    Industrial Summer Training at

    NTPC Badarpur

    Electronics & Communication

  • 7/28/2019 NTPC Badarpur ECE Report

    2/29

    Introduction

    10/31/11

  • 7/28/2019 NTPC Badarpur ECE Report

    3/29

    NTPC - Vision and MissionOur Vision

    A world class integrated power major, powering

    Indias growth, with increasing global presence

    Our Mission

    Develop and provide reliable power, related products

    and services at competitive prices, integrating multipleenergy sources with innovative and eco-friendly technologies and contribute to society

    10/31/11

  • 7/28/2019 NTPC Badarpur ECE Report

    4/29

    NTPC, the largest power Company in India, was setup in

    1975 to accelerate power development in the country.

    NTPC has installed capacity of 29,394 MW.

    15 coal based power stations (23,395 MW)7 gas based power stations (3,955 MW)

    4 power stations in Joint Ventures (1,794 MW).

    The company has power generating facilities in all major

    regions of the country.

    NTPC, was setup in 1975 worlds largest .

    In Forbes list of Worlds 2000 Largest Companies for the

    year 2007, NTPC occupies 411th place.

  • 7/28/2019 NTPC Badarpur ECE Report

    5/29

    Overview of NTPC

  • 7/28/2019 NTPC Badarpur ECE Report

    6/29

    NTPC Badarpur

  • 7/28/2019 NTPC Badarpur ECE Report

    7/29

    NTPC Badarpur

    BTPS was conceived in 1965 to meet thegrowing electricity demand of Northern

    Region.The site construction activities started in1968.The plant became operational with thecommissioning of its first unit on 26th July1973, 2nd unit in ;74 , 3rd unit in 75 , 4th unitin 78 & 5th unit in 81.

  • 7/28/2019 NTPC Badarpur ECE Report

    8/29

    Basic PrincipleThere are basically three main units of a thermal power plant:

    1. Steam Generator or Boiler

    2. Steam Turbine

    3. Electric Generator

  • 7/28/2019 NTPC Badarpur ECE Report

    9/29

    Electricity from Coal

  • 7/28/2019 NTPC Badarpur ECE Report

    10/29

    A generating station which converts heat energy of coal combustion intoelectrical energy is known as a steam power station. Steam is produced in the boiler by utilizing the heat of coal combustion. Thesteam is then expanded in the steam turbine and is condensed in acondenser to be fed into the boiler again. The steam turbine drives thealternator which converts mechanical energy of the turbine into electricalenergy.

  • 7/28/2019 NTPC Badarpur ECE Report

    11/29

    Coal is burnt in a boiler ,which converts water into steam.

    The steam is expanded in a turbine used todrive alternator. The steam expanded is condensed in acondenser to be feed into the boiler again.

    The steam turbine drives the alternator whichconverts mechanical energy of the turbine intoelectrical energy.

  • 7/28/2019 NTPC Badarpur ECE Report

    12/29

    Steam generating equipment Condenser Prime mover Cooling towersElectrical equipment

  • 7/28/2019 NTPC Badarpur ECE Report

    13/29

  • 7/28/2019 NTPC Badarpur ECE Report

    14/29

  • 7/28/2019 NTPC Badarpur ECE Report

    15/29

    A device which removes last traces of moisture.

    It helps in reduction in requirement of steam quantity. Steam being dry reduces the mechanical

    resistance of turbine. No corrosion at the turbine blades.

  • 7/28/2019 NTPC Badarpur ECE Report

    16/29

    Remove heat from thewater discharged fromthe condenser so that the

    water can be dischargedto the river or recirculated and reused.

    Air can be circulated inthe cooling towersthrough natural draft andmechanical draft.

  • 7/28/2019 NTPC Badarpur ECE Report

    17/29

    A natural result from the burning of fossil fuels, particularlycoal, is the emission of flyash. Ash is mineral matter present inthe fuel. For a pulverized coal unit, 60-80% of ash leaves withthe flue gas.

    Two emission control devices for flyash are the fabric filtersand electrostatic precipitators.

    Electrostatic precipitators have collection efficiency of 99%, butdo not work well for flyash with a high electrical resistivity (ascommonly results from combustion of low-sulfur coal). Inaddition, the designer must avoid allowing unburned gas toenter the electrostatic precipitator since the gas could beignited.

  • 7/28/2019 NTPC Badarpur ECE Report

    18/29

    Construction of embankments and fills Construction of road in sub-base Manufacture of cement Manufacture of bricks/blocks Filling as flowable fill material

    Agriculture as soil amendment/sourceof essential plant nutrients

  • 7/28/2019 NTPC Badarpur ECE Report

    19/29

  • 7/28/2019 NTPC Badarpur ECE Report

    20/29

  • 7/28/2019 NTPC Badarpur ECE Report

    21/29

    IT Role & Responsibility

    Maintenance ManagementMaterials & Contracts Management

    Financial AccountingCoal Monitoring & Accounting.Operations & Generation Monitoring

    Hospital ManagementH R & TMS, T/S ManagementOffice Automation & communication.

    E-Samadhan complaints Monitoring

  • 7/28/2019 NTPC Badarpur ECE Report

    22/29

  • 7/28/2019 NTPC Badarpur ECE Report

    23/29

  • 7/28/2019 NTPC Badarpur ECE Report

    24/29

    AwardsMOPs Meritorious Productivity Award:

    For calendar years 1987, 1988, 1990.

    For financial years 92-93, 94-95 and 97-98

    Received Bronze medal in 1998-99 andReceived Silver shield and certificate of Meritorious performance for 2000-01.

    Received Gold shield and Certificate for outstanding performance three consecutiveyears 01-02 & 02-03 , 03-04. the awards werepresented by Honble President of India andHonble power Minister on 24 August 2004.

  • 7/28/2019 NTPC Badarpur ECE Report

    25/29

    Awards

  • 7/28/2019 NTPC Badarpur ECE Report

    26/29

    BTPS received golden peacock award for IT innovations for 2003-04

  • 7/28/2019 NTPC Badarpur ECE Report

    27/29

    ConclusionThe BTPS IT has come a long way fromlagging to leading in IT enablement amongNTPC power stations. IT Vision realized,making BTPS highly information enabled

    plant.

    10/31/11

  • 7/28/2019 NTPC Badarpur ECE Report

    28/29

    ReferenceTRAINING REPORTS OF PAST YEARS ATNALANDA LIBRARY

    INTERNET

    DOCUMENTS OF IT DEPARTMENT