pacific partnership 2012 this brief is classified: unclassified 15 feb 12 opt brief

37
PACIFIC PARTNERSHIP 2012 This brief is classified: UNCLASSIFIED 15 FEB 12 OPT Brief

Upload: dennis-holmes

Post on 25-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

PACIFIC PARTNERSHIP 2012

This brief is classified:UNCLASSIFIED

15 FEB 12OPT Brief

2

UNCLASSIFIED

UNCLASSIFIED

Roll Call

• CDS-7• State Dept – Mr. Weinz• USNS MERCY• AUS HQ JOC• HQ JFNZ (RTN 29FEB)• JSDF• FLC-Yokosuka• C7F

• C3F• CTF 76• 351st Civil Affairs Command• DLA Troop Support - Pacific• ETG• 30th NCR• HSC-21 DET 2• MCAST

Blue: Normal participants not expected to attend VTC due to scheduling conflict.

3

UNCLASSIFIED

UNCLASSIFIED

PP 12 Weekly Planning Rhythm

Thurs Fri SatSun

1300-1500W OPT VTC

1100W read ahead slides

posted to APAN

1000W CA WG

1300W LOG WG

1200W MED WG

1300W FP WG Every other week

Mon Tues Wed

1000W COMMS WG

1430W Comm Integration WG

CPF N3 Semi-Monthly Update

1200W ENG WG

Effective 09 JAN

4

UNCLASSIFIED

UNCLASSIFIED

SE

P

OC

T

NO

V

DE

C

JA

N

FE

B

MA

R

AP

R

MA

Y

JU

N

JU

L

AU

G

Mission Planning/CONOPS (CPF)

Meetings/Conferences (CPF/CDS)

Force Sourcing (CPFN3)

Interagency Coord (CPF N5)

NGO Coordination (CPF N5)

Partner Nations (CPF N5/C7F)

Final Transit Plan (CDS)

Funding/Auths (CPF N5/N00F)

Communications (CPF N6)

Assessment (CPF MAG)

Detailed CONOPS (CDS)

PDSS/Advanced Echelon (CDS)

Deployment (CDS)

Planning Timeline

Advanced Echelon

Deployment

MOU Letters Signed

EXORD

Systems

CPF RFF

Mid Planning Conference

Initial Planning Conference

Initial

PLANORD

PDSS

FSLO Letter

Final

Requirements

PN Invitation letters

Assessment plan

Country CONOPs

5

UNCLASSIFIED

UNCLASSIFIED

ADF Planning Status

General Planning• CJOPS Decision Brief for PP12 signed.

Command• Nomination of O-5 for position of COMASC submitted.• Call for nominations for ASNCE staff sent via signal.

Engineering• Two (2) ADF engineers participated in Indonesia PDSS. Still awaiting

Post Activity Report.• Authorization to lead as FIE for Indonesia mission still to come from

IPDIV.

Medical • Awaiting nominations for ADF Health PP12 positions from Services.

No Change

6

UNCLASSIFIED

UNCLASSIFIED

ADF Participation

Australia

• Command Element

• Engineering Section

• Medical Personnel contribution of 15 – 20 pers in each contingent

Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines

Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the

conclusion of mission in Cambodia

Health manning TBC in late November

HQJOC Health PP12 POC:

CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans) [email protected]

No Change

7

UNCLASSIFIED

UNCLASSIFIED

PP12 RFI Tracker

Number Status Date Req Responsible

Question Other

ADF-001 Closed 11 Nov 11 PACFLT Request a copy of the Indonesian PDSS itinerary

ADF-002 Open 11 Nov 11 PACFLT Status of Partner Nation invitation letter

No Change

8

UNCLASSIFIED

UNCLASSIFIED

JSDF Planning Status

• CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. - Studying other activities Vehicles - JMSDF Ship   LST“OOSUMI” - JASDF Aircraft ( C-130   or KC-767× 1)             

Medical team       - Approximately 20~30

9

UNCLASSIFIED

UNCLASSIFIED

JSDF Planning Status

• PDSS -Re-survey Philippines with U.S. member in MAR 5 ~ MAR 9

• Humanitarian community in Japan - Not yet access(will recruit on Middle of FEB)

