mungcharoen green power co.,ltd the energy long live for surin province

23
Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

Upload: george-obrien

Post on 28-Dec-2015

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

Mungcharoen Green Power

Co.,LtdThe Energy Long Live For Surin

Province

Page 2: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

Company Profile

Page 3: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

Our company background from Thailand energy policy, This energy policy has major

objectives to promote alternative energy to

complement and strengthen Thai Electricity system by using own resources from

biomass such as Rice husk, Sugar cane-bagasse corn

leaves, plam shell and woodchip, to reduce the

import of fossil fuels and to replace Thai supply of fossils fuels which is forecasted to

run short in the next 30 years

Page 4: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

Mungcharoen Green power has developed Rice Husk Power Plant

since 2004 in Surin Province, Northern part of Thailand.

The project started construction in January 2005 and completed in November 2006. The Project start commercial operation on

January 23,2007

Page 5: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

Mungcharoen Green Power Co.,Ltd is Located at 333 Moo 7, Surin-Sikhoraphum Road, Tumbon Burusi, Muang District, Surin Province

Company Location

Page 6: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

A200,000 ลบ.ม.

B400,000 ลบ.ม.

C180,000 ลบ.ม. D60,000 ลบ.ม.

Factory Layout

Factory building

4 Water storage pond

Page 7: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

1 day Silo

Boiler PlantSTG House

Cooling Tower

Water Treatment Plant

Earth Pond

Factory Building Plant

Page 8: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

Process Electric Generation

Design plant, we use rice husk is main fuel in process electrical generation for emergency case can use other biomass in process

The rice husk for supply plant 80% from Mungcharoen Rice mill and 20% from alliance

Page 9: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

Process Electric Generation

Fuel consumption in 85,000 Ton/Year for generate

Electricity 65 Million

kWh / year

Page 10: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

Process Electric Generation

For steam generation, we use Biomass Fire Boiler design by “ERK German” capacity 55 TPH to generated medium pressure super heated steam 40 Bar , 435 degree ‘C

Furnace and combustor, we use technology from German by use combustor type “Step Grate”

Page 11: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

Process Electric Generation

Turbine type “Full Condensing Steam Turbine” from HTC capacity 9,900 kW rate speed 8,540 RPM with “Gear reduction”

Electricity generation by use Synchronous Generator type “Automatic Voltage Regulator (AVR)” capacity 11,560 KVA (9,900 kW at PF 0.85) and generate voltage 11,000 V

Page 12: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

The electricity sell to the EGAT Public Company Limited “Firm”, and connect to grids with PEA line Feeder # 5

Grid Connection

Page 13: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

Product

ElectricityMungcharoen Green power generated 9.9 MW of electric power. 8 MW of electric power to be sold to EGAT.

0.8 MW of electric power to be sold to Mungcharoen Rice Mill

0.8 MW of electric power to be used in the power plant.

Page 14: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

Product

Rice Husk Ash

(RHA) is by product of complete combustion of rice husk. This kind of ash is high in quality, and it is an essential raw material for steel and silica plant industries.

Page 15: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

Environmental and Management

Page 16: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

Waste Water From Process

We design to zero discharge system, and over all water not reject outer factory

Page 17: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

Use the zero discharge principle to relieve the anxiety of nearby communities. In practices, waste water is treaded to have quality in accordance with the ministry of industry standard before releasing to holding pond.

Page 18: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

Air Pollution System

Power plant use clean technology by use 2 system air treatment

Use the first cleaning by use “Cyclone Dust Collector” and second cleaning by use “ESP”

Page 19: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

2.Air pollution

Use clean technology, first step use dust collector.

For particle 10> micron 0( 01. mm )

Page 20: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

2.Air pollution

Second step use Electrostatic Precipitator (ESP).

For particle < -01. 1 micron (0.0001 - 0.001 mm )

Page 21: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

Third Party Certify

Page 22: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

We are Biomass Learning Center

Page 23: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province

We are Modern Power Plant

High Efficiency and Clean Technology