Page 1: LSSF Economic Impact on Electrical Power Generation Report by: S. Clayton Palmer Clark D. Burbidge Western Area Power Administration

LSSF Economic Impact on Electrical Power Generation

Report by:

S. Clayton Palmer

Clark D. Burbidge Western Area Power Administration

Page 2: LSSF Economic Impact on Electrical Power Generation Report by: S. Clayton Palmer Clark D. Burbidge Western Area Power Administration

Upcoming Modeling Events

• Stakeholder Review of Modeling Methods. – May 2nd and 3rd– Salt Lake City, Marriott City Center

• Seminar on CRSP Power Models. – July– Chicago, Argonne National Laboratories

Page 3: LSSF Economic Impact on Electrical Power Generation Report by: S. Clayton Palmer Clark D. Burbidge Western Area Power Administration

Glen Canyon Test Releases

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

3/25/00 4/25/00 5/25/00 6/25/00 7/25/00 8/25/00 9/25/00

1,0

00 c

fs

Page 4: LSSF Economic Impact on Electrical Power Generation Report by: S. Clayton Palmer Clark D. Burbidge Western Area Power Administration

The Colorado River Storage Project

Transmission Grid

Page 5: LSSF Economic Impact on Electrical Power Generation Report by: S. Clayton Palmer Clark D. Burbidge Western Area Power Administration

Hydro LP• Simulates water release for generation to meet

customer load

• Maximizes revenues and minimizes costs

• Uses available water, market price, customer load, and unit environmental and operating constraints

• Used to analyze impacts of proposed constraints

• Forecasts available resources

Page 6: LSSF Economic Impact on Electrical Power Generation Report by: S. Clayton Palmer Clark D. Burbidge Western Area Power Administration

Base Case Assumptions

• USBR No Test Monthly Water Estimates

• Glen Canyon Record of Decision

• Normal Operations at other CRSP Units

• CRSP Customer Pre-Schedule Demand

• Average Hourly Purchase Prices

Page 7: LSSF Economic Impact on Electrical Power Generation Report by: S. Clayton Palmer Clark D. Burbidge Western Area Power Administration

Test Case Assumptions

• Actual Monthly Volume

• Actual Hourly Release Pattern

• Base Case Load

• Base Case Prices

• Base Case Operating Constraints

Page 8: LSSF Economic Impact on Electrical Power Generation Report by: S. Clayton Palmer Clark D. Burbidge Western Area Power Administration

Comparison of Water Releases

0

200

400

600

800

1,000

1,200

1,00

0 A

F

Test 1,051 1,060 1,009 805 649 648 907 1,130 474 493 495 656 606 803 826

No Test 1,051 1,060 1,009 805 649 650 625 600 600 750 850 690 600 750 923

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

Page 9: LSSF Economic Impact on Electrical Power Generation Report by: S. Clayton Palmer Clark D. Burbidge Western Area Power Administration

0

200

400

600

800

1000

1200

1400

1600

1800

Sunday Monday Tuesday Wednesday Thursday Friday Saturday

Total Generation Total No Test Generation Load

May: Total CRSP Generation

Page 10: LSSF Economic Impact on Electrical Power Generation Report by: S. Clayton Palmer Clark D. Burbidge Western Area Power Administration

0

200

400

600

800

1000

1200

Sunday Monday Tuesday Wednesday Thursday Friday Saturday

Total Generation Total No Test Generation Load

August: Total CRSP Generation

Page 11: LSSF Economic Impact on Electrical Power Generation Report by: S. Clayton Palmer Clark D. Burbidge Western Area Power Administration

Results: Total $’s by Month

Month Net of Test and

No TestApril $3,854,848.39May $7,210,218.91June ($1,458,815.02)July ($8,210,859.01)August ($21,430,628.83)September ($2,474,411.73)October $174,306.63November $106,513.89December $1,030,591.18

Total ($21,564,523.05)

Page 12: LSSF Economic Impact on Electrical Power Generation Report by: S. Clayton Palmer Clark D. Burbidge Western Area Power Administration