• POC - PLANNING PRI: LCDR Haga : [email protected] DSN:224-7714 or 7723 SEC: LCDR Yamaguchi : [email protected] - MED PRI: CDR Hayashizaki:[email protected] SEC: MAJ Yamasaki:[email protected] - PA CDR Maeyama: [email protected]

No Change

10

UNCLASSIFIED

UNCLASSIFIED

JSDF Planning Status

Number Status date WG Requests/Questions Comments

JPN -001 19 OCT PDSSDraft plan of PDSS in Philippine and Vietnam

JPN-002 30 NOV PDSSReq. re-survey with US survey member in FEB or MAR.

JPN-003 8 FEB OPSMERCY's arrival/departure port time at Calbayog and Vinh

JPN-0048 FEB

CMO1day seminar' s date,location,participant

No Change

11

UNCLASSIFIED

UNCLASSIFIED

NZDF Planning Status

No Change

NZDF will deploy a multi-disciplinary team of 8 personnel for the duration of the deployment to Vietnam 10 – 24 Jul 12. Exact composition is to be finalised in due course but likely to be as follows with specialties to be advised:

2 x Health Planners1 x Medical Officer 1 x Nursing Officer1 x Dentist or Dental Hygienist2 x Medics1 x Environmental Health Officer

Outline SOM: - Embark USNS MERCY in Subic Bay, Philippines on or prior to 6 July 12.- Conduct tasks as personnel embedded into appropriate health capability bricks.- Disembark at conclusion of Vietnam mission.- RTNZ via either Hanoi or Ho Chi Minh City.

12

UNCLASSIFIED

UNCLASSIFIED

CPF FOPS Update

- CHIME will not be funded or replaced.-Pacific Partnership does not have a requirement for a CHIME-like system. - Funding does not exist to contract for a CHIME-like system.

13

UNCLASSIFIED

UNCLASSIFIED

Medical Update• Medical WG Telcon held Tuesday, 24 January 2012, 1200 hrs

• LT JG Ward to attend MPC and stay to assist with Medical CONOPS development– Funding provided by CPF and MERCY

• Medical assessment to Philippines is GTG

• Per ODC during 1/24 telcon, medical assessment to Cambodia rescheduled– 26 March – 3 April

No Change

14

UNCLASSIFIED

UNCLASSIFIED

Engineering Update

Site Survey Projects Recommended SMEE Request

Philippines 3 schools & 1 medical clinic P&E; Seawall Cambodia 3 health centers Water; Bldg DesignIndonesia 3 health centers & 1 school Seismic; Disaster Vietnam 2 health centers Disaster; Safety

Philippine Project Package preparation (ACB1 lead)Cambodia Project Package preparation (NMCB40 lead)Indonesia Project Package preparation (ADF lead/NMCB40 Alt)Vietnam Project Package preparation (NMCB40 lead)

Engineering SMEE Plans.

Completed On-track Off-Track/Recoverable Off-Track not recoverable

15

UNCLASSIFIED

UNCLASSIFIED

Logistics Update

• Logistics WG held 14 Feb 12

• Logistics Resource Matrix In progress

• Funding– APRI

• MTF MERCY received $900K; DLA in receipt of $800K; total required $1.9M

• Pharmaceuticals and Consumables

• Donation Material – First pallets arriving from LDS

• Next Logistics WG meeting scheduled for 21 Feb 12

16

UNCLASSIFIED

UNCLASSIFIED

PP12 Supply and Logistics StatusFUNDING (15FEB12)

16 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

APRI CPF/

SUPPO

31JAN12 - APRI ($1.7M of $1.9M required received)

ORF C7F/

CDS-7/

SUPPO

07FEB12 - ORF plan developed- Draft message request in progress

OCO CPF/

SUPPO

15APR12 - Requirements data forwarded to CPF - Review in progress

17

UNCLASSIFIED

UNCLASSIFIED

Item / Task Status Action Date Req Notes

Indonesia Load List

SUPPO 03FEB12 - Load list developed pending MPC update(s).- Final pharmaceutical list forwarded to FLC Yokusuka contracting for contract award determination - DLA commencing initial purchase of standard consumable items

