page 69: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Section No. 2

SECTION 4B - BUILDING WORKS

SECTION SUMMARY - SECTION 4B - BUILDING WORKS

Bill Page AmountNo No

1 -23-Alterations

2 -24-Earthworks

3 -28-Concrete Formwork & Reinforcement

4 -29-Precast Concrete

5 -32-Masonry

6 -35-Waterproofing

7 -36-Roof Coverings etc

8 -41-Carpentry & Joinery

9 -44-Ceilings Partitions and Access Flooring

10 -45-Floor covering, Plastic linings

11 -48-Ironmongery

12 -52-Metalwork

13 -55-Plastering

14 -62-Plumbing and Drainage

15 -63-Tiling

16 -64-Glazing

17 -67-Painting

Carried to Final Summary R Section No. 2SECTION 4B - BUILDING WORKS2010J049House De Welzim

- 6 8 -

Page 70: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Unit Quantity Rate AmountNo

BILL 1

EXTERNAL WORK

WALL FENCING

Palisade wall

A Palisade wall consisting of: One brick wall in NFPbricks in class II cement mortar, 595mm high aboveNGL with a 85mm brick corbelling on top, and330X330mm columns 1385mm high above NGL ofNFP bricks in class II cement mortar with a460X460X85mm thick precast concrete column cap(PC amount of R300.00 delivered and installed,excluding VAT). Columns are spaced at a maximuminterval of 3170mm. The palisade wall and columns areall on a 700 X 300mm thick 20MPa concrete stripfooting excavated in earth. Including a 545mm highpalisade metal fence, of 38X25X1mm rectangulartubing, fitted between brick columns (PC Amount ofR600.00 per meter, delivered and installed, includingVAT) All exposed brick work are to be plastered with aexternal cement plaster to a smooth finish to receivetwo coats of external quality "Dulux Weathershield"paint. The palisade fence is to receive 1 coat primerand 2 coats of enamel paint. Provision should be madefor all items associated with the work to be completedat per the detail drawings attached.

m 3

Carried to Collection R Section No. 3SECTION 4C - EXTERNAL WORKSBill No. 1External Works2010J049House De Welzim

- 6 9 -

Page 71: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Boundary Wall

A Boundary street wall consisting of: One brick wall inNFP bricks in class II cement mortar, 1360mm highoverall above NGL with two 85mm brick corbelling asper drawings attached, and 330X330mm columns1385mm High above NGL of NFP bricks in class IIcement mortar with a 460X460X85mm thick precastconcrete column cap (PC amount of R300.00 deliveredand installed, excluding VAT). Columns are spaced at amaximum interval of 3170mm. The boundary wall andcolumns are all on a 700 X 300mm thick 20MPaconcrete strip footing excavated in earth. All exposedbrick work are to be plastered with a external cementplaster to a smooth finish to receive two coats ofexternal quality "Dulux Weathershield" paint. Provisionshould be made for all items associated with the workto be completed at per the detail drawings attached.

m 21

Carried to Collection R Section No. 3SECTION 4C - EXTERNAL WORKSBill No. 1External Works2010J049House De Welzim

- 7 0 -

Page 72: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Section No. 3

SECTION 4C - EXTERNAL WORKS

Bill No. 1

External Works

SUMMARY

Page AmountNo

Total Brought Forward from Page No. -69-

-70-

Carried to Final Summary R Section No. 3SECTION 4C - EXTERNAL WORKSBill No. 1External Works2010J049House De Welzim

- 7 1 -

Page 73: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Item Quantity Rate AmountNo

BILL 1

PROVISIONAL SUMS

Note:

All cost price items and provisional sums will be nett and noBuilder's discount will be applicable

BUDGETARY ALLOWANCES

Budgetary amount

A Allow the budgetary amount of R 30,000.00 for builderswork to be quantified Item 30,000 00

Contingencies

B Allow the amount of R 50,000.00 for contingencies. Item 50,000 00

BUILDERS WORK

Shutters to D1

C Allow the amount of R 20,000.00 for supply and installationof Timber Shutters to Folding Door D1 Item 20,000 00

D Profit Item

E Attendance Item

Handrails/Balustrades

F Allow the amount of R 30,000.00 for supply andinstallation of Handrails/Balustrades to stairways andbalconies Item 8,000 00

G Profit Item

H Attendance Item

Carried to Collection R Section No. 4SECTION 4D - PROVISIONAL SUMSBill No. 1Provisional Sums2010J049House De Welzim

- 7 2 -

Page 74: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Built In Cupboards

A Allow the amount of R 25,000.00 for design,supply andinstallation of Built In Cupboards Item 25,000 00

