os-nma user terminal

54
OS-NMA User Terminal Flavio SBARDELLATI, Market Development Department Kate BOUSFIELD-PARIS, Legal and Procurement Department Giovanni LUCCHI, Project Control Office Fundamental elements Webinar, 29 th March 2017 This presentation can be interpreted only together with the oral comments accompanying it

Upload: the-european-gnss-agency-gsa

Post on 12-Apr-2017

108 views

Category:

Business


0 download

TRANSCRIPT

Page 1: OS-NMA User Terminal

OS-NMA User TerminalFlavio SBARDELLATI, Market Development DepartmentKate BOUSFIELD-PARIS, Legal and Procurement DepartmentGiovanni LUCCHI, Project Control OfficeFundamental elements Webinar, 29th March 2017This presentation can be interpreted only together with the oral comments accompanying it

Page 2: OS-NMA User Terminal

2

• Participants’ microphones are muted. To avoid any echo, please switch off your microphone.

• Make sure your speakers or headphones are switched on, and turn up the volume.

• To interact you can use the common chat room. Questions to individual participants will not be answered.

• Your questions will appear anonymously to the other participants

Before we start – way of working (1/2)

Page 3: OS-NMA User Terminal

3

• Questions are collected and addressed at the end of the session, if time allows it.

• All questions and answers will be published on the GSA website in order to guarantee the equal treatment of tenderers/applicants.

• Slides and clarifications will be available in due course online after this webinar.

• After the information session, you will receive a short satisfaction questionnaire, please fill it in.

Before we start – way of working (2/2)

Page 4: OS-NMA User Terminal

4

TECHNICAL SCOPE PARTICIPATION AND EVALUATION CONTRACT GUIDELINES TO FILL IN THE FINANCIAL TABLES HOW TO PREPARE YOUR TENDER Q&A TIME

Agenda

Page 5: OS-NMA User Terminal

5

TECHNICAL SCOPE

Page 6: OS-NMA User Terminal

6

• Open Service Navigation Message Authentication Signal in Space transmission is foreseen in 2018 while full service provision is planned in 2020.

• OS-NMA Specification for Signal-in-Space testing v.1.0 was disclosed in February 2017 allowing for OS-NMA implementation at chipset/receiver level.

• A new generation of user terminals enabled to exploit this feature needs to be industrialised.

Background

Page 7: OS-NMA User Terminal

7

• Development of a “close to market” OS-NMA User Terminal:• Target application: The UT shall meet Smart Tachograph application’s

requirements

• Level of maturity to carry out a demonstration in a representative environment (TRL 7+)

• Supply of qty. 3 units

• Development of a suitable end-to-end Validation Platform

Tender objectives (1/2)

Page 8: OS-NMA User Terminal

8

• Extensive testing of the UT: anti-spoofing performance assessment using:• Real GNSS signals, and

• End-to-end Validation platform

Tender objectives (2/2)

Page 9: OS-NMA User Terminal

9

• Implementing OS-NMA in accordance with [AD.1] (OS-NMA specification for SiS testing v1.0)• At data level, implementing cryptographic and rough

synchronisation functions required for OS-NMA (e.g. key management, algorithm implementation, receiver logic)

• At signal level, including anti-replay protection by making an optimal use of the unpredictable bit broadcast in the NMA data

Highest level of robustness (1/2)

Page 10: OS-NMA User Terminal

10

• Additional anti-spoofing capability:• A list of mandatory measures defined in the tender spec

(sect. 2.2.7.2)• Protection against the full list of spoofing threats

identified by the tenderer• A list of optional measures proposed by the contractor to

achieve the best possible PVT solution in terms of robustness and reliability

Highest level of robustness (2/2)

Page 11: OS-NMA User Terminal

11

Stepwise approach

Page 12: OS-NMA User Terminal

First UT (v.1 featuring OS-NMA) developed

Validation platform developed

UT v.1 extensively tested ‒Real SiS‒Validation platform

Two-stage project

12

Final UT (v.2 with full anti-spoofing capability) developed

Validation platform upgraded

UT v.2 extensively tested ‒Real SiS‒Validation platform

Qty. 1 proto unit delivered Qty. 2 proto units delivered

STAGE 1 STAGE 2

Page 13: OS-NMA User Terminal

13

End-to-end Validation platform

Page 14: OS-NMA User Terminal

14

• The contractor, upon the GSA’s approval and tools’ availability, shall be granted access on request to the following items:• GNSS Simulator • Spoofing Generator • Experimentation NMA Module

• Description of the tools available in the next slides.