Philippines Load List

SUPPO 03FEB12 - Load list developed pending MPC update(s)

- Standard pharmaceutical items requisitioned- DLA commencing initial purchase of standard consumable items

Vietnam Load List

SUPPO 03FEB12 - Load list developed pending MPC update(s).-Final pharmaceutical list forwarded to FLC Yokusuka contracting for contract award determination - DLA commencing initial purchase of standard consumable items

Cambodia Load List

SUPPO 03FEB12 - Load list developed pending MPC update(s)- Standard pharmaceutical items requisitioned

- DLA commencing initial purchase of standard consumable items

17 17 Completed On-track Off-Track/Recoverable Off-Track not recoverable

PP12 Supply and Logistics StatusPHARMACEUTICALS and CONSUMABLES (15FEB12)

NO CHANGE

18

UNCLASSIFIED

UNCLASSIFIED

Item / Task Status Action Date Req Notes

Load Plan MSC/

SUPPO

31JAN12 - Load plan developed and approved by MSC MERCY- 240 pallet maximum established

Project Handclasp

SUPPO 15MAR12 - Preparations ongoing with POC

LDS SUPPO 15FEB12 - 24 Pallets scheduled for 23 FEB delivery- 24 Pallets scheduled for 01 MAR delivery

Worldwide VETs

SUPPO 15MAR12 - Preparations ongoing with POC

18 18 Completed On-track Off-Track/Recoverable Off-Track not recoverable

PP12 Supply and Logistics StatusDONATION MATERIAL (15FEB12)

19

UNCLASSIFIED

UNCLASSIFIED 19 19 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

IT & Radio Operator Manning

CPF N3/ CDS /

01MAR12 -Each MEDCAP : 1-IT (HEIS) TBD- JCSE IEP (3 ea +OIC= 7 pers ) approved 05DEC- 4+Remote MEDCAP manning assignment by name-IMEF providing 4 PERS/ 6 117 Radios

Annex K /

COMM Plan

CPF/ C3F/CTF-76/CDS

15MAR12

- IAW NTTP 3-57 Navy HCA OPS and NWP 3-29-Country CIS inventory and CONOPS Plan developed at MPC.-OPTASK COMMS will include daily plan based on CONOPS and Japanese ship COMMs capability

BGAN SATCOM

CPF N6/

CDS POST-MPC

- Not required for PDSS. (17OCT11 CDS-7 N6 email).- OPTEST CPF BGANs (FEB12).- Develop CONOPS for BGAN use.-ADVON BGAN training by MERCY TBD

Host Nation Spectrum Mgt

C7F/CTF-76 /CDS

01MAR12 - Awaiting C7F response to CDS-7 01FEB request for frequency assignments and restrictions for each host nation.

PP12 CIS Information Systems Status(15FEB12)

20

UNCLASSIFIED

UNCLASSIFIED 20 20 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

PAO Network CPF PAO/N6

/ CDS/

MERCY

30MAR12 -Defense Video & Imagery Distribution System (DVIDS) : PAO confirmed system is available. Ashore use only.- Verified Fast File Transfer (FFT) SW (version 2.43) Installed in MERCY. FFT ATO pkg in development at DMA. PAO assist in progress

PN-NGO Business Center

(SSC LANT CHARLESTON)

CPF N6 / CDS

/MERCY

APR12 -SPAWAR PN-NGO Business Center (Wireless and terminals) is the afloat solution. -MERCY to coordinate refresh/OPTEST/training in San Diego by SPAWAR. SOW in development (09JAN12).- CDS procure printer consumables for entire mission.-IA/business rules provided CDS-7 N6 03NOV11.

Partner Nation Interoperability

CPF N6 / CDS

POST-MPC

-Verify Partner Nation (PN) CIS POCs.-Verify APAN accounts for all PN CIS WG team members.-PN CIS capability review.-Develop CIS Interoperability Matrix in Annex K.

Health Engagement Information System (HEIS)

CIS WG/

CDS N6

TBD -HERS funded by MARFORPAC Experimental Center (MEC) is not available-MEDCAP information collection requirements being verified by CPF N01H-CIS and Medical WG reviewing alternatives.

