PP 12 Weekly Planning Rhythm
Thurs Fri SatSun
1300-1500W OPT VTC
1100W read ahead slides
posted to APAN
1000W CA WG
1300W LOG WG
1200W MED WG
1300W FP WG Every other week
Mon Tues Wed
1000W COMMS WG
1430W Comm Integration WG
CPF N3 Semi-Monthly Update
1200W ENG WG
Effective 09 JAN
4
UNCLASSIFIED
UNCLASSIFIED
SEP
OCT
NOV
DEC
JAN
FEB MAR
APR
MAY
JUN
JUL AUG
Mission Planning/CONOPS (CPF)
Meetings/Conferences (CPF/CDS)
Force Sourcing (CPFN3)
Interagency Coord (CPF N5)
NGO Coordination (CPF N5)
Partner Nations (CPF N5/C7F)
Transit Plan (CPF/CDS)
Funding/Authorizations (CPF)
Communications (CPF N6)
Assessment (CPF MAG)
Detailed CONOPS (CDS)
PDSS/Advanced Echelon (CDS)
Deployment (CDS)
Planning Timeline
Advanced Echelon
Deployment
MOU Letters Signed
PN Invitation letters
Assessment plan
EXORD
Systems
CPF RFF
Mid Planning Conference
Initial Planning Conference
Initial
PLANORD
PDSS
FSLO Letter
Final
Requirements
5
UNCLASSIFIED
UNCLASSIFIED
ADF Planning Status
General Planning• CJOPS Decision Brief for PP12 signed.
Command• Nomination of O-5 for position of COMASC submitted.• Call for nominations for ASNCE staff sent via signal.
Engineering• Two (2) ADF engineers participated in Indonesia PDSS. Still awaiting
Post Activity Report.• Authorization to lead as FIE for Indonesia mission still to come from
IPDIV.
Medical • Awaiting nominations for ADF Health PP12 positions from Services.
No Change
6
UNCLASSIFIED
UNCLASSIFIED
ADF Participation
Australia
• Command Element
• Engineering Section
• Medical Personnel contribution of 15 – 20 pers in each contingent
Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines
Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the
conclusion of mission in Cambodia
Health manning TBC in late November
HQJOC Health PP12 POC:CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans)
No Change
7
UNCLASSIFIED
UNCLASSIFIED
PP12 RFI Tracker
Number Status Date Req Responsible
Question Other
ADF-001 Closed 11 Nov 11 PACFLT Request a copy of the Indonesian PDSS itinerary
ADF-002 Open 11 Nov 11 PACFLT Status of Partner Nation invitation letter
No Change
8
UNCLASSIFIED
UNCLASSIFIED
JSDF Planning Status
• CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. - Studying other activities - Decision after completion of
PDSS Vehicles - JMSDF Ship (TBD× 1 ) - JASDF Aircraft ( C-130 or KC-767× 1)
Medical team - Approximately 20~30
No Change
9
UNCLASSIFIED
UNCLASSIFIED
JSDF Planning Status
• PDSS-Request re-survey Philippines with U.S. survey team in FEB or MAR 2012
• Humanitarian community in Japan - Not yet access
• POC PRI : LCDR Haga : [email protected] DSN:224-7714 or 7723 SEC: LCDR Yamaguchi : [email protected]
No Change
10
UNCLASSIFIED
UNCLASSIFIED
JSDF Planning Status
Number Status date WG Requests/Questions Comments
JPN -001 19 OCT PDSSDraft plan of PDSS in Philippine and Vietnam
JPN-002 30 NOV PDSSReq. re-survey with US survey member in FEB or MAR.
No Change
11
UNCLASSIFIED
UNCLASSIFIED
NZDF Planning Status
Decision by COMD Joint Forces New Zealand is to deploy a small multi-disciplinary health team for the duration of the deployment to Vietnam 10 – 24 Jul 12.
Contingent: Plan to embark USNS MERCY in Subic Bay Philippines / disembark at the conclusion of mission in Vietnam.
MAJ BROOKS – will attend Main Planning Conference (30 - 31 Jan in San Diego)as HQ JFNZ Rep. Now registered into APAN, awaiting membership to PP12 accounts.
