micro hydro

23
Presentation of Feasibility Study Report of Nibu Khola III MHS Prepared By: Manchan Tiwari (507) Sandeep Joshi (517) Nishant Poudyal (506) Baibhav Ramanuj Dhungana

Upload: ukesh-shrestha

Post on 24-Nov-2015

20 views

Category:

Documents


0 download

DESCRIPTION

small feasibility study of microhydro

TRANSCRIPT

Presentation of Feasibility Study Report of Nibu Khola III MHS

Presentation of Feasibility Study Report of Nibu Khola III MHSPrepared By:Manchan Tiwari (507)Sandeep Joshi (517)Nishant Poudyal (506)Baibhav Ramanuj DhunganaOverviewBackgroundIntroductionMethodologyTechnical AspectsFinancial and Economic AspectsRisk AnalysisConclusionBackgroundMicro hydro : Decentralised energy systemLightening and end use purposeSocial-economic development/ upliftment of living standard of the people of the regionTarrif collectionPossibility of end use produce revenue and employement opportunityIntroductionFeasilibity study of energy projectNibu Khola III MHS situated in Aangsarang VDC, Panchthar12 kW energy system116 beneficiary householdsDesign flow available 12 monthsEnd uses revenue are based on assumptionsSalient FeaturesProject LocationName of Project:Nibu Khola III MHSLocation:Aangsarang VDC Ward no.-2, SisneriDistrict:PanchtharName of source: Nibu Khola Nos. of Household Benefited:116Altitude:915 m AMSLNearest Road Head:RankeWalking hours from Ranke : 5 hrs (For unladen local)Ownership Type:CommunityTechnical FeaturesGross Head:19 mNet Head:17.95 m Measured Flow:180 lps at 14th AprilMinimum Flow Available:177.75 lpsDesign flow for intake:143.33 lpsDesign flow for power generation:129 lpsHead Race length:492 mPower Output:12 kWOverall efficiency:50%

Contd...Electro-MechanicalType of Turbine :Crossflow T15, 16 KW Shaft Output, 75% Efficiency Mech. Transmission:Belt drive, V-beltGenerator:25 KVA, 3 Ph., 50 HZ, 400/230 V, 1500 rpm Synchronous Generator, Brush lessPenstock Pipe: Length 44 m, 260 mm ID, MS, 3mm thick.Electric Poles:156 Nos. of wooden poles.T & D Lines: 6.259 km (one way length)Load controller:ELC, 12kWBallast Load:15 kW

MethodologyBased on desk survey and calculationsDatas from field survey were available from DDC:DEES PanchtharProvided Datas: Head, site flow, canal length, settlement, length of conductors required, penstock length, topography, geology water right and energy use pattern.Technical AspectsComponents:HeadworkGravel trap/Silting basinHeadrace canalForebayPenstock Anchor Block/ Slide BlocksPower houseMachine foundationTailrace canalTurbinePenstockExpansion JointTrashrackValvesDrive SystemFlushing setGeneratorGoverning SystemProtection SystemTransmission and distribution systemFinancial and Economic AspectsTotal Project Cost

SNDescriptions Cost (NRs) %age of Total Total Local Non Local 1Mechanical works 462,777 - 462,777 16.29 2Electrical works 1,305,379 36,320 1,269,059 45.95 3Civil works 783,365 356,025 427,341 27.57 4Transportation 65,000 - 65,000 2.29 5Tools 14,690 - 14,690 0.52 6Spare parts 18,306 - 18,306 0.64 7Installation and Testing-Commissioning 75,000 - 75,000 2.64 8Sub-Total 2,724,517 392,345 2,332,172 95.90 9Contingencies (5% of Non Local Cost) 116,609 116,609 4.10 10 Total Project Cost 2,841,126 392,345 2,448,781 100.00 Sources of FinanceS.N.SourcesAmount (Rs)Share (%)Remarks1AEPC/REDP Subsidy 1,020,000 36AEPC /REDPSubsidy2DDC Investment 142,056 5.005% of TPC3VDC Investment 300,000 1010%-15% of TPC4Community Contribution 137907049Total Source of Finance: 2,841,126 100.00Expected Annual RevenueLightening : NRs. 2 per watt per monthEnd Use: NRs. 7 per kWh