PP12 CIS Information Systems Status(15FEB12)

No Change

21

UNCLASSIFIED

UNCLASSIFIED 21 21 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

Remote MED-DENCAP /CC Comms Arch

CDS / CPF

PRE-MPC

-Draft CIS Element architecture and inventory under review at CDS-7 (20JAN12)-Completed at MPC.

Host Nation

MIL C4

PDSS OIC

PDSS AAR

-PDSS OICs for assessment action.

-Training provided to Blue Team 21OCT11.

Host Nation

CIVIL Comms

PDSS OIC

PDSS AAR

-PDSS OICs for assessment action.

-Training provided to Blue Team 21OCT11.

Remote Site US Mission CIS

Assessment

PDSS OIC/

AOIC

PDSS

AAR

-JCSE Planner not included in PDSS. PDSS AOIC to conduct assessments with provided checklists and guidance.-Command Center (CC) Comms assessment.-Training provided to Blue Team 21OCT11.

PDSS CIS

Comms

CPF/ CDS PDSS OICs

PRE-PDSS

-Iridium Phones: CPF N6 issued phone to Blue OIC.-In country cell phones: MERCY to provide from PP10 mission phones.-Automated Data Collection (8 cell phones app) issued to OIC.

PP12 CIS Information Systems Status(15FEB12)

No Change

22

UNCLASSIFIED

UNCLASSIFIED 22 22 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

Knowledge Management /Data Protection

CDS/

MERCY

TBD -MEDCAP/CDS/Mission Data storage and protection

Command Center Ashore CIS

CDS PDSS

AAR

-Identify configuration and location in each country.-Completed at MPC

IT SMEE

Requests

CDS PDSS AAR

-PDSS determine scope (SYSADMIN, repair, training, etc.).-No IT SMEE were requested by the host nations

SATCOM Requests

C3F/

C7F/

CDS

FEB12 -Standard USN process.

Mission COMMs Readiness

CDS /

MERCY

APR12 -Pre-deployment COMM Checks (DVIDS, FTP, FFT, NMCI FAS, MERCY COMMs Suite)

PP12 CIS Information Systems Status (15FEB12)

No Change

23

UNCLASSIFIED

UNCLASSIFIED 23 23 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

FSET on MERCY

CPF /

MSC

13APR12 - Field Service Engineering Team (FSET) rqmt for San Diego to Guam cost estimate from SPAWAR received 11JAN12. SD-Guam Adjusted dates of FSET; new ROM in development.

-Funding transfer to SPAWAR TBD

End of Mission CIS Exit Plan

CPF/

CDS

TBD - Hardware: Transfer custody of loaned CIS items back to CPF-Data Exit Plan: TBD

VHF Handheld Radios

CPF/

CDS

FEB12 -CDS determine required quantities

ADVON CIS CDS MAR12 -Requirements determined at MPC. Under review at CPF N6/N3

Embarked Documentary Team

CDS Ongoing -CDS determine requirements and set expectations

-Afloat connectivity limited to NGO Business Center

Rehearsal CIS CDS 01MAR12 -CDS determine requirements.

PP12 CIS Information Systems Status(15FEB12)

24

UNCLASSIFIED

UNCLASSIFIED

Force Protection Update

• Landside Security Force Tasking- with manpower

• PIVA/TA update

• Continued refinement of FP plans

• Next FPWG- Tuesday, 21 Feb, 1300 HST

• Pre-Deployment travel Requirements– Updated ISOPREPs– APACS– iATP– AOR location specific brief– Level I ATFP– SERE 100 B

25

UNCLASSIFIED

UNCLASSIFIED

CAWG Update (15 FEB)

Item / Task Status Action Date Req Notes

CJ-CMCC Concept Paper Dev CPF N5 15 FEB

-Completed-Chops received and incorporated from DESRON, PP 09, 10, 11 reps, COE-DMHA (IHC) -CMCC concept document inputs received during MPC TTX.

CMCC Battle Rhythm Sych DESRON 19 JAN - Inputs submitted to DESRON.

Non-Medical SMEE CONOPS Draft Plan CAWG 23 JAN

-Complete- Plan details will continue to be added, as possible, between now and ADVON deployment. However, CONOP finalization will not occur until ADVON.

