2
Airport Overview
Introduction
Airport Activity Demand Forecasts
Preliminary Master Plan Recommendations
PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY 2
Sequence of Master Planning Tasks
3PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
INVENTORY
FORECASTS
DEMAND/CAPACITY & REQUIREMENTS
ALTERNATIVES ANALYSIS
ENVIRONMENTAL OVERVIEW
AIRPORT LAYOUT PLAN (ALP)
FINAL REPORT
What are HWO’s current facilities and infrastructure assets? What are the existing conditions?
What is the projected future growth for HWO’s traffic and activity levels?
How much capacity does HWO have? Are there capacity gaps in the future?
How should the capacity gaps be addressed? How can the Airport be improved?
Environmental implications of the proposed improvements?
What projects are needed to fulfill HWO’s future needs?
What is the future vision for HWO based on the Master Plan recommendations?
Successful Completion of the Master Planning Process
FAA FORECAST APPROVAL April 28, 2017
TBD
PUB
LIC
INVO
LVEM
ENT
MASTER PLAN INITIATION October 13, 2016
FAA/FDOT CONDITIONAL APPROVAL OF ALP
CAPITAL IMPROVEMENT PROGRAM
FALL 2019
FALL 2019
SUMMER 2019STAK
EHO
LDER
INVO
LVEM
ENT
SUMMER 2019
SUMMER 2019
Master Plan Stakeholder Committees
4
POLICY ADVISORY COMMITTEE (PAC)
Role:• Review master planning technical analysis• Input on operational perspectives
TECHNICAL ADVISORY COMMITTEE (TAC)
Role:• Input on macro-level policy issues• Provide comments relative to aviation goals of Broward County• Community and Regulatory Perspectives In addition, Tenant Briefings were held on August 22, 2018 and May 22, 2019 to
present and receive input on the Master Plan Update’s progress to date.
Internal Stakeholders
Internal Stakeholders
Meeting DatesSeptember 22, 2016
June 21, 2018May 22, 2019
Meeting DatesSeptember 28, 2016
June 21, 2018May 22, 2019
PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
Proposed HWO Airport Community Advisory Group
5PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
North Perry Airport At-a-Glance
6PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
About North Perry Airport
7
• FAA designated reliever to FLL to relieve existing and future GA activity
• Provide a public asset to surrounding community to support aeronautical and non-aeronautical uses
• National Plan of Integrated Airport Systems (NPIAS) as regional airport asset
Role and Need
PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
Existing Tenant Base and Users
• Approximately 45 aviation businesses and 8 flight schools
• 4 Fixed Base Operators (FBO)
8
• Aerial advertising• Aircraft detailing• Aircraft fueling• Aircraft maintenance• Aircraft parking
• Airship mooring• Avionics repair and training• Charter• Civil Air Patrol• Flight training
• Florida Aero Club• Helicopter tours• Metro helicopter services• Mosquito control
North Perry Central
Hollywood Aviation
Bobby’s Landing
Pelican Flight Training
PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
• HWO also supports the following aviation activities and jobs:
Airport is Home to Broward College
HWO is home to the Emil Buehler Aviation Institute at Broward College
• Dedicated to the training of aviation professionals:
– Professional pilot training
– Aircraft maintenance
– air traffic control
– airport management
• Over 800 students enrolled in aviation programs
• 7,000 sq. ft. hangar with direct airfield access
• 12 based aircraft
• 25 staff supporting aviation
• On-site flight lab, tower, radar, and en-route air traffic control simulators
9
SOURCE: Broward College, http://www.broward.edu/academics/programs/aviation/Pages/default.aspx (accessed March 7, 2019).
PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
Economic Benefits of North Perry Airport
10
SOURCE: Florida Department of Transportation, Florida Statewide Economic Impact Study, March 2019.
PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
ON-AIRPORTAirport administration,
airport tenants, and capital investments
VISITORGoods and services at
hospitality businesses and the jobs and payroll supported by those
expenditures
DIRECT IMPACTS
Output
$119.1 MILLION
TOTAL IMPACTS
Payroll
$40.3 MILLION
Jobs
1,163
MULTIPLIER EFFECT
Supplier purchases (indirect impacts) and employee spending (induced impacts)
Airport Property Boundary
19R19L
28R
28L
1R1L
10R
10L
3350
’ x 1
00’
3260
’ x 1
00’
3255’ x 100’
3240’ x 100’
Physical Characteristics
North Perry Airport includes: • 522 acres1/
• 4 runways– 1L/19R (3350 x 100 ft.)– 1R/19L (3260 x 100 ft.)– 10L/28R (3240 x 100 ft.)– 10R/28L (3255 x 100 ft.)
• Aircraft over 12,500 pounds Maximum Certified Takeoff Weight (MTOW) are prohibited
NOTE:1/ HWO acreage from Exhibit A – Property Map, Broward County Aviation Department (BCAD), August 2008.
11PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
Physical Airport Attributes and Land Availability
12PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
BCAD Admin. / Maintenance
Helicopter Inc.
HWO Aerospace
HWO Aviation
Twy P
Twy N
Twy
B
Twy
D
Twy
E
Twy M
Twy L
3,240’x100’
3,255’x100’
3,2
60
’x10
0’
19R
10L 28R
10R 28L
1L 1R
Village Shops
Bobby’s Landing
Hollywood Aviation
Broward County Park-n-Ride
Broward County Mosquito Control
North Perry Central
Diversified Aviation
Van Wagner Aerial Media Aviation
Pelican Flight Training
Broward College Aviation Institute
Broward College Judson A. Samuels
South Campus
Maxwell Park
Pines Recreation
Center General Aviation Facilities
Potential Development Parcel
Air Traffic Control Tower
Existing Airport Property Line
LEGEND
19L
Broward County Control
3,3
50
’x10
0’
Wayman Aviation
SOURCES: Broward County Aviation Department, September 2018 (aerial photography); Ricondo & Associates, Inc, May 2019.
Airport Activity Demand Forecasts
13PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
Based Aircraft Projections
14
NOTES: 1 CAGR = Compound Annual Growth Rate2 2017 Based aircraft estimate provided by Broward County Aviation Department (BCAD)3 Historical and forecast based aircraft based upon calendar year (CY)
SOURCES: Broward County Aviation Department (historical data); Kimley-Horn and Associates, Inc., April 2017 (forecast data); Ricondo & Associates, Inc., July 2018.
0
50
100
150
200
250
300
350
400
450
500
Historical Based Aircraft 2017 Approved Forecast FAA Approved Growth Rate Applied to Historical Based Aircraft
CAGR: 0.66%
398454
463
411 2/
PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
Aircraft Operations Projections
15
NOTES:1. CAGR = Compound Annual Growth Rate2. Historical and forecast operations are based upon calendar year (CY)
SOURCES: FAA Air Traffic Activity System (ATADS), March 2018 (historical data); Kimley-Horn and Associates, April 2017 (forecast data), Inc.; Ricondo & Associates, Inc., June 2018.
0
50,000
100,000
150,000
200,000
250,000
300,000
Itinerant Operations Local Operations 2017 Approved Forecasts FAA Approved Growth Rate Applied to 2017 Historical Numbers
CAGR: 0.66%171,550
195,500
255,000226,500
PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
Preliminary Master Plan Recommendations
16PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
Requirements Analysis Summary
17
Note: Numbers may not add up due to rounding.
PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
HWO’s airfield has adequate capacity to serve the operational demand levels projected through the Master Plan’s 20-year planning horizon.
Facility Type Existing (Acres) 2035 Estimate (Acres) 1/ Deficiency (Acres)
Aircraft Storage 41.3 54.6 13.3
Tenant Facilities 27.8 36.2 8.5
Subtotal - GA/FBO 69.1 90.8 21.7
ATCT 0.9 0.9 None
Airport Administration and Maintenance 0.1 0.2 0.1
Subtotal -- Support Facilities 1.0 1.1 0.1
Total 70.1 91.9 21.8
1/ 2035 estimate based upon Sensitivity Level 2 developed in the Airport Master Plan Update.
