Standard and Guidelines for
MH development
Mini Grid Support ProgrammeGopal Raj Suwal
Programme OfficerESAP/AEPC
-
Project Cycle in Initial stageRequest collection
Desk (GIS) basedVerification
Field Verification
Feasible?If YesIf No
Stop
Feasible?If YesIf No
Stop
Detail Feasibility Study
Role ofConsultant
and support from *RRESC/DEES/DEEU
Desk (GIS)Identification
Reactive Project
Support from*RRESC/DEES/DEEU
Proactive Project
-
Process & Quality Assurance After DFS
Assessment Appraisal by AC/ MGSP
Construction Quality Inspection
Testing Commissioning
Power output Verification
One Year Guarantee Check
Feedback for Design Aspects
Feedback for Installation Aspect
Trainings
DFS Report from PQ consultant
TrainingsUpgrading standard/guidelines
Upgrading standard/guidelines
Technical Approval from TRC
Subsidy Approval from REF
-
Guidelines for Project at initial Stage Project Identification
guidelines Field Verification
Guidelines Guidelines for Preliminary
Feasibility studies of Micro Hydro Project
-
Standard and Guidelines for MHP Project
Guidelines for Detailed Feasibility studies of Micro Hydro Project
Reference Micro-hydropower Standard
-
Micro hydro Design Aids
Micro hydro Design AIDS Excel Sheet for MHP
component Design Prototype Drawings
-
Prototype Drawings Examples
-
Social Mobilization Guidelines
Guidelines for social mobilization of whole project cycle.
Helps community to understand, own and operate Micro-hydro project and its process
-
Tariff setting Guidelines
Guidelines for setting electricity Tariff
Helps Developer/user community to set / revise tariff on basis of project financial status/cash flow
-
Micro Hydro Operator Training Guidelines
Guidelines for Training of MHP operators
Provides in-depth technical solution/ support from water to wire for the operator during Micro hydro Operation
-
Micro-Hydro Project Management Guidelines
Guidelines for Managers of Micro Hydro Project
Provides guidance from overall management of Micro hydro project to account keeping
-
Catalogue for Micro hydro Components
Consist of product description and the price lists of Mechanical and electrical component of MHP
Supports developer/ consultants /installation companies for providing/ selecting cost effective equipment /products / materials
-
End Use Guidelines
Guidelines for selecting appropriate/ sustainable end use technology on need basis of local market requirement
-
Model Bidding and Contract Document
Consist of Standard Model Bidding for selecting Installation companies and contract document for project execution
-
Any Questions
-
THANK YOU
For Further Queries:Ph +977-01-5536843 ;5539391;5539390Mobile:9851104512email: [email protected]
mailto:[email protected]
Standard and Guidelines for MH developmentProject Cycle in Initial stageSlide Number 3Guidelines for Project at initial StageStandard and Guidelines for MHP ProjectMicro hydro Design AidsPrototype Drawings Examples Social Mobilization GuidelinesTariff setting GuidelinesMicro Hydro Operator Training GuidelinesMicro-Hydro Project Management GuidelinesCatalogue for Micro hydro ComponentsEnd Use Guidelines Model Bidding and Contract DocumentAny QuestionsTHANK YOU