Operational Assessment Plan CAWG MAR 12

- Assessment WG has produced draft task list which will be socialized and refined during WGs.-Geared toward MOPs

Strategic Assessment Plan CAWG APR 12

- Geared towards Theater Strategic Objectives

NGO and Partner Nation Engagement Process

CAWG /

CPF N5

MPC

- 90% plan post MPC but add-ins will be ongoing.

26

UNCLASSIFIED

UNCLASSIFIED

Projected Host and Partner Nation Participation by PortProjected Host and Partner Nation Participation by Port (15 FEB 2012) (15 FEB 2012)

Host / Partner Nation

Material / Platform Support

Personnel Participation by Port

SD HI GU ID RP RP VN KM GU HI SD POC

Indonesia FP, Engineers, Medical                    LCDR Chris [email protected]

PhilippinesFP, Engineers, Medical

                 LCDR Scott [email protected]

VietnamFP, Engineers, Medical

                   LTC Wayne [email protected]

CambodiaFP, Engineers, Medical

                   LTC Kristin Means [email protected]

AustraliaMedical 15-20 PAXEngineer Section

                   

CMDR Kenneth Walters:[email protected] Owen Gardner, [email protected].

Canada Medical/Dental 9 May

15 Pax

15 Pax

15 Pax

4 July 15 Pax 15 Pax 15 Pax 4 SepCAPT Lee Gagne [email protected]

JapanJMSDF Ship Aircraft (C-130 or KC-767)Medical Team: 20-30 pax

                   LCDR Haga : [email protected] Haga : [email protected]

New Zealand 8-12 PAX Medical TeamMAJ Andrew [email protected]

Singapore Medical teamMajor Chow Weien: [email protected]

ThailandMedical, Engineers and CA Approx 15 Pax

LCDR Jason Starmer [email protected]

ROKCAPT Steve [email protected]

Chile 1 PAXMedical 5 July

24 July

LCDR Julian [email protected]

Costa Rica 1 PAX Medical 25 APR

LCDR David L [email protected]

UAE 1 PAX Medical CDR James C. [email protected]

27

UNCLASSIFIED

UNCLASSIFIED

Public Affairs Update

- Admin• BGAN- CPF COMCAM will provide BGAN and limited airtime for

emergency use/last resort transmission capability

- Media Coordination• MERCY tour – 16 FEB at 1100 for Gus Blackmon and Whittney

Beatty (Warner Bros/Telepictures production crew)

28

UNCLASSIFIED

UNCLASSIFIED

Item/Task Status Action Suspense Date

Notes

PAG CDS PACPF PA

TBD Draft to CDRE 15 DECRouting will happen D-30 to 45 days

DC media trip/mission announcement

NS CDS PA APR 2012

PP Fact Sheet CDS PA, CPF PA

30 DEC Mission info to NAVINFO WEST for vetting

Smartphone SOP

NS CIWG, CPF Social Media

15 MAR

Online presence brief

CDS PA, CPF PA

9 DEC Social media, websites, etc

28 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Public Affairs Update

29

UNCLASSIFIED

UNCLASSIFIED

Item/Task Status Action Suspense Date

Notes

Equipment requirements

CDS PA, NPASE

TBD Dialogue initiated w/ MERCY on 04 JANBGAN support- emergency use only, provided by CPF COMCAM

PO&AM inputs CDS PA, CPF PA

14 DEC Due to FOPS.PA-specific updates in progress

Media Training Plan

CDS PA

TBD Training to CDS leadership and mission participants

COMREL purchase list

CPF PA

24 FEB Will route final list after SLV feedback from PAO

29 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Public Affairs Update

30

UNCLASSIFIED

UNCLASSIFIED

PP12 Communication Integration

• Identified initial list of communication “products” at MPC– Posters, gift, backpacks, SMEE aids, etc.

• Coordinating communication assessment support for PP12 (MAY – SEP 12)

– Developing media analysis approach– Finalizing linguist candidates to support in-country

media analysis, and CA/PA engagement• Next CIWG meeting scheduled for: 16 FEB 12

• AMEMB Cambodia, Vietnam Telecons– Additional telecon to be conducted during LCDR Lohmeyer’s

visit (SLV)

31

UNCLASSIFIED

UNCLASSIFIED 31 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

Stakeholder Analysis

CIWG 15 NOV - Initial product completed. Briefing with Commodore Morgan scheduled for early Dec.