Medical Personnel contribution: Manning TBC in early December (8 – 12 pers)
New HQJFNZ Health PP12 POC: MAJ Andrew BROOKSDDI: +64 4 529 [email protected]
No Change
12
UNCLASSIFIED
UNCLASSIFIED
CPF FOPS Update
Manning Update- FFC change in sourcing priorities- Augmentation package is now out for
Joint Sourcing w/ a suspense of 23 Jan- Commitment received for med
personnel- 32 non-med personnel still outstanding
- CPF PLANORD released
13
Medical Update
• Medical WG Telcon held Tuesday, 17 January 2012, 1200 hrs
• Identified Medical Planner to assist with Medical CONOPS development
• Finalizing details for Medical Assessment visits to the Philippines and Cambodia
14
UNCLASSIFIED
UNCLASSIFIED
Engineering Update
Site Survey Projects Recommended SMEE Request Philippines 3 schools & 1 medical clinic Seawall-Dr. LinCambodia 3 health centers Bldg; P&E; CCADIndonesia 3 health centers & 1 school Seismic; Disaster Vietnam 2 health centers Disaster; Safety
Australian Defence Force approval is approximately 90% complete. -ADF determination of FIE will follow site survey report
Philippine Project Package preparation (ACB1 lead- BUC Sarmiento)
Cambodia Project Package preparation (NMCB40 lead)
Indonesia Project Package preparation (ADF lead/NMCB40 Alt)
Vietnam Project Package preparation (NMCB40 lead)
Completed On-track Off-Track/Recoverable Off-Track not recoverable
15
UNCLASSIFIED
UNCLASSIFIED
Engineering Update
NALO Flight request submissions.
- Confirm ability to land NALO C-130 at Talaud Airport, Indonesia. Inability will require using a combination of Manado Airport and commercial surface shipping.
- Confirm ability to land NALO C-130 at Calbayog City, Samar Philippines.
- Vietnam mission will require NALO C-130 to land at Hanoi IOT clear customs, movement of equipment and PAX to Nghe An Province via contracted trucks and passenger bus.
Identify all customs and entry requirements for Indonesa, Philippines,And Vietnam.
- Visa requirements for PAX (30+ days)- Required documents for tools and equipment (customs process
and US Embassy customs POCCompleted On-track Off-Track/Recoverable Off-Track not recoverable
16
UNCLASSIFIED
UNCLASSIFIED
Logistics Update
• Logistics WG held 17 Jan 12
• Funding– APRI
• MTF MERCY received $600K of required $1.9M • Pharmaceuticals and Consumables
– Working with DLA to place initial orders• Donation Material
• Next Logistics WG meeting scheduled for 24 JAN 12
17
PP12 Supply and Logistics StatusFUNDING (17JAN12)
17 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Item / Task Status Action Date Req Notes
APRI CPF/SUPPO
31JAN12 - APRI ($600K of $1.9M required received)
ORF C7F/SUPPO
07FEB12 - Requirements review in progress
OCO CPF/SUPPO
15APR12 - Requirements review in progress
18 18 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Item / Task Status Action Date Req Notes
Indonesia Load List
SUPPO 03FEB12 - Load list developed pending MPC update(s).- Final pharmaceutical list due to FLC Yokusuka contracting post MPC for contract award determination - Requisitioning of standard consumable items commencing week of 17 Jan 12
Philippines Load List
SUPPO 03FEB12 - Load list developed pending MPC update(s)- Requisitioning of standard pharmaceutical and consumable items commencing week of 17 Jan 12
Vietnam Load List
SUPPO 03FEB12 - Load list developed pending MPC update(s).- Final pharmaceutical list due to FLC Yokusuka contracting post MPC for contract award determination - Requisitioning of standard consumable items commencing week of 17 Jan 12
Cambodia Load List
SUPPO 03FEB12 - Load list developed pending MPC update(s)- Requisition of standard pharmaceutical and consumable items commencing week of 17 Jan 12
PP12 Supply and Logistics StatusPHARMACEUTICALS and CONSUMABLES (17JAN12)
19 19 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Item / Task Status Action Date Req Notes
Load Plan MSC/SUPPO
31JAN12 - Load plan developed pending MSC MERCY approval- 240 pallet maximum established
Project Handclasp
SUPPO 15MAR12 - Preparations ongoing with POC
LDS SUPPO 15FEB12 - Preparations ongoing with POC
Worldwide VETs
SUPPO 15MAR12 - Preparations ongoing with POC
PP12 Supply and Logistics StatusDONATION MATERIAL (17JAN12)
20
PP12 Civil Affairs WG
20 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Item / Task Status Action Date Req Notes
CJ-CMCC Concept Paper Dev DESRON 17 JAN
- Awaiting chops from: DESRON , MERCY,- Chops received from PP 09, 10, 11 reps, COE-DMHA (IHC) -19 JAN CAWG will focus on final inputs
CMCC Battle Rhythm and Wagon Wheel Sych
DESRON 19 JAN - Discussed 13 JAN at C3F, awaiting DESRON battle rhythm to synch with.