B Profit Item

C Attendance Item

Shower doors

D Allow the amount of R 4,000 for the supply and installationof shower doors Item 4,000 00

E Profit Item

F Attendance Item

Vanities With Natural Stone Tops

G Allow the amount of R 10,000.00 for the design,supply and installation of Vanities Item 1,000 00

H Profit Item

J Attendance Item

Quarts Carperts Around Pool

K Allow the amount of R 50,000.00 for the supply andinstallation of Quarts carperts around the pool area Item 50,000 00

L Profit Item

M Attendance Item

Fireplace

N Allow the amount of R 20,000.00 for supply and installationof a fireplace Item 20,000 00

P Profit Item

Q Attendance Item

Carried to Collection R Section No. 4SECTION 4D - PROVISIONAL SUMSBill No. 1Provisional Sums2010J049House De Welzim

- 7 3 -

Page 75: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

ELECTRICAL WORK

Internal Electrical installation

A Allow the amount of R 80,000.00 for the domestic electricalinstallation including light fittings Item 80,000 00

B Profit Item

C Attendance Item

Under Floor Heating Systems To New Rooms

D Allow the amount of R20,000.00 for the design, supply andinstallation of electrical based underfloor heating to theMain bedroom, Bathroom, Dresser and Lounge Item 20,000 00

E Profit Item

F Attendance Item

Under Floor Heating Systems To Existing Rooms

G Allow the amount of R10,000.00 for the design, supply andinstallation of electrical based underfloor heating to theGuest Room Item 10,000 00

H Profit Item

J Attendance Item

Air-Conditioning To Existing Rooms

K Allow the amount of R 15,000.00 for the supply andinstallation of Air-conditioning Units to Existing Guest room Item 15,000 00

L Profit Item

M Attendance Item

Air-Conditioning To New Rooms

N Allow the amount of R 30,000.00 for the supply andinstallation of Air-conditioning Units to new rooms Item 30,000 00

Carried to Collection R Section No. 4SECTION 4D - PROVISIONAL SUMSBill No. 1Provisional Sums2010J049House De Welzim

- 7 4 -

Page 76: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

A Profit Item

B Attendance Item

EXTERNAL WORK

Water supply and reticulation

C Allow the amount of R 5,000.00 for water supply mains,site reticulation and garden taps, etc

Item 5,000 00

D Profit Item

E Attendance Item

Gates

F Allow the amount of R 20,000.00 for the design, supplyand installation of gates Item 20,000 00

G Profit Item

H Attendance Item

Pool Seat

J Allow the amount of R 20,000.00 for the design, supplyand installation of the Pool Seat Item 20,000 00

K Profit Item

L Attendance Item

Carried to Collection R Section No. 4SECTION 4D - PROVISIONAL SUMSBill No. 1Provisional Sums2010J049House De Welzim

- 7 5 -

Page 77: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

Section No. 4

SECTION 4D - PROVISIONAL SUMS

Bill No. 1

Provisional Sums

SUMMARY

Page AmountNo

Total Brought Forward from Page No. -72-

-73-

-74-

-75-

Carried to Final Summary R Section No. 4SECTION 4D - PROVISIONAL SUMSBill No. 1Provisional Sums2010J049House De Welzim

- 7 6 -

Page 78: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

FINAL SUMMARY

Section Page AmountNo No

1 -15-SECTION 4A - PRELIMINARIES

Less credit for old materials listed in Bill 1 Alterations Item

2 -68-SECTION 4B - BUILDING WORKS

Sub-total R

Add: VAT @ 14% R

3 -71-SECTION 4C - EXTERNAL WORKS

4 -76-SECTION 4D - PROVISIONAL SUMS

Carried to Form of Tender R

2010J049House De Welzim

- 7 7 -

Page 79: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

SECTION 5

JBCC FORM OF TENDER

Page 80: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

House De Welzim

DMS Quantity Surveyors

Mr & Mrs De Welzim

Addition to a double storey residence

2010J049

12.00 23 February 2011

Page 81: SECTION 4 PRELIMINARIES & BILLS OF QUANTITIES De Welzim Tender Documents 02.pdf · Item Quantity Rate Amount No BILL 1 PRELIMINARIES NOTES NOTES: The agreement is to be the JBCC Series

23 February 2011

DMS Quantity Surveyors

Wapadrand Office Park, 90 Kingbolt Crescent, Wapadrand

Mr & Mrs. De Welzim

n/a

Addition to residence on erf 1210, Midstream Estates

Principal Building Contract

(012) 807 2501 086 661 3241 [email protected]