    Super Storm Sandy:Under River Tube Recovery and Resiliency

    June 5 2013

  • 7/28/2019 Montague and Greenpoint tube Damage

    2/27

    Sandy damaged 9 under-river tubes

    1

    Rutgers

    4 5

    2

    A

    E

    F

    R

    3

    C

    Canarsie

    53rd StM

    G

    L

    Steinway7

    New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    3/27

    Sandy damage to under river tubes was historic

    2

    Flooded track and equipment Destroyed pump control

    Damaged fan control

    Shorted electrical equipment

    Failed signals Broken communication gear

    New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    4/27

    Temporary solutions that facilitated prompt service restoration

    requires permanent fixes and upgrades

    3

    Fan plants

    Circuit Breaker Houses Power feeds

    Reduced pumping capacity

    Reduced

    redundancy

    Temporary

    configurations

    Temporary power lines

    for pumps

    Temporary pumps

    Temporary wiring for

    signals, fans, comms

    Examples

    New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    5/27

    Failures affecting customers have dramatically increased in some

    areas post-Sandy

    4

    300

    120 x increase incustomers delayed

    In the 6 months after Sandy

    (customers delayed due to signal

    problems in Montague tube

    per month)

    38,300

    In the 6 months before Sandy

    (customers delayed due

    to signal problems in

    Montague tube per month)

    Number of customers delayed per month due to signal failures in Montague Tube

    New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    6/27

    Failures affecting customers have dramatically increased in some

    areas post-Sandy

    5New York City Transit

    5,000

    10,000

    15,000

    20,000

    25,000

    May 12 Jun 12 Jul 12 Aug 12 Sep 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mar 13 Apr 13 May 13

    Sandy outage

    Number of customers delayed due to signal failures in Montague Tube

  • 7/28/2019 Montague and Greenpoint tube Damage

    7/27

    In addition corrosion is now becoming apparent that will lead to

    further failures and customer delays if left unchecked

    6

    Greenpoint Tube

    pump cable

    Greenpoint Tube rail

    plates

    Externally cable

    appears undamaged

    but corrosion occurring

    within jacket

    New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    8/27

    Greenpoint tubeMontague tube

    Montague and Greenpoint sustained heavy flooding and were the

    last tubes to re-enter service post-Sandy

    7

    R G

    Opened 1920

    Flooded to ceiling

    Longest tube in system (5000)

    Re-entered service Dec 21

    Extensive damage to all systems

    Opened 1933

    Flooded to ceiling

    Re-entered service November 10

    Extensive damage to all systems

    New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    9/27

    Montague and Greenpoint tubes flooded to ceiling

    8New York City Transit

    Flood line extends to

    ceiling (Montague)

    Flood line extends to

    ceiling (Montague)

  • 7/28/2019 Montague and Greenpoint tube Damage

    10/27

    Montague cable replacement work is complicated by damaged concrete

    and terracotta duct banks that must be demolished and rebuilt

    9

    Damaged bank,exposed and collapsed

    ducts

    Damaged concretebank, exposed and

    collapsed ducts

  • 7/28/2019 Montague and Greenpoint tube Damage

    11/27

    Montague and Greenpoint tube damage damage makes pulling cable

    without rebuilding of the 28,000 linear feet of the duct bank infeasible

    10New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    12/27

    Montague and Greenpoint tube damage duct bank damage

    11New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    13/27

    Montague and Greenpoint tube damage duct bank damage

    12New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    14/27

    Montague and Greenpoint tube damage duct bank damage

    13New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    15/27

    Montague and Greenpoint tube damage signal problems

    (impedance bond)