Non-Medical SMEE CONOPS Draft Plan CAWG 23 JAN - On track
Operational Assessment Plan CAWG MAR 12
- Assessment WG meeting 20 JAN to produce draft task list which will go out to all WG for validation.-Geared toward MOPs
Strategic Assessment Plan CAWG APR 12
- Geared towards Theater Strategic Objectives
NGO and Partner Nation Engagement Process
CAWG /CPF N5
MPC
- 80% plan post MPC but add-ins will be ongoing.
21 21 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Item / Task Status Action Date Req Notes
IT & Radio Operator Manning
CPF N3/ CDS /
15JAN12 -Each MEDCAP = 1-IT (HERS) - JCSE IEP (3 ea +OIC= 7 pers ) approved 05DEC- 4+Remote MEDCAP manning review.-Ashore Command Center
Annex K / COMM Plan
CPF/ C3F/CTF-76/CDS
PRE-MPC
- IAW NTTP 3-57 Navy HCA OPS-Based on PN/HN COMM interoperability assessments and simultaneous missions.-OPTASK COMMS required.
BGAN SATCOM
CPF N6/CDS POST-
MPC
- Not required for PDSS. (17OCT11 CDS-7 N6 email).- OPTEST CPF BGANs (FEB12).- Develop CONOPS for BGAN use.
Host Nation Spectrum Mgt
C7F/CTF-76 /CDS
PRE-MPC -Determine frequency restrictions for each host nation.
PP12 CIS Information Systems Status(18JAN12)
22 22 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Item / Task Status Action Date Req
Notes
PAO Network CPF PAO/N6/ CDS/MERCY
PRE-MPC -Defense Video & Imagery Distribution System (DVIDS) : PAO confirmed system is available. Ashore use only.- Verified Fast File Transfer (FFT) SW (version 2.43) Installed in MERCY. FFT IATO cert. in progress at CYBERFOR.
PN-NGO Business Center(SSC LANT CHARLESTON)
CPF N6 / CDS/MERCY
APR12 -SPAWAR PN-NGO Business Center (Wireless and terminals) is the afloat solution. -MERCY to coordinate refresh/OPTEST/training in San Diego by SPAWAR. SOW in development (09JAN12).- CDS procure printer consumables for entire mission.-IA/business rules provided CDS-7 N6 03NOV11.
Partner Nation Interoperability
CPF N6 / CDS
POST-MPC
-Verify Partner Nation (PN) CIS POCs.-Verify APAN accounts for all PN CIS WG team members.-PN CIS capability review.-Develop CIS Interoperability Matrix in Annex K.
HumanitarianElectronic Record System
CIS WG/CDS N6
TBD -HERS funded by MARFORPAC Experimental Center (MEC)-System status: in development.
PP12 CIS Information Systems Status(18JAN12)
23 23 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Item / Task Status Action Date Req
Notes
Remote MED-DENCAP /CC Comms Arch
CDS / CPF
PRE-MPC
-UHF data and voice SATCOM/LOS Comms for CAP to air/ship.-Identify CIS Element architecture and inventory.
Host Nation MIL C4
PDSS OIC
PDSS AAR
-PDSS OICs for assessment action.-Training provided to Blue Team 21OCT11.
Host NationCIVIL Comms
PDSS OIC
PDSS AAR
-PDSS OICs for assessment action.-Training provided to Blue Team 21OCT11.
Remote Site US Mission CISAssessment
PDSS OIC/AOIC
PDSSAAR
-JCSE Planner not included in PDSS. PDSS AOIC to conduct assessments with provided checklists and guidance.-Command Center (CC) Comms assessment.-Training provided to Blue Team 21OCT11.
PDSS CISComms
CPF/ CDS PDSS OICs
PRE-PDSS
-Iridium Phones: CPF N6 issued phone to Blue OIC.-In country cell phones: MERCY to provide from PP10 mission phones.-Automated Data Collection (8 cell phones app) issued to OIC.
PP12 CIS Information Systems Status(18JAN12)
No Change
24 24 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Item / Task Status Action Date Req
Notes
Knowledge Management /Data Protection
CDS/MERCY
TBD -MEDCAP/CDS/Mission Data storage and protection
Command Center Ashore CIS
CDS PDSSAAR
-Identify configuration and location in each country.
