nsw department of education – school infrastructure ......day 1 term 4 2020, monday 12 october...

10
NSW Department of Education – School Infrastructure For more information phone: 1300 482 651 Email: [email protected] Alexandria Park Community School Alexandria Park Community School We are redeveloping Alexandria Park Community School so students from Kindergarten to Year 12 can learn in more innovative learning environments. Phase 1 includes: Artist impression of the Alexandria Park Community School redevelopment 67 permanent learning spaces 6 special education learning spaces A library A special program space 9 workshop spaces Outdoor play space New staff and administration areas School Infrastructure NSW pays respect to and acknowledges the traditional custodians of the Cadigal land on which Alexandria Park Community School is located, and also pays respect to Elders both past, present and emerging. schoolinfrastructure.nsw.gov.au

Upload: others

Post on 09-Nov-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NSW Department of Education – School Infrastructure ......Day 1 Term 4 2020, Monday 12 October 2020: staff start in the new buildings, s chool development / pupil free day. Day 2

NSW Department of Education – School Infrastructure

For more information phone: 1300 482 651Email: [email protected]

Alexandria Park Community School

Alexandria Park Community SchoolWe are redeveloping Alexandria Park Community School so students from Kindergarten to Year 12 can learn in more innovative learning environments.

Phase 1 includes:

Artist impression of the Alexandria Park Community School redevelopment

67 permanentlearning spaces

6 special educationlearning spaces

A library

A special program space

9 workshopspaces

Outdoor play spaceNew staff and administration areas

School Infrastructure NSW pays respect to and acknowledges the traditional custodians of the Cadigal land on which Alexandria Park Community School is located, and also pays respect to Elders both past, present and emerging.

schoolinfrastructure.nsw.gov.au

Page 2: NSW Department of Education – School Infrastructure ......Day 1 Term 4 2020, Monday 12 October 2020: staff start in the new buildings, s chool development / pupil free day. Day 2

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Alexandria Park Community School

Phase 1 – Term 4 2020Phase 1 construction works will be finished and handed over to the school in September 2020. Students and staff will start attending classes in the new buildings from the start of Term 4 2020.

Day 1 Term 4 2020, Monday 12 October 2020: staff start in the new buildings, school development / pupil free day.

Day 2 Term 4 2020, Tuesday 13 October 2020: students start in the new buildings.

The relocation of the school’s furniture and equipment will take place over the school vacation period.

Artist impression of the Alexandria Park Community School redevelopment

Page 3: NSW Department of Education – School Infrastructure ......Day 1 Term 4 2020, Monday 12 October 2020: staff start in the new buildings, s chool development / pupil free day. Day 2

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Alexandria Park Community School

What are innovative learning environments?

Space

■ There are zones for different activities, with varied furniture and resources – such as booths, standing tables, studios and bean bags.

■ Spaces can be connected by glass or sliding doors with furniture in corridors and on balconies to extend the learning space.

■ No front of classroom.

■ Spaces are designed to be shared by multiple classes.

Students

■ Students have the ability to move around the learning space to encourage collaborative learning.

■ Students working across a range of projects simultaneously.

■ Students engaged in hands on learning, building and investigating.

Teachers

■ Movement around the learning space rather than the teacher being at the front of the room.

■ Teachers plan learning together, for example in stage or faculty teams.

■ Teachers teaching together to better meet the needs of students.

Learning

■ Personalised learning, so each student is learning at their own level and pace.

■ Students learning in large groups, small groups or individually.

■ Students are working towards the same project in different subject areas, encouraging cross disciplinary learning.

Technology

■ Technology integrated into the space to extend learning.

■ Accessibility of technology to suit different activities at point of need, for example filming and recording equipment.

■ WiFi accessible across all learning areas.

Our children’s education is vital – they are the next leaders, the future workforce and the foundation of communities for generations to come.

Innovative learning prepares students across all curriculum areas and learning stages with skills and capabilities to thrive in a rapidly changing and interconnected world. It connects students, engages their sense of curiosity, and allows flexible, technology-rich spaces for one-to-one, small group and whole class activities. Innovative learning fosters collaborative learning between students and teachers.

Page 4: NSW Department of Education – School Infrastructure ......Day 1 Term 4 2020, Monday 12 October 2020: staff start in the new buildings, s chool development / pupil free day. Day 2

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Alexandria Park Community School

Significant milestone timelinePhase 1 construction is nearing completion. Phase 2 will start in October 2020.

July 2018

Design endorsed

We are here

February 2019

SSD determined

March 2019

Main building work commenced

October 2020

Phase 1 complete

Early 2022

Phase 2 complete

Relocate into new building

Artist impression of the Alexandria Park Community School redevelopment

Page 5: NSW Department of Education – School Infrastructure ......Day 1 Term 4 2020, Monday 12 October 2020: staff start in the new buildings, s chool development / pupil free day. Day 2

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Alexandria Park Community School

School overview

SPO

RTS

FIE

LD

ALE

XA

ND

RIA

P

AR

K

MU

LTIP

UR

PO

SE

SPO

RTS

FIE

LD

HSC student and staff access only

Driveway crossing

Kiss & drop zone

Community Centre entrance and car park

School entrance from the road

Phase 2 Phase 1

BEL

MO

NT

STR

EET

BU

CK

LAN

D S

TREE

TWarrettah Building

Warrettah Building Wautangal

Building

Poculbee Building

Eorawågo

Bunin (Ground)Jenia (Level 1)