Characterize Information Environment

CPF N2/N39

15 NOV – 30 JAN

-Political Military Economic Social Infrastructure and Information (PMESII) product status is as follows: Cambodia 100%, Indonesia 100%, Vietnam 100%, Philippines 100%.

Communication Strategy/ Implementation Plan

CPF N2/N39

31 DEC - This product will detail integrated approach for internal, external messaging. This product will be a draft until finalized as an Annex to the CPF PP12 Campaign Plan.

Identify/Coordinate key messaging events

CIWG 15 JAN - Identified; coordinating CIWG support:-- ETG Leadership Training-- MPC Assessment planning-- SLV support

Develop messaging products

CIWG/ CPF N2/N39, PA

15 APR - Identified initial information products to support mission execution. Researching feasibility, and working with mission SMEE coordinators to ID additional requirements; coordinating with PACOM, SOCPAC, USARPAC, in-country teams.

PP12 Communication Integration

32

UNCLASSIFIED

UNCLASSIFIED 32 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

Develop communication MOE Indicators

CIWG/ N2/N39

15 JAN - Draft indicators developed as part of overall PP12 assessment effort.

Define Communication assessment methodology

CPF N2/N39

30 JAN - Completed communication assessment framework and methodology for incorporation into overall PP12 assessment effort.

Coordinate and monitor communication during execution

CPF N2/N39

During PP12

- Identified initial monitoring requirements, resources and tools to support communication assessment, such as media analysis.

Conduct communication assessment

CIWG During PP12

- Not started.

Develop AAR CPF N2/N39, PA

30 SEP - Not started.

PP12 Communication Integration

33

UNCLASSIFIED

UNCLASSIFIED 33

Host Nation

Opening Ceremonies

DatesVisiting FO/GO

(Service)

Closing Ceremonies

DatesVisiting FO/GO

(Service)

Indonesia: North Sulawesi 31 May 2012 15 June 2012

Philippines: Samar 18 June 2012 01 July 2012

Vietnam: Vinh 10 July 2012RDML Penniman

(USN)(T) 24 July 2012

Cambodia: Sihanoukville 28 July 2012 11 August 2012

RDML Gregory (USN)

   

Flag Engagement Plan

34

UNCLASSIFIED

UNCLASSIFIED 34

Planning Timeline

UPDATED: 08FEB12 INDICATES UPDATE

35

UNCLASSIFIED

UNCLASSIFIED

Mission Commander Priorities

• Country CONOPS Development– 17FEB: CONOPS addendum updates due to CDS7 from planning leads– TBD: CONOPS Annex updates due to CDS7– 24FEB: Updated EAPs for CONOPS

• ADVON Composition / Notification– 17FEB: Finalize composition

• Voyage Planning– Initial planning complete, SOM in CONOPS is executable, on track to

submit transit plan by D-60– SOM for initial 2 PVSTs may shift 1 day to left to prevent overtime in

Pearl/Guam (currently sked for Saturday departures from both); no effect on mission ports

• MRX Planning– 15FEB: Stakeholders provide input to CDS7 N3 on objectives /

participation

36

UNCLASSIFIED

UNCLASSIFIED

Mission Commander Priorities (continued)

• Pre-deployment Briefings– 02APR 1630 PST (030030ZAPR12) – CTF76 (VTC)– TBD – C3F– TBD – C7F– TBD – CPF

• Maritime Operations Center (MOC) / MOC Beach Det– Watchfloor on MERCY and ashore– Products in development:

• SORM• PPRs• Checklists• Watchbill

• PP12 Mission Planning Rhythm– In development

37

UNCLASSIFIED

UNCLASSIFIED

Closing Questions/Comments

• CPF Staff• State Dept – Mr. Weinz• AUS HQ JOC• HQ JFNZ• JSDF• FLC-Yokosuka• C7F• C3F• CTF 76

• 351st Civil Affairs Command• DLA Troop Support - Pacific• 30th NCR• ETG• HSC-21 DET 2• MCAST• USNS MERCY• CDS-7