Super Storm Sandy:Under River Tube Recovery and Resiliency
June 5 2013
-
7/28/2019 Montague and Greenpoint tube Damage
2/27
Sandy damaged 9 under-river tubes
1
Rutgers
4 5
2
A
E
F
R
3
C
Canarsie
53rd StM
G
L
Steinway7
New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
3/27
Sandy damage to under river tubes was historic
2
Flooded track and equipment Destroyed pump control
Damaged fan control
Shorted electrical equipment
Failed signals Broken communication gear
New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
4/27
Temporary solutions that facilitated prompt service restoration
requires permanent fixes and upgrades
3
Fan plants
Circuit Breaker Houses Power feeds
Reduced pumping capacity
Reduced
redundancy
Temporary
configurations
Temporary power lines
for pumps
Temporary pumps
Temporary wiring for
signals, fans, comms
Examples
New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
5/27
Failures affecting customers have dramatically increased in some
areas post-Sandy
4
300
120 x increase incustomers delayed
In the 6 months after Sandy
(customers delayed due to signal
problems in Montague tube
per month)
38,300
In the 6 months before Sandy
(customers delayed due
to signal problems in
Montague tube per month)
Number of customers delayed per month due to signal failures in Montague Tube
New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
6/27
Failures affecting customers have dramatically increased in some
areas post-Sandy
5New York City Transit
5,000
10,000
15,000
20,000
25,000
May 12 Jun 12 Jul 12 Aug 12 Sep 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mar 13 Apr 13 May 13
Sandy outage
Number of customers delayed due to signal failures in Montague Tube
-
7/28/2019 Montague and Greenpoint tube Damage
7/27
In addition corrosion is now becoming apparent that will lead to
further failures and customer delays if left unchecked
6
Greenpoint Tube
pump cable
Greenpoint Tube rail
plates
Externally cable
appears undamaged
but corrosion occurring
within jacket
New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
8/27
Greenpoint tubeMontague tube
Montague and Greenpoint sustained heavy flooding and were the
last tubes to re-enter service post-Sandy
7
R G
Opened 1920
Flooded to ceiling
Longest tube in system (5000)
Re-entered service Dec 21
Extensive damage to all systems
Opened 1933
Flooded to ceiling
Re-entered service November 10
Extensive damage to all systems
New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
9/27
Montague and Greenpoint tubes flooded to ceiling
8New York City Transit
Flood line extends to
ceiling (Montague)
Flood line extends to
ceiling (Montague)
-
7/28/2019 Montague and Greenpoint tube Damage
10/27
Montague cable replacement work is complicated by damaged concrete
and terracotta duct banks that must be demolished and rebuilt
9
Damaged bank,exposed and collapsed
ducts
Damaged concretebank, exposed and
collapsed ducts
-
7/28/2019 Montague and Greenpoint tube Damage
11/27
Montague and Greenpoint tube damage damage makes pulling cable
without rebuilding of the 28,000 linear feet of the duct bank infeasible
10New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
12/27
Montague and Greenpoint tube damage duct bank damage
11New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
13/27
Montague and Greenpoint tube damage duct bank damage
12New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
14/27
Montague and Greenpoint tube damage duct bank damage
13New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
15/27
Montague and Greenpoint tube damage signal problems
(impedance bond)
14New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
16/27
Montague and Greenpoint tube damage circuit breaker house damage
that could reduce power reliability
15New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
17/27
Montague and Greenpoint tube damage temporary configuration of
Whitehall pump plant
16New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
18/27
Montague and Greenpoint tube damage corroded rail and fasteners
17New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
19/27
Montague and Greenpoint tube damage corroded rail and fasteners
18New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
20/27
Damaged systems are safe but will lead to increasing delays if
unaddressed - we will not compromise on safety
19
Power cables
Communication and control cables
Signals
Tunnel lighting
Track
Circuit Breaker Houses
Third Rail
Fans
Pumps
New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
21/27
To maximize speed and stay ahead of failures an intense work
program is planned for Montague and Greenpoint tubes
20
2013 2014
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep OctTube
Greenpoint - 12 weekend
outages 2013 and 5
week 24/7 shutdown in
summer 2014
Montague 24/7 shut down24/7 shutdown August 3 early Oct 14 14 months
5 week 24/7 shutdown
summer 2014
G
R
New York City Transit
July 6
July 13
July 20
August 3
August 10
August 17
August 24
September 7
September 28
October 5
December 7
December 14
Outages on weekends commencing at 12:01
AM on Saturday on these dates:
-
7/28/2019 Montague and Greenpoint tube Damage
22/27
24/7 shutdown in Montague means other tubes dont need to wait
multiple years for restoration work
21
2013 2014 2015 2016 2017 2018Tube
24/7 shutdown
for Montague
Work can start on
an adjacent tube
Conventional approach
for Montague
(weekend outages)
Work can start on
an adjacent tube
R
R
New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
23/27
Accelerated approach helps reduce unexpected customer delays
and further deterioration
22
Directly addresses root causes of increased delay causing failures
already observed
Gets ahead of slower onset causes of delay (eg corrosion)
Reduces dramatically the number of post weekend mid-job returns
to service with associated possibilities for delay causing troubles
New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
24/27
Service will be split
Northern Forest Hills-71 Av to/from
Whitehall St-South Ferry
Southern Bay Ridge-95 St to/from Court St
Service Frequency
Peak hour service will be slightly reduced due to
track capacity limitations (8 TPH vs 10 TPH)
Off-peak service frequencies will be unchanged
Subway Crowding
Loads on the and adjacent lines will increase
but are projected to be within our maximum
loading guidelines
Station crowding at transfer locations will be
monitored and additional staffing added as
needed
Enhanced customer communications regardingtransfers and alternative travel routes
Weekday Service During Montague R Tunnel Closure
23
R
R
R
R
R
New York City Transit
-
7/28/2019 Montague and Greenpoint tube Damage
25/27
Weekday Service During Montague R Tunnel Closure service
alternatives
24
R
New York City Transit
Riders can transfer to the following lines
all of which are accessible from the final four stations in BrooklynR
2 3 4 A B5 C D F N Q
-
7/28/2019 Montague and Greenpoint tube Damage
26/27
Weekend/Late Night Service During Montague Tunnel Closure
25
R
R Weekend Service
Operates between Forest Hills-71 Av and Bay
Ridge-95 St over the Manhattan Bridge
Six stations bypassed
City Hall
Cortlandt St
Rector St
Enables targeted work at bypassed stations
Provides a faster ride for some riders traveling
between Manhattan and Brooklyn
Late Night Service (Daily)
Normal shuttle between Bay Ridge-95 St
and 36 St would operate
service would be rerouted over the Manhattan
Bridge (6 stations bypassed)
Enhanced customer communications regarding
transfers and alternative travel routes
Whitehall St-South Ferry
Court St
Jay St-MetroTech
R
R
R
N
New York City Transit
Weekend service
-
7/28/2019 Montague and Greenpoint tube Damage
27/27
G Service
Operates between Nassau Av and Church Av
during weekend closures
Bus Shuttle Service
Operates between Nassau Av and Court Sq,
making subway stops during weekend closures
3-5 min headway
Stations not served by the G during weekend
closures
Greenpoint Av
21 St
Court Sq
Targeted enhancements in stations out of service
on weekends
Service During Weekend closures
26
G
G
G
WeekendService