Customer Furnished Items (CFI)

Page 15: OS-NMA User Terminal

• Generating E1BC in accordance with Galileo OS-NMA Scheme

Spirent GSS9000 with 6x Signal Banks: GAL E1/E5/E6 + GPS L1/L2/L5 Up to 16 channels in all signal banks- Generation of GAL E1BC with pre-computed INAV navigation data symbols in accordance with current

GAL OS-NMA scheme- OS-NMA Module: SW tool calculating INAV data symbols for a given set of satellite ephemeris and

time window will be made available.

GNSS Simulation Capabilities

Page 16: OS-NMA User Terminal

• Two possible solutions:

1. Using record and playback platform and a GNSS simulator: - Spoofing attacks on the GPS/Galileo OS in L1 implemented pre-recording sequentially two

scenarios (baseline and spoofing) and combining them off-line into one IF dataset to be played back.

- Sharing 10 MHz reference and a TRIG signal allows a very precise time alignment (<1 ns) of the two scenarios.

2. Using two GNSS simulators currently available at the JRC: a Spirent GSS9000 and a Spectracom GSG-64 (with GPS L1/L2/L5, GAL E1/E5).

- Time alignment of the two GNSS signals is much coarser in this case

Spoofing & Meaconing generation

Page 17: OS-NMA User Terminal

• 2x NI USRP 2943R: Record and playback of IF data with 4,8, or 16 bit depth• Up to two bands simultaneously recorded/played back at a sustained sampling

rate up to 100 Msmp/sec

• IF data streamed to/from an SATA SSD disk drive on the host PC running the control software

Record and playback capability

Page 18: OS-NMA User Terminal

18

Signal-in-Space testing

OS-NMA public key distribution:• E-mail and publication

on GSC web portal for registered users

• Public key renewal process through SIS during testing phase is TBC

Page 19: OS-NMA User Terminal

19

• Coordination task:‒ coordination with EC/GSA projects dealing with the OS-NMA, authentication

and terminal robustness concepts with the aim to collect and inject into the project any relevant input.

• Standardisation task:‒ Definition of a standard architecture for the OS-NMA UT‒ Recommendation for additional anti-spoofing techniques complementing OS-

NMA against a certain set of spoofing threats‒ Definition of a standard approach to assess the protection level of the UT‒ Identification of interfaces and APIs to enable a wide market uptake of OS-NMA

Transversal activities (1/2)

Page 20: OS-NMA User Terminal

20

• Dissemination task:‒ Of the achievements of the project among relevant stakeholders with the

aim of fostering the innovation created in the frame of the action and creating market awareness of the project’s results.

• Engineering support to GSA/EC‒ Fixed unit level of effort to provide support to the GSA and EC concerning

the OS-NMA implementation aspects.

Transversal activities (2/2)

Page 21: OS-NMA User Terminal

21

Stage 1 - Milestones Schedule (indicative)

P1KOM Stage 1 Kick-Off meeting T0

SRR System Requirements Review T0+2m

DR Design Review T0+4m

TRR1 Test Readiness Review 1 T0+6m

TTVR Testing Tools Validation Review T0+6m

FR1 Final Review 1 T0+9m

Milestones plan

Stage 2 - Milestones Schedule (indicative)

P2KOM Stage 2 Kick-Off meeting T1

dDR delta Design Review T1+2m

TRR2 Test Readiness Review 2 T1+5m

FR2 Final Review 2 T1+11m

Page 22: OS-NMA User Terminal

22

Maximum price: 2,500,000.00€ Funding rate: 100% Total price of Stage 1 shall not exceed 45% of the Total

Contract Value

Procurement budget

Page 23: OS-NMA User Terminal

23

TIMETABLE DATE Note

Launch of procurement process 15 February

Deadline for submission of clarifications 5 May 2017Last date on which clarifications are published by the GSA 12 May 2017

Deadline for submission of tenders 19 May 2017Opening of tenders 26 May 2017

Evaluation of tenders May – August 2017 Estimated

Award decision September 2017 Estimated

Contract signature October 2017 Estimated

Project timeline

Page 24: OS-NMA User Terminal

24

PARTICIPATION AND EVALUATION

Page 25: OS-NMA User Terminal

25

• All EU natural and legal persons and those from:‒Iceland‒Norway‒Liechtenstein‒Former Yugoslav Republic of Macedonia‒Albania‒Montenegro‒Serbia and‒Bosnia and Herzegovina

Participation

Page 26: OS-NMA User Terminal

26

• Assessment of the tender is done in sequential and eliminatory stages:

Evaluation

Page 27: OS-NMA User Terminal

27

• ALL entities (prime, consortium members, and subcontractors) must fulfil the exclusion criteria

complete Annex I.D.