General Aviation (GA) / Fixed Base Operator (FBO)
Support Facilities
SOURCE: American Infrastructure Development, Inc., Demand Capacity Analysis, August 2018.
Proposed Airfield Enhancements
18
SOURCES: Quantum Spatial, July 2016 (aerial photography); Kimley-Horn and Associates, Inc., April 2017 (proposed pavement and cost estimates); American Infrastructure Development, Inc. (cost estimates) and Ricondo & Associates, Inc., September 2018.
Replacement ATC Tower & Airfield Electrical Vault
Taxiway Geometry Modifications
Airfield projects may be partially funded with FAA and FDOT grants
Notes:1/ Estimated project costs include construction and soft costs. Costs developed using 2018 U.S. dollars. 2/ Airfield Modifications are reflective of the confirmed recommendations from Airfield Safety Enhancements and Geometry Study. 3/ Airfield lighting improvements include edge lighting for Runway 1R-19L, Taxiway E, and replacement of the airfield electrical vault.
Airfield Modification: FAA Airfield Design Standards Conformance(+/- 200 ft. Pavement Extension)
Airfield Modifications 2/
ATCT Replacement
Airfield Lighting Improvements3/
$23,510,000
$3,800,000
$2,000,000
Total $29,310,000
Project DescriptionROM Cost Estimate1/
PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
Recommended Land Use Option Plan
19
Sources: Ricondo & Associates, Inc., December 2018; American Infrastructure Development, Inc., December 2018; Kimley-Horn & Associates, Inc., April 2017.
Tenant facility development to be funded by lessees
PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
Other Airport Development Initiatives
20
SOURCES: Ricondo & Associates, Inc., December 2018; American Infrastructure Development, Inc., December 2018; Kimley-Horn & Associates, Inc., April 2017.
Separated Shared-Use Path and Landscaping Along
Airport Road
BCAD Administration and Maintenance Facility Expansion
Replacement ATC Tower
Potential Realignment of Airport Road Around Parcel 6
PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
Projects may be partially funded with FAA and FDOT grants
Master Plan Update Conceptual Rendering
21PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
BCAD Administrative & Maintenance Facilities
Aircraft Storage Hangars & Parking Apron (by
Others)
Construct Westside Parallel Taxiway A
Separated Shared-Use Path and Landscaping
ImprovementsAircraft Parking Apron
Air Traffic Control Tower Replacement
Aircraft Storage Hangars & Parking Apron (by
Others)
Airfield Electrical Upgrades
• Up to 12 to 16 feet wide paved surface • Landscaped buffer between roadway • Connects SW 77th Way to Island Drive • Amenities, including lighting, designed
for walkers, joggers, and bicyclists
22
Representative Separated Shared-Use Path and Landscaping Improvements*
PRELIMINARY DRAFT - FOR DISCUSSION PURPOSES ONLY
*Development of shared-use path is dependent on funding availability.
Estimated Capital Development Costs (2018 Dollars)
23
Project Description Total Estimated Costs
Projected BCAD Share of Total Costs 1/
Estimated BCAD Costs 1/
Landside Modifications:
Separated Shared-Use Path (Bike Path/Pedestrian Walkway) $1,960,000 0% $0Eastside Access Roadway and Utilities $500,000 20% $100,000Airport Road Realignment $760,000 20% $152,000
Subtotal (Roadway Modifications) $3,220,000 7.8% $252,000Airfield Enhancements:
Airfield Lighting Enhancements $2,000,000 20% $400,000FAA Design Standard Compliance Initiatives $3,942,000 5% $197,100Other Airfield Geometry Modifications $19,568,000 20% $3,913,600
Subtotal (Airfield Enhancements) $25,510,000 17.7% $4,510,700Airport Support Facilities:
Airport Administration and Maintenance Building Expansion $760,000 50% $380,000Air Traffic Control Tower Replacement $3,800,000 20% $760,000
Subtotal (Airport Support Facilities) $4,560,000 25.0% $1,140,000
Grand Total $33,290,000 17.7% $5,902,7001/ Projected BCAD share of total project costs is dependent on funding availability.