    14New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    16/27

    Montague and Greenpoint tube damage circuit breaker house damage

    that could reduce power reliability

    15New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    17/27

    Montague and Greenpoint tube damage temporary configuration of

    Whitehall pump plant

    16New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    18/27

    Montague and Greenpoint tube damage corroded rail and fasteners

    17New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    19/27

    Montague and Greenpoint tube damage corroded rail and fasteners

    18New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    20/27

    Damaged systems are safe but will lead to increasing delays if

    unaddressed - we will not compromise on safety

    19

    Power cables

    Communication and control cables

    Signals

    Tunnel lighting

    Track

    Circuit Breaker Houses

    Third Rail

    Fans

    Pumps

    New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    21/27

    To maximize speed and stay ahead of failures an intense work

    program is planned for Montague and Greenpoint tubes

    20

    2013 2014

    Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctTube

    Greenpoint - 12 weekend

    outages 2013 and 5

    week 24/7 shutdown in

    summer 2014

    Montague 24/7 shut down24/7 shutdown August 3 early Oct 14 14 months

    5 week 24/7 shutdown

    summer 2014

    G

    R

    New York City Transit

    July 6

    July 13

    July 20

    August 3

    August 10

    August 17

    August 24

    September 7

    September 28

    October 5

    December 7

    December 14

    Outages on weekends commencing at 12:01

    AM on Saturday on these dates:

  • 7/28/2019 Montague and Greenpoint tube Damage

    22/27

    24/7 shutdown in Montague means other tubes dont need to wait

    multiple years for restoration work

    21

    2013 2014 2015 2016 2017 2018Tube

    24/7 shutdown

    for Montague

    Work can start on

    an adjacent tube

    Conventional approach

    for Montague

    (weekend outages)

    Work can start on

    an adjacent tube

    R

    R

    New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    23/27

    Accelerated approach helps reduce unexpected customer delays

    and further deterioration

    22

    Directly addresses root causes of increased delay causing failures

    already observed

    Gets ahead of slower onset causes of delay (eg corrosion)

    Reduces dramatically the number of post weekend mid-job returns

    to service with associated possibilities for delay causing troubles

    New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    24/27

    Service will be split

    Northern Forest Hills-71 Av to/from

    Whitehall St-South Ferry

    Southern Bay Ridge-95 St to/from Court St

    Service Frequency

    Peak hour service will be slightly reduced due to

    track capacity limitations (8 TPH vs 10 TPH)

    Off-peak service frequencies will be unchanged

    Subway Crowding

    Loads on the and adjacent lines will increase

    but are projected to be within our maximum

    loading guidelines

    Station crowding at transfer locations will be

    monitored and additional staffing added as

    needed

    Enhanced customer communications regardingtransfers and alternative travel routes

    Weekday Service During Montague R Tunnel Closure

    23

    R

    R

    R

    R

    R

    New York City Transit

  • 7/28/2019 Montague and Greenpoint tube Damage

    25/27

    Weekday Service During Montague R Tunnel Closure service

    alternatives

    24

    R

    New York City Transit

    Riders can transfer to the following lines

    all of which are accessible from the final four stations in BrooklynR

    2 3 4 A B5 C D F N Q

  • 7/28/2019 Montague and Greenpoint tube Damage

    26/27

    Weekend/Late Night Service During Montague Tunnel Closure

    25

    R

    R Weekend Service

    Operates between Forest Hills-71 Av and Bay

    Ridge-95 St over the Manhattan Bridge

    Six stations bypassed

    City Hall

    Cortlandt St

    Rector St

    Enables targeted work at bypassed stations

    Provides a faster ride for some riders traveling

    between Manhattan and Brooklyn

    Late Night Service (Daily)

    Normal shuttle between Bay Ridge-95 St

    and 36 St would operate

    service would be rerouted over the Manhattan

    Bridge (6 stations bypassed)

    Enhanced customer communications regarding

    transfers and alternative travel routes

    Whitehall St-South Ferry

    Court St

    Jay St-MetroTech

    R

    R

    R

    N

    New York City Transit

    Weekend service

  • 7/28/2019 Montague and Greenpoint tube Damage

    27/27

    G Service

    Operates between Nassau Av and Church Av

    during weekend closures

    Bus Shuttle Service

    Operates between Nassau Av and Court Sq,

    making subway stops during weekend closures

    3-5 min headway

    Stations not served by the G during weekend

    closures

    Greenpoint Av

    21 St

    Court Sq

    Targeted enhancements in stations out of service

    on weekends

    Service During Weekend closures

    26

    G

    G

    G

    WeekendService