Evaluation: exclusion criteria

Page 28: OS-NMA User Terminal

28

• ALL entities (prime, consortium members, and subcontractors) must fulfil the selection criteria unless indicated otherwise.‒Legal capacity all entities‒Economic and financial capacity see p.46 (note: “core”

subcontractor)‒Technical and professional capacity see p.47 (note: “core”

subcontractor)

NOTE: Submit the evidence required for each capacity criterion (nb. the maximum age of supporting documents)

Evaluation: selection criteria

Page 29: OS-NMA User Terminal

29

• Tenderers must fulfil the minimum requirements in section 3.3 of Annex I (prime, consortium members).

Evaluation: minimum requirements

Page 30: OS-NMA User Terminal

30

• Qualitative and financial

Evaluation: award criteria

Page 31: OS-NMA User Terminal

31

CONTRACT

Page 32: OS-NMA User Terminal

32

• Conditional Stage Payment Contract‒Contract is divided into stages ‒Contracting authority defines the conditions for starting the

next stage or terminating the contract at the end of the stage‒Payments are always limited per stage

Overview of the CSPC – intro

Page 33: OS-NMA User Terminal

33

1st Stage – development and supply of OS-NMA UT prototype – details in section 1.3.1 of Annex I

2nd Stage – prototype performance assessment and supply– details in section1.3.2 of Annex I

Overview of the CSPC – stages

Page 34: OS-NMA User Terminal

34

• Conditions precedent for 2nd stage:‒GSA’s authorisation, given provided that:

(1) 1st contract stage successfully completed

AND

(2) the Galileo ground system and the satellite constellation are able to broadcast OS-NMA Signal-in-Space (SiS) through E1-B I/NAV, such that it is objectively suitable to support the tasks as foreseen and scheduled for 2nd contract stage

Overview of the CSPC – conditions precedent for 2nd stage

Page 35: OS-NMA User Terminal

35

• Read the draft contract carefully:

this is only an overview of important points on ownership of results and use of background IPR

IPR licensing conditions (1/5)

Page 36: OS-NMA User Terminal

36

• Results (tangible and intangible) created under the contract shall be vested in the EU, represented by the EC

• EU acquires a number of exclusive rights and modes of exploitation

IPR licensing conditions (2/5)

Page 37: OS-NMA User Terminal

37

• Background IPR shall be declared as soon as the contractor is aware of its need

• Contractor provides/ensures all necessary licenses over background IPR to enable the the EU, GSA and institutional assignees/licensees to use the Results for institutional purposes

IPR licensing conditions (3/5)

Page 38: OS-NMA User Terminal

38

• Subject to compliance with contractual obligations, the contractor and the contractor parties (incl. affiliates) obtain a non-transferable, non-sub licensable, perpetual, unrestricted, free of charge, non-exclusive right to use the results, including for commercialisation purposes of products having embedded the results

IPR licensing conditions (4/5)

Page 39: OS-NMA User Terminal

39

• Contractor shall provide license over background IPR licence upon request where this is needed for commercial exploitation of the results under fair, equal and reasonable market terms and conditions

IPR licensing conditions (5/5)

Page 40: OS-NMA User Terminal

40

GUIDELINES TO FILL THE FINANCIAL TABLES

Page 41: OS-NMA User Terminal

41

• Annex I.K – Effort distribution • Annex I.L – Financial Offer

‒Including Annex I.La substantiating the Financial Offer by providing detailed cost element data

How to build the Financial Table

Page 42: OS-NMA User Terminal

42

• WBS-E based (bottom-up approach)• Define the labour cost, allocate it to tasks• Differentiated sheets to be filled in by the prime and

subcos/members (bottom-up approach)• Integrated approach – integration and consistency check in

charge to the prime (tenderer’s leader)

Approach

Page 43: OS-NMA User Terminal

43

• WBS-E based

• The sum of the prices of the WBSE’s has to be the total tender price.

