Industrial Summer Training atNTPC Badarpur

Anuj Kumar

Electronics & Communication

Page 2: Ntpc badarpur training ppt

Introduction

10/31/11

Page 3: Ntpc badarpur training ppt

Overview of NTPC

NTPC was set up in the central sector in the 1975.

NTPC has installed capacity of 29,394 MW. It plans to be a 75,000 MW company by 2017.

NTPC Badarpur station has also bagged ISO 9001/ ISO 14001 certification.

Today NTPC contributes more than 3 / 5th of the total power generation in India

Page 4: Ntpc badarpur training ppt

Click to edit the outline text format

Second Outline Level Third Outline

LevelFourth

Outline Level Fifth

Outline Level

Sixth Outline Level

Seventh Outline Level

Eighth Outline Level

• Ninth Outline LevelClick to edit Master text styles– Second level

• Third level– Fourth level

» Fifth level

Overview of NTPC

Page 5: Ntpc badarpur training ppt

NTPC Badarpur

Page 6: Ntpc badarpur training ppt

Overview of BTPSBTPS MEETS MORE THAN 24% OF DELHI’S

ELECTRICITY CONSUMPTION

INSTALLED CAPACITY 720 MW

DERATED CAPACITY 705 MW (3x95 + 2x210MW)

OWNED BY GOVT. OF INDIA, MINISTRY OF POWER

BEING MANAGED BY NTPC FOR THE LAST 26 YEARS SINCE 1st APRIL 1978

NTPC adjudged as the 3rd best employer in India

Page 7: Ntpc badarpur training ppt

NTPC Badarpur

BTPS was conceived in 1965 to meet the growing electricity demand of Northern Region.

The site construction activities started in 1968.

The plant became operational with the commissioning of its first unit on 26th July 1973, 2nd unit in ;74 , 3rd unit in ’75 , 4th unit in ’78 & 5th unit in ’81.

Page 8: Ntpc badarpur training ppt

Basic Principle There are basically three main units of a thermal power plant: 1. Steam Generator or Boiler 2. Steam Turbine 3. Electric Generator

Page 9: Ntpc badarpur training ppt

Electricity from Coal

Page 10: Ntpc badarpur training ppt

C&I LABS

Control and Instrumentation Department has following labs: 1. Manometry Lab 2. Protection and Interlocks Lab 3. Automation Lab 4. Electronics Lab 5. Water Treatment Plant 6. Furnaces Safety Supervisory System Lab

Page 11: Ntpc badarpur training ppt

OPERATION AND MAINTAINANCE

This control & instrumentation is the brain of the plant because from the relays to transmitters followed by the electronic computation chipsets and recorders and lastly the controlling circuitry, all fall under this. A View of Control Room at BTPS

Page 12: Ntpc badarpur training ppt

CONTROL & MONITORING MECHANISMS

There are basically two types of Problems faced in a Power Plant 1. Metallurgical 2. Mechanical

Page 13: Ntpc badarpur training ppt

C&I Lab

In C&I Lab parameters to be monitored are: 1. Speed

2. Temperature

3. Current

4. Voltage

5. Pressure

6. Flow of Gases

7. Vibration

Page 14: Ntpc badarpur training ppt

IT Role & Responsibility

– Maintenance Management – Materials & Contracts Management – Financial Accounting – Coal Monitoring & Accounting.– Operations & Generation Monitoring– Hospital Management– H R & TMS, T/S Management– Office Automation & communication.– E-Samadhan complaints Monitoring

Page 15: Ntpc badarpur training ppt

• Why IT ? Materials : 30,000 + items

Transaction data. Master data Material and Service

Plant : 15,000 equipments Equipment master. Task list.

Employees : 1100 + Personal and payroll data. Finance : Accounting data. Operation : Plant parameters history data• Vendors: 5000 + vendors.

Page 16: Ntpc badarpur training ppt
Page 17: Ntpc badarpur training ppt
Page 18: Ntpc badarpur training ppt
Page 19: Ntpc badarpur training ppt

Satellite Communication Network

NTPC Hub StationAt CSES, Noida

RHQ:ERHQ, NRHQ,SRHQ,WRHQ

Tapovan Loharinagpala( ORDERED )

4/6 GHZ

4/6 GHZ( 512 kbps aggreagate )

2 GHZ/ 8 MBPS

THERMAL: Farakka,Unchahar,Kahalgaon, Korba, Ramagundam, Sipat, Simhadri,

Talcher (S), Talcher (T), Tanda, Barh

PMI,NOIDA

CC, SCOPENew Delhi

DADRI PROJECT

Engg.Office, NOIDA

GAS/HYDRO:Anta,Auriya,Faridabad, Gandhar, Kawas, Kayamkulam, Koldam,

2 mbps leased line

Rihand,

Vindhyachal

SingrauliOFC LINK

8 MBPS M/W Link

Page 20: Ntpc badarpur training ppt

Awards

MOP’s Meritorious Productivity Award:

For calendar years 1987, 1988, 1990.

For financial years 92-93, 94-95 and 97-98

Received Bronze medal in 1998-99 and

Received Silver shield and certificate of

Meritorious performance for 2000-01.

Received Gold shield and Certificate for

outstanding performance three consecutive years

01-02 & 02-03 , 03-04. the awards were

presented by Hon’ble President of India and

Hon’ble power Minister on 24 August 2004.

Page 21: Ntpc badarpur training ppt

Awards

Page 22: Ntpc badarpur training ppt

Awards

Page 23: Ntpc badarpur training ppt

Awards

o British safety award for 1988, 1994 and

1999.

o One employee bagged the Vishwakarma

Rashtriya Puraskar in 1994 from Ministry

of Labour. Six employees have been given

the same award for 1998.

o 6 BTPS employees were awarded under

Delhi Shramik Sujhao Yojna Puraskar’97 .

Another 8 employees have been awarded

under Delhi Shramik Sujhao Yojna

Puraskar’98 at Vigyan Bhawan on 20th

Aug’02 by Chief Minister of Delhi.

Page 24: Ntpc badarpur training ppt

BTPS awarded Silver shield in Thermal Power Sector for Outstanding Achievement in Safety management

by Greentech foundation for 2003-04

– BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2002-03

– BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2003-04

– BTPS received golden peacock award for IT Innovations for 2003-04

Page 25: Ntpc badarpur training ppt

BTPS received golden peacock award for IT innovations for 2003-04

Page 26: Ntpc badarpur training ppt

Conclusion

The BTPS IT has come a long way from lagging to leading in IT enablement among NTPC power stations. IT Vision realized, making BTPS highly information enabled plant.