  • 8/10/2019 NTPC Badarpur Mechanical PPT

    1/15

    Industrial Summer Training at

    NTPC Badarpur

    AKSHAY ARORA

    MECHANICAL ENGINEERING4thyear

  • 8/10/2019 NTPC Badarpur Mechanical PPT

    2/15

    Overview of NTPC

    NTPC was set up in the central sector in the 1975.

    NTPC has installed capacity of 29,394 MW. It plans to be a

    75,000 MW company by 2017.

    NTPC Badarpur station has also bagged ISO 9001/ ISO 14001

    certification.

    Today NTPC contributes more than 3 / 5th of the total power

    generation in India

  • 8/10/2019 NTPC Badarpur Mechanical PPT

    3/15

    Click to edit the outline

    text format

    Second Outline

    Level

    Third Outline

    Level

    Fourth OutlineLevel

    Fifth

    Outline

    Level

    Overview of NTPC

  • 8/10/2019 NTPC Badarpur Mechanical PPT

    4/15

    NTPC Badarpur

  • 8/10/2019 NTPC Badarpur Mechanical PPT

    5/15

    Overview of BTPS

    BTPS MEETS MORE THAN 24% OF DELHIS

    ELECTRICITY CONSUMPTION

    INSTALLED CAPACITY = 720 MW

    DERATED CAPACITY = 705 MW (3x95 + 2x210MW) OWNED BY GOVT. OF INDIA, MINISTRY OF

    POWER.

    BEING MANAGED BY NTPC FOR THE LAST 26

    YEARS SINCE 1st APRIL 1978. NTPC adjudged as the 3rd best employer in India

  • 8/10/2019 NTPC Badarpur Mechanical PPT

    6/15

    NTPC Badarpur

    BTPS was conceived in 1965 to meet the growing

    electricity demand of Northern Region.

    The site construction activities started in 1968.

    The plant became operational with the

    commissioning of its first unit on 26th July 1973, 2nd

    unit in ;74 , 3rd unit in 75 , 4th unit in 78 & 5th unit

    in 81.

  • 8/10/2019 NTPC Badarpur Mechanical PPT

    7/15

    Basic Principle

    There are basically three main units of a thermal power plant:

    1. Steam Generator or Boiler

    2. Steam Turbine

    3. Electric Generator

  • 8/10/2019 NTPC Badarpur Mechanical PPT

    8/15

    Electricity from Coal

  • 8/10/2019 NTPC Badarpur Mechanical PPT

    9/15

    BOILER MA INTAINENCE DEPARTMENT

    Internally Fire Tube Boiler- 52m height, 60mm diameter.

    Powder Coal is air blown into furnace forming the fire required

    Water changes into steam at 370 Degree Celsius.

    The saturated steam introduced into superheat tubes as the exit from

    the furnace.

    The superheated steam goes to the 210 MW turbine generator to

    generate electricity.

  • 8/10/2019 NTPC Badarpur Mechanical PPT

    10/15

    AUXILLARIES OF THE BOILER

    Furnace

    Boiler Drum

    Water Walls

    Reheater

    Superheater

    Economizer

    Air pre-heater

    Pulvariser

  • 8/10/2019 NTPC Badarpur Mechanical PPT

    11/15

    PLANT AUXILLARY MAINATINENCE

    It con sists o f 6 sub - depar tments:

    Water circulation system- a) Natural Circulation system

    b) Controlled Circulation system

    Ash Handling plant- a) Hydraulic ash handling plant

    b) Fly ash collection

    Water Treatment Plant- a) Pre- treatment section

    b) Demineralization section

    Draught system

    Fans- a) ID Fans

    b) FD Fans

    Compressor House-a) Air Drying Unit

    b) Air Compressor

  • 8/10/2019 NTPC Badarpur Mechanical PPT

    12/15

    TURBINE MA INATA INENCE DEPARTMENT

    Two types of turbines are used in BTPS, i.e., 95 MW and 210 MW.

    Generally compounding of turbine is done by using an IP turbine.

    Specif icat ions o f turbine used:

    Tandem compound 3 cylinder reheated type

    Power= 210 MW

    Number of stages= 12 in HP, 11 in IP and 8 in LP.

    Type of governing: Nozzle governing

  • 8/10/2019 NTPC Badarpur Mechanical PPT

    13/15

    Vacuum Systems

    Condensers: 2 for 210 MW at exhaust of LP Turbine.

    Ejectors: Total 3 ejectors are used connected

    to the condenser.

    CW Pumps: It is used to pump water to

    the boiler. The pump system is equipped with

    LP heaters, deaeriators.

  • 8/10/2019 NTPC Badarpur Mechanical PPT

    14/15

    COAL HANDLING DEPARTMENT

    Coal handl ing system

    Path A: From hooper to boiler

    Path B: From hooper to stockyard

    Path C: From stockyard to boiler

    Main Coal handl ing Equ ipment

    Pulley

    Conveyor Belt

    Vibrating Screen

    Crusher

    Magnetic Separator

    Vibrating Feeder