• This price must match the price reported in the Annex I.L – Financial Offer sheet.

• It shall be assessed against the award criteria (Q1)

Effort distribution – Annex I.K

Tenderer (full company name):

WP titleWBE id

(relating to WP)

WBE Price (*) (in % of the Total Overall Tender

price)

Share (%) of competitive subcontracting (**)

(*) Totel Overall Price = PCS-A6 price + Task 7.1 PCS-A1 price + Task 7.2 PCS-A1 price (**) Percentage of the WBE price which is subcontracted through a competitive tendering

Signature by tenderer's authorised representative:

_____________________________

Procurement/Contract Number: GSA/OP/23/16 - Development, Supply and Testing of a Galileo Open Service Authentication User Terminal (OS-NMA) for the GSA

Annex I.K - Effort Distribution

Page 44: OS-NMA User Terminal

44

Annex I.L: Financial Offer sheet, to be filled in by the Prime only

• PCS-A1 sheet

• Task 7.1 PCS-A1 sheet

• Task 7.2 PCS-A1 sheet

• Leader PCS-A2 sheet, to be filled in by the Prime only

• Member_ PCS-A2 sheet

• PCS-A2 Exibit A sheet

• PCS-A2 Exibit B sheet

• PCS-A2 Exibit C sheet

• PCS-A4 sheet

• PCS-A6 sheet

• PCS-A8 sheet

Financial Tables – Annex I.L

Annex I.La Price Cost sheets

Page 45: OS-NMA User Terminal

45

Financial Tables – Annex I.La - Logic

Page 46: OS-NMA User Terminal

46

• Step 1 – PCS-A1• Step 2 – in parallel (PCS-A8; PCS-A2 Exhibits A,B and C)• Step 3 – PCS-A2• Step 4 – Task 7.x PCS-A1• Grouping by the prime to get Leader PCS-A2 Exhibit C• PCS-A2 Exhibit C + Task 7.x PCS-A1 Financial Offer

Financial Offer generation

Page 47: OS-NMA User Terminal

47

HOW TO PREPARE YOUR TENDER

Page 48: OS-NMA User Terminal

48

• Documents must be submitted in accordance with double envelope system

Tender package composition

Outer Envelope

Inner Envelope

#1#2

#3

Page 49: OS-NMA User Terminal

49

In accordance with tender specifications, sect. 4.5:

A. The Administrative filesB. The Technical Offer C. The Financial Offer

Summary of the tenders

Page 50: OS-NMA User Terminal

50

• Signed cover letter• ID sheet• Power of Attorney• Submit subcontractor’s Letter of Intent• Financial identification form• Financial statements• DOH• Non-disclosure undertaking• Statement re: minimum requirements

Administrative files (1/2)

Page 51: OS-NMA User Terminal

51

Attention:• Legal identity form – Annex I.B (download the

applicable template and do not forget to submit supporting documents* indicated on the top of the downloaded template)

• Submit the required statements of authorisation*

Administrative files (2/2)

Page 52: OS-NMA User Terminal

52

• Executive Summary (max 2 pages)• Technical proposal addressing all matters laid down in the

tender specifications‒Pay attention to the elements listed in the TS, section 4.5.4

• Annex I.G – Technical and Professional Selection Criteria Cover Sheet

• Annex I.K – Effort distribution• Annex II.III – Declaration of Background IPR

Technical Offer

Page 53: OS-NMA User Terminal

53

• Annex I.L and I.La – Financial Table of Answers and Cost Statement Forms

NOTE:‒ Price elements of Annex I.L shall be fully aligned and supported by

the percentage figures presented in Annex I.K (included in the Technical Offer) with no discrepancies.

‒ The level of detail and the justification of costs submitted in the Cost Statement Forms (CSF) in Annex I.La shall be evaluated as part of the qualitative award criteria (Q1).

Financial Offer

Page 54: OS-NMA User Terminal

54

E-mail address: [email protected]

Tenders sent by express mail, commercial courier or post mail to

GSA Legal and Procurement Department Janovského 438/2, 170 00, Prague 7, Czech Republic Tender ref. GSA/OP/23/16Tenders sent by hand-delivered should be addressed to the same postal

address not later than 19 May 2017 at 17.00 (CET)

Submit requests for clarifications by: 5 May 2017

Submit tenders by: 19 May 2017

Contact coordinates for the tender