Truck entrance to Phase 2 site

Dun Goola

Milperra

Yarramundi

Burra Gorang

B

Walking path

PARK ROAD

Hoarding

Walking path

Walking path

Hoarding

KEY

Page 6: NSW Department of Education – School Infrastructure ......Day 1 Term 4 2020, Monday 12 October 2020: staff start in the new buildings, s chool development / pupil free day. Day 2

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Alexandria Park Community School

Gomberee language guideAlexandria Park Community School has worked closely with the Metropolitan Lands Council, the Aboriginal Educational Consultative Group, Uncle Terry Denzil and local Aboriginal people in the community to name important areas in the new school in the Gomberee language.

Gomberee Language Name

Concept Location Gomberee Language Name

Concept Location

Bunin Welcome School offices – ground floor Yakka Taka Learning /working together

Warrettah building – Levels 1 & 2

Burra Gorang Firm ground Central courtyard play area Yarramundi Story teller Courtyard amphitheatre between Wautangal and Poculbee buildings

Crua To be cooking Warrettah building ground floor Warrettah Waratah High School learning spaces

Eorawago For the people Community centre Poculbee Purple Iris Primary School learning spaces

Jenla Let us help School office building Level 1 staff hubs

Wautangal Banksia Primary and secondary learning spaces

Maani Hunting/gathering School office building rooftop Getiela Go Play Multipurpose sports field – Phase 2 early 2022

Milperra Meeting place Main school entrance – Park Road Mujmoonah Forest Gum High School learning spaces – Phase 2 early 2022

Oraywa In the clouds Poculbee building – rooftop play area Dun Goola Rain garden Adjacent to Milperra – Phase 2 early 2022

Page 7: NSW Department of Education – School Infrastructure ......Day 1 Term 4 2020, Monday 12 October 2020: staff start in the new buildings, s chool development / pupil free day. Day 2

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Alexandria Park Community School

Phase 2Site establishment for Phase 2, including the installation of hoarding, will start in October 2020.

Construction activities will start in late 2020 with the removal of the temporary school.

Phase 2 includes:

Artist impression of the Alexandria Park Community School redevelopment

17 high school permanentlearning spaces

3 workshopspaces

Outdoor play spaces

A multipurpose hall A gymnasium

Multiple sports courts

We are here

Early 2022

Phase 2 complete

Project timeline

October 2020

Phase 2 site establishment

Late 2020

Remove the temporary school

Late 2020

Start construction

Page 8: NSW Department of Education – School Infrastructure ......Day 1 Term 4 2020, Monday 12 October 2020: staff start in the new buildings, s chool development / pupil free day. Day 2

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Alexandria Park Community School

Phase 2 mapThe multipurpose sports field is a joint-use partnership with City of Sydney.

SPO

RTS

FIE

LD

ALE

XA

ND

RIA

P

AR

K

MU

LTIP

UR

PO

SE

SPO

RTS

FIE

LD

Driveway crossing

Phase 2BU

CK

LAN

D S

TREE

T

Truck entrance to Phase 2 site

Walking path

PARK ROAD

Hoarding

Walking path

BEL

MO

NT

STR

EET

Sport courts

GetielaMultipurpose sports field

Car park

MujmoonahHigh School

learning spaces

Walking path to Park Road school entrance

Hoarding

KEY

Page 9: NSW Department of Education – School Infrastructure ......Day 1 Term 4 2020, Monday 12 October 2020: staff start in the new buildings, s chool development / pupil free day. Day 2

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Alexandria Park Community School

Transport Access GuideTravel to Alexandria Park Community School for staff and students is easy with convenient public transport. This guide provides information on the different travel options to the school for staff and students.

Active modes

Cycling

Bicycle and scooter parking is available for students and staff on school grounds.

Walking

The walk from train stations and the future Waterloo Metro station is well paved with signalised intersections and zebra crossings.

Public transport

Train

The school can be accessed from either Redfern, Green Square and Erskineville stations.

Redfern station is a 12-minute walk via the Australian Technology Park with services on the T1, T2, T3, T4, T8 and T9 lines.

Green Square station is a 13-minute walk via Wyndham Street with services on the T8 line.

Bus

The bus service 355 runs from Bondi Junction and Marrickville during school peak hours with a total of 6 services. The bus stops directly outside the school on Power Avenue.

Car travel

Parking

There is street parking surround the school on Power Avenue, Belmont Street and Buckland Street.

Accessible parking is available for the community centre.

Drop off / Pick up

A kiss and drop zone is located on Park Road.

Please see map on next board.

Page 10: NSW Department of Education – School Infrastructure ......Day 1 Term 4 2020, Monday 12 October 2020: staff start in the new buildings, s chool development / pupil free day. Day 2

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Alexandria Park Community School

Erskineville Station

Redfern Station

Future Waterloo Metro Station

Toward Moore Park

Toward Moore Park

Alexandria Park Community

School

Green Square StationT T

T

T

M

KEY

Staff car park (Phase 2 early 2022)

Indicitive walking route

Crossing facilities

Transport Access Guide Map