IT SMEERequests
CDS PDSS AAR
-PDSS determine scope (SYSADMIN, repair, training, etc.).
SATCOM Requests
C3F/C7F/CDS
FEB12 -Standard USN process.
Mission COMMs Readiness
CDS /MERCY
APR12 -Pre-deployment COMM Checks (DVIDS, FTP, FFT, NMCI FAS, MERCY COMMs Suite)
PP12 CIS Information Systems Status (18JAN12)
25 25 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Item / Task Status Action Date Req
Notes
FSET on MERCY
CPF /MSC
TBD - Field Service Engineering Team (FSET) rqmt for San Diego to Hawaii cost estimate from SPAWAR requested 22NOV. Requested SOW status (10JAN12).-Funding transfer to SPAWAR TBD
End of Mission CIS Exit Plan
CPF/CDS
TBD - Hardware: Transfer custody of loaned CIS items back to CPF-Data Exit Plan: TBD
VHF Handheld Radios
CPF/CDS
FEB12 -CDS determine required quantities
ADVON CIS CDS Pre-MPC -CDS determine requirements.
Embarked Documentary Team
CDS Ongoing -CDS determine requirements and set expectations-Afloat connectivity limited to NGO Business Center
PP12 CIS Information Systems Status(18JAN12)
26
UNCLASSIFIED
UNCLASSIFIED
Force Protection Update
• MFP sourcing drop dead date and branch plan
• TA possibilities (hotels, routes, etc)
• HN/In country coordination update
• Pre-Deployment travel Requirements– Updated ISOPREPs– APACS– iATP– AOR location specific brief– Level I ATFP– SERE 100 B
27
UNCLASSIFIED
UNCLASSIFIED
Public Affairs Update
- Admin• Mission PAO to DC 15-18 JAN for CHINFO/OSD/DOS
meetings/coordination for mission roll-out
- Media Coordination• CAPT Breslau, LCDR Lohmeyer will meet with Warner Bros. and
NAVINFO WEST in LA 25 JAN
28
UNCLASSIFIED
UNCLASSIFIED 28
Item/Task Status Action Suspense Date
Notes
PAG CDS PACPF PA
TBD Draft to CDRE 15 DECRouting will happen D-30 to 45 days
DC media trip/mission announcement
NS CDS PA APR 2012
PP Fact Sheet CDS PA, CPF PA
30 DEC Mission info to NAVINFO WEST for vetting
Smartphone SOP
NS CIWG, CPF Social Media
15 MAR
Online presence brief
CDS PA, CPF PA
9 DEC Social media, websites, etc
Completed On-track Off-Track/Recoverable Off-Track not recoverable
Public Affairs Update
29
UNCLASSIFIED
UNCLASSIFIED
Item/Task Status Action Suspense Date
Notes
Equipment requirements
CDS PA, NPASE
TBD Dialogue initiated w/ MERCY on 04 JAN
PO&AM inputs CDS PA, CPF PA
14 DEC Due to FOPS.PA-specific updates in progress
Media Training Plan
CDS PA
TBD Training to CDS leadership and mission participants
COMREL purchase list
CPF PA
TBD Will request final approval after MPC
29 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Public Affairs Update
30
UNCLASSIFIED
UNCLASSIFIED
PP12 Communication Integration
• Finalizing products to support detailed communication planning and assessment for each location (due 30 JAN)
• Coordinating communication assessment support for PP12 (MAY – SEP 12)
– Include “baseline” and post-mission support
• Next CIWG meeting scheduled for: 19 JAN 12
• AMEMB Cambodia, Vietnam Telecons being coordinated
31
PP12 Communication Integration
31 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Item / Task Status Action Date Req Notes
Stakeholder Analysis
CIWG 15 NOV - Initial product completed. Briefing with Commodore Morgan scheduled for early Dec.
Characterize Information Environment
CPF N2/N39
15 NOV – 30 JAN
-Political Military Economic Social Infrastructure and Information (PMESII) product status is as follows: Cambodia 100%, Indonesia 100%, Vietnam 99%, Philippines 95%.
Communication Strategy/ Implementation Plan
CPF N2/N39
31 DEC - This product will detail integrated approach for internal, external messaging. This product will be a draft until finalized as an Annex to the CPF PP12 Campaign Plan.
