palisades recreation center renovation &...

11
PALISADES RECREATION CENTER RENOVATION & EXPANSION Palisades Citizens’ Association April 5, 2016

Upload: others

Post on 19-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PALISADES RECREATION CENTER RENOVATION & EXPANSIONdgs.dc.gov/sites/default/files/dc/sites/dgs/publication/attachments/Palisades...May 16, 2004  · Design Build Team Name ROLE MCN

PALISADES RECREATION CENTER

RENOVATION & EXPANSION Palisades Citizens’ Association

April 5, 2016

Page 2: PALISADES RECREATION CENTER RENOVATION & EXPANSIONdgs.dc.gov/sites/default/files/dc/sites/dgs/publication/attachments/Palisades...May 16, 2004  · Design Build Team Name ROLE MCN

Agenda

• Introduction

• Local Team

• Local Success

• Responsive Design

• Next Steps

Page 3: PALISADES RECREATION CENTER RENOVATION & EXPANSIONdgs.dc.gov/sites/default/files/dc/sites/dgs/publication/attachments/Palisades...May 16, 2004  · Design Build Team Name ROLE MCN

Design Build Team

Name ROLE

MCN Build General Contractor

Cox Graae & Spack Architects Architect / Interior Designer

Delon Hampton & Associates Civil Engineer

Lee & Associates, Inc Landscape Engineer

Silman & Associates Structural Engineer

Setty & Associates Mechanical, Electrical & Plumbing Engineer

EHT Traceries Historic / Archeological Consultant

Polysonics AV/IT/Acoustics Consultant

Dan Triman LEED / Sustainability Consultant

Genis Design Specification Consultant

Grove Slade Traffic Consultant

GeoCapital Engineering GeoTech Consultant

Department of Parks & Recreation (DPR)

Marshella Wallace, Community Planner

Department of General Services (DGS)

Shahrokh Ghahramani, Project Manager

Page 4: PALISADES RECREATION CENTER RENOVATION & EXPANSIONdgs.dc.gov/sites/default/files/dc/sites/dgs/publication/attachments/Palisades...May 16, 2004  · Design Build Team Name ROLE MCN

True Local Team

Bassem Boustany

MCN Build

Principal-in-Charge

Joseph Khoury

MCN Build, Vice President of

Preconstruction Services

Raj Setty

Setty & Associates International PLLC

Principal

Don Gregory

Cox Graae + Spack Architects

Design Team Project Manager

Our vision for the Palisades Neighborhood Recreation Center is to be a place that

enhances the quality of life in its diverse community by providing opportunities for

lifelong physical activity and learning. Creating spaces and opportunities to connect

and engage, and by fostering a love of physical activity and healthy lifestyles.

Page 5: PALISADES RECREATION CENTER RENOVATION & EXPANSIONdgs.dc.gov/sites/default/files/dc/sites/dgs/publication/attachments/Palisades...May 16, 2004  · Design Build Team Name ROLE MCN

Local Success

• DUKE ELLINGTON SCHOOL OF THE ARTS, Washington, DC

• BENNING STODDERT COMMUNITY CENTER, Washington, DC

• RIDGE ROAD RECREATION CENTER, Washington, DC

• JESSE RENO ROSE SCHOOL, Washington, DC

• KIPP DC - WEBB CAMPUS, Washington, DC

• CAPITAL CITY PUBLIC CHARTER SCHOOL, Washington, DC

• WILSON SENIOR HIGH SCHOOL, Washington, DC

• THE PHILLIPS COLLECTION, Washington, DC

• LUBBER RUN COMMUNITY CENTER, Arlington, VA

• FAIRLINGTON COMMUNITY CENTER, Arlington, VA

Page 6: PALISADES RECREATION CENTER RENOVATION & EXPANSIONdgs.dc.gov/sites/default/files/dc/sites/dgs/publication/attachments/Palisades...May 16, 2004  · Design Build Team Name ROLE MCN

Responsive Design

Page 7: PALISADES RECREATION CENTER RENOVATION & EXPANSIONdgs.dc.gov/sites/default/files/dc/sites/dgs/publication/attachments/Palisades...May 16, 2004  · Design Build Team Name ROLE MCN

Responsive Design

Page 8: PALISADES RECREATION CENTER RENOVATION & EXPANSIONdgs.dc.gov/sites/default/files/dc/sites/dgs/publication/attachments/Palisades...May 16, 2004  · Design Build Team Name ROLE MCN

Responsive Design

Page 9: PALISADES RECREATION CENTER RENOVATION & EXPANSIONdgs.dc.gov/sites/default/files/dc/sites/dgs/publication/attachments/Palisades...May 16, 2004  · Design Build Team Name ROLE MCN

Responsive Design

Page 10: PALISADES RECREATION CENTER RENOVATION & EXPANSIONdgs.dc.gov/sites/default/files/dc/sites/dgs/publication/attachments/Palisades...May 16, 2004  · Design Build Team Name ROLE MCN

• Workshop #1

• Listening & Visioning (April 19, 2016 at 7:00PM)

• Workshop #2

• Design Team Response

• Workshop #3

• Consensus

Next Steps