presentation heat ne (1)
TRANSCRIPT
![Page 1: Presentation heat ne (1)](https://reader031.vdocuments.us/reader031/viewer/2022020123/559db71b1a28ab1e3b8b4619/html5/thumbnails/1.jpg)
Mr. Ger CrosseDirector –Woodpecker Energy
Real World Examples
![Page 2: Presentation heat ne (1)](https://reader031.vdocuments.us/reader031/viewer/2022020123/559db71b1a28ab1e3b8b4619/html5/thumbnails/2.jpg)
Summary
• Range of Boilers
• Projects – Olympic Sailing Village 2012 UK
- Mixed Development UK(Shops/Houses)
- Care Home – Ireland
• RHI - Renewable Heat Incentive (UK)
• Woodpecker Energy - USA
![Page 3: Presentation heat ne (1)](https://reader031.vdocuments.us/reader031/viewer/2022020123/559db71b1a28ab1e3b8b4619/html5/thumbnails/3.jpg)
Boiler Range
• Residential/Small Commercial 25/45kW
• Small Commercial 150kW – 300kW
![Page 4: Presentation heat ne (1)](https://reader031.vdocuments.us/reader031/viewer/2022020123/559db71b1a28ab1e3b8b4619/html5/thumbnails/4.jpg)
Thermon – Commercial Sized Pellet Boiler
![Page 5: Presentation heat ne (1)](https://reader031.vdocuments.us/reader031/viewer/2022020123/559db71b1a28ab1e3b8b4619/html5/thumbnails/5.jpg)
Thermon – Commercial Sized Pellet Boiler
![Page 6: Presentation heat ne (1)](https://reader031.vdocuments.us/reader031/viewer/2022020123/559db71b1a28ab1e3b8b4619/html5/thumbnails/6.jpg)
Olympic Sailing Village 2012
Delivery into Plant Room Laying District Heating Pipe
![Page 7: Presentation heat ne (1)](https://reader031.vdocuments.us/reader031/viewer/2022020123/559db71b1a28ab1e3b8b4619/html5/thumbnails/7.jpg)
Olympic Sailing Village 2012
• Weymouth, England
• First site completed – hosting 400 athletes
• 78 contemporary homes
• Code Level 4
• 2 x 150kW Thermon and 1 x 300kW Thermonselected by ZeroC the developer
• Compact size of Thermon – decisive in selection
![Page 8: Presentation heat ne (1)](https://reader031.vdocuments.us/reader031/viewer/2022020123/559db71b1a28ab1e3b8b4619/html5/thumbnails/8.jpg)
‘Glove Factory’ -England
![Page 9: Presentation heat ne (1)](https://reader031.vdocuments.us/reader031/viewer/2022020123/559db71b1a28ab1e3b8b4619/html5/thumbnails/9.jpg)
‘Glove Factory’- England
• Glove Factory – a listed property built in 1872
• Ceased producing gloves after WWII
• Re-generation – mixed used urban quarter
• 37 houses/apartments, 3 shops, café/restaurant
• Code Level 5
• 150kW WoodpeckerThermon
![Page 10: Presentation heat ne (1)](https://reader031.vdocuments.us/reader031/viewer/2022020123/559db71b1a28ab1e3b8b4619/html5/thumbnails/10.jpg)
Care Home-Ireland
![Page 11: Presentation heat ne (1)](https://reader031.vdocuments.us/reader031/viewer/2022020123/559db71b1a28ab1e3b8b4619/html5/thumbnails/11.jpg)
Care Home - Ireland
• 43 bed Care Home – Tipperary, Ireland
• 150kW Thermon + 400 gallon Buffer Tank
• Reduced heating costs v’s Propane by 58%
• Now saving €12k ($17k p.a)
• Uses 70 tonnes pellet p.a
• Payback 3.5 years (no financial assistance/rebate)
![Page 12: Presentation heat ne (1)](https://reader031.vdocuments.us/reader031/viewer/2022020123/559db71b1a28ab1e3b8b4619/html5/thumbnails/12.jpg)
RHI - UK
• Government backed Renewable Heat Incentive
• Cash Back Scheme – 20 years
• <200kw 7.6p /kWhr (US$ 0.13/kWhr)
for first 1,314 hrs 1.9p – thereafter
• Free Heating
• Running Cost typically 3.5p-4.4p/kWhr
![Page 13: Presentation heat ne (1)](https://reader031.vdocuments.us/reader031/viewer/2022020123/559db71b1a28ab1e3b8b4619/html5/thumbnails/13.jpg)
Woodpecker Thermon
• Available in USA from June 2011
• ASME & UL Certification
• Manufactured in US
• First Orders received