Identify/Coordinate key messaging events
CIWG 15 JAN - Identified; coordinating CIWG support:-- ETG Leadership Training-- MPC Assessment planning-- SLV support
Develop messaging products
CIWG/ CPF N2/N39, PA
15 APR - Not started.
32
PP12 Communication Integration
32 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Item / Task Status Action Date Req Notes
Develop communication MOE Indicators
CIWG/ N2/N39
15 JAN - Part of overall PP12 assessment effort.
Define Communication assessment methodology
CPF N2/N39
30 JAN - Part of overall PP12 assessment effort.
Coordinate and monitor communication during execution
CPF N2/N39
During PP12
- Not started. Part of overall PP12 assessment effort.
Conduct communication assessment
CIWG During PP12
- Not started.
Develop AAR CPF N2/N39, PA
30 SEP - Not started.
34
Mission Commander Priorities
• Country CONOPS Development– 23-Jan-12 COUNTRY CONOPS (DRAFT) TO CDRE– 30-Jan-12 MPC (PRESENT DRAFT CONOPS)
– C2/Task Organization Proposal (next slide)• CMCC / ENG / MED / EST / Shore FP – requires additional C2 slides
to show organization and relationships
– Issues:• Dedicated medical planner
– Prioritized list of MEDCAPs to aid in SOM development• Veterinarian – tasked w/ COBRA GOLD & day job; adversely affects
contribution to CONOPS• Need refined SMEE list for each country• EAP input• Determining Medical contingent for ADVON / Mission
– LT Owens – incorrect specialty code, may be ineligible for ADVON
– CDR Currie – unable to participate in mission/deploy– LTJG Ward – only med planner
35
ProposalNOTE: CMCC, ENG, MED, EST, Shore FP – requires additional C2 slides to show organization and relationships
36
• MPC– Official agenda released in announcement message (CDS7 062325ZJAN12)– 29JAN12 – Civilian Participant Planning and Discussion (USNS MERCY)– 30-31JAN12 – MPC (Admiral Kidd Conference Center)
DUE DATE COG TOPIC TASK DESCRIPTION STATUS18-Nov-11CPF / CDS7 - N1 MPC OBTAIN VENUE (RESERVATION) FOR MPC (ADMIRAL KIDD) COMPLETED18-Nov-11CPF MPC FUNDING APPROVED FOR MPC COMPLETED2-Dec-11CDS7 - N3 MPC OBTAIN DRAFT AGENDA FROM PREVIOUS MPC COMPLETED
16-Dec-11CDS7 - CS1 RUBIO MPCDV GIFT TRACKER (TBD - DEPENDS ON RFI TO CPF) - GIFT FOR MPC = COINS COMPLETED
16-Dec-11CDS7 - CS1 RUBIO MPC ORF FOR DV GIFTS (TBD - DEPENDS ON RFI TO CPF) IN PROGRESS16-Dec-11CDS7 - N3 MPC SOCIAL - DETERMINE VENUE COMPLETED
16-Dec-11CPF - LCDR RIOS MPC RFI: DV GIFTS (PRIVATE) - DETERMINE PROTOCOL / APPROPRIATENESS COMPLETED16-Dec-11CPF MPC OBTAIN POC INFO FOR WELCOME LETTERS / PACKAGES COMPLETED
28-Dec-11CPF / CDS7 - N1 MPC
SEND OUT MPC INVITATIONS [INCLUDE SOCIAL FEES, UNIFORM REQUIREMENTS, BRIEF SUBMISSION GUIDELINES, INTERPRETERS, POC INFO, RSVP DATE & TRAVEL INFO, NO HOST SOCIAL, ATTIRE, AGENDA, DELIVERABLES] COMPLETED
28-Dec-11CPF / CDS7 - N1 MPC LODGING ARRANGEMENTS [COURTYARD MARRIOT - LIBERTY STATION] COMPLETED28-Dec-11CDS7 - N3 MPC SEND OUT ANNOUNCEMENT MESSAGE COMPLETED28-Dec-11CDS7 - N3 MPC PROMULGATE AGENDA FOR PP12 MPC COMPLETED