S.N.Type of BusinessLocationPower (kW)Operating HoursOperating Days /MonthOperating Months /YearTotal Energy Consump (kwh) Tariff/kWhTotal IncomeRemarks1Agro-processing Unit 5.50 7251211550780850Huller/Grinder2Dairy

5.00 520126000742000At Village3Battery Charger 1.00 725122100714700At Village Total:5.519650137550Income from tarriff collectionS.N.No of HouseholdsLocation WardPower (kW)Operating HoursOperating Days /MonthOperating Months /YearTotal Energy Consump (kWh) TariffTotal IncomeRemarks1116Ward no.2,11282812322562288000Power Basis*1232256288000Total revenue= NRs. 425550Annual expensesS.N.ComponentMonthly ExpensesMisc ExpenseTotal ExpensesMonthTotal Annual ExpenditureRemarks1MH Operator I4000400012480002Repair & Maint.7103710312852343 % of TPC3Miscellaneous150150121800Max.12000.0 Total:1125311253135034Cash Outflow, 0Cash Flow DiagramIRR and NPV calculationsYearInvestmentRevenueExpenseCumulative Amount(P/F) factor(10%)Present Value01821126-18211261-182112614255701350342905361.1264123.636424255701350342905361.21240112.396734255701350342905361.331218283.99744255701350342905361.4641198439.997354255701350342905361.6105180401.117764255701350342905361.7716163996.387474255701350342905361.9487149092.215384255701350342905362.1436135536.480794255701350342905362.3579123218.1178104255701350342905362.5937112016.0389114255701350342905362.8531101831.6918124255701350342905363.138492574.56029134255701350342905363.452384157.22851144255701350342905363.797576507.17577154255701350342905364.177269552.8105IRR = 13.6%NPV = NRs. 388714Payback Period = 6.2 yearsBenefit-cost calculationsInvestment cost = NRs. 2841126Annual cost = 135034Depreciation = 121408Revenue = 425550Benefits:Kerosine replacement = 307800Diesel replacement = 189000Battery cell replacement = 76800YearInitial CostAnnual costDepreciationTotal CostAnnual BenefitAnnual RevenueTotal Benefit(P/F) factor(10%)Present Value for CostPresent Value for Benefit028411262841126012841126011350341214082564425736004255709991701.1233129.0909908336.363621350341214082564425736004255709991701.21211935.5372825760.330631350341214082564425736004255709991701.331192668.6702750691.209641350341214082564425736004255709991701.4641175153.3365682446.554251350341214082564425736004255709991701.6105159231.2946620409.810661350341214082564425736004255709991701.7716144751.6369563993.000771350341214082564425736004255709991701.9487131596.4489512736.696381350341214082564425736004255709991702.1436119631.4611466117.745891350341214082564425736004255709991702.3579108758.6412423754.188101350341214082564425736004255709991702.593798871.11077385229.5948111350341214082564425736004255709991702.853189881.88286350205.0401121350341214082564425736004255709991703.138481711.06296318369.2327131350341214082564425736004255709991703.452374281.4935289421.5451141350341214082564425736004255709991703.797567529.16392263112.5741151350341214082564425736004255709991704.177261390.88385239196.1122B/C ratio = 1.58

Simple Levelized Cost of Energy

LCOE is the cost of generating energy for a particular systemIt is the minimum price at which energy must be sold for an energy project to break even It includesinitial investment, operations and maintenance, cost of fuel, cost of capital.

calculationsLCOE = {(overnight capital cost * capital recovery factor + fixed O&M cost )/(8760 * capacity factor)} + (fuel cost * heat rate) + variable O&M cost.

Where capital recovery factor is the ratio of a constant annuity to the present value of receiving that annuity for a given length of time.

Using an interest rate i, the capital recovery factor is: CRF = {i(1 + i)^n} / {[(1 + i)^n]-1} where n is the number of annuities received.

capacity factor representing the portion of a year that the power plant is generating power.

Period15 yearsDiscount Rate(%)10Capital Cost($/kW)2835.5Capacity Factor (%)67Fixed O & M Cost ($/kW-yr)135.59Variable O&M Cost ($/kWh)0.029Electricity Cost (cents/kWh)9Cost Escalation Rate (%)6Calculation Parameters

Results