28-Dec-11CDS7 - N3 MPCPROMULGATE BRIEF COLLECTION / TIMELINE FOR SUBMISSION (PLACE IN MSG - UNCLAS ONLY, NO FOUO) COMPLETED
28-Dec-11CDS7 - N3 MPC SOCIAL - RESERVATION COMPLETED11-Jan-12CPF MPC GOV PURCHASE CARD / CONTRACT COMPLETED
11-Jan-12CPF MPCARRANGE REFRESHMENT/SETUP PACKAGE (WATER, COFFEE, LINEN, PODIUM, MICROPHONE, PROJECTORS) COMPLETED
20-Jan-12CPF / CDS7 - N3 MPCARRANGE VANS/TRANSPORTATION [6 VANS / 4X HN DV, 2X TRANSPORTATION] IN PROGRESS
Mission Commander Priorities (continued)
37
DUE DATE COG TOPIC TASK DESCRIPTION STATUS
20-Jan-12CPF / CDS7 - N3 MPCSOCIAL - TRANSPORTATION REQUIREMENTS (1 VAN - REQUEST TO BE ROUTED) IN PROGRESS
23-Jan-12CPF MPC DV TRANSPORTATION / TRAVEL IN PROGRESS
23-Jan-12CPF MPCIDENTIFY DV ESCORTS [TENTATIVE LIST - PENDING FORMAL RSVP] IN PROGRESS
23-Jan-12CDS7 - N1 MPC ASSEMBLE PARTICIPANT LIST (RSVP) / POC LIST IN PROGRESS23-Jan-12CPF MPC ARRANGE INTERPRETERS FOR PN / HOST NATION IN PROGRESS23-Jan-12CDS7 - FPO MPC BASE ACCESS REQUEST IN PROGRESS
23-Jan-12CDS7 - N3 MPCVENUE PARKING ARRANGEMENTS [COORDINATE WITH ADMIRAL KIDD] COMPLETED
24-Jan-12CDS7 - PAO MPC CDRE OPENING / CLOSING REMARKS [SPEECH] IN PROGRESS25-Jan-12CDS7 - N3 MPC STAFF PLAN (ROLES & RESPONSIBILITIES) IN PROGRESS25-Jan-12CDS7 - N3 MPC VENUE SETUP PLAN IN PROGRESS
25-Jan-12CDS7 - N3 MPC
SECURE ADDITIONAL PERSONNEL TO ASSIST WITH MPC EXECUTION: VAN DRIVERS, PARKING ATTENDANTS, CHECK-IN DESK, SET-UP/BREAKDOWN TEAM IN PROGRESS
27-Jan-12CDS7 - N1 MPC NAMETAGS / BADGES IN PROGRESS
27-Jan-12CDS7 - N1 / N2 / PAO MPCWELCOME PACKAGE: AGENDA, POC LIST, LOCAL ESTABLISHMENTS, MAPS/DIRECTIONS, SOCIAL EVENT INFO IN PROGRESS
27-Jan-12CDS7 - N2 / N3 / PAO / N6 MPC
VENUE SETUP: SIGNAGE, CHECK-IN TABLE, FOOD TABLES, MAIN AREA, BREAKOUT SESSION, DV ASSIGNED SEATING/NAME PLACARDS, A/V, WHITEBOARDS / EASELS, DRY ERASE MARKERS [RFI - WHEN CAN SETUP BEGIN] IN PROGRESS
27-Jan-12CDS7 - N3 MPC DRAFT CONOPS PRINTED IN BINDERS FOR DVS IN PROGRESS
30-Jan-12CDS7 - N1 MPCCONFERENCE [SOCIAL] FEES / COLLECTION / PRICING / RECEIPT BOOK IN PROGRESS
30-Jan-12CDS7 - N1 MPC SOCIAL - FUNDING IN PROGRESS30-Jan-12CDS7 - N6 MPC ELECTRONICS SETUP (PROJECTOR / LAPTOPS) IN PROGRESS30-Jan-12CDS7 - PAO MPC PHOTO SESSION - EQUIPMENT, PHOTOGRAPHER, LOCATION IN PROGRESS
3-Feb-12CDS7 - N3 MPCDISTRIBUTE BRIEFS POST MPC (APAN) [UNCLAS ONLY, NO FOUO] IN PROGRESS
Mission Commander Priorities (continued)
• MPC - POA&M (continued)
38
Mission Commander Priorities (continued)
• CMCC TTX (01FEB12)– Initial objectives:
• Organization review• Job description assignment• Workspace familiarization• Communications familiarization• CMCC problem solving (scenario – walk-thru/talk-thru)
– Participant List TBD• SLV preparations
– Issues:• CPF participant requested• Vietnam visas• Agenda / KLE
• Miscellaneous– Manning / Billet gaps– Proposed Mission Planning Rhythm in development– CMCC Watchfloor products in development:
• SORM / SOPs• Watchbills• PPRs