key to kerb types (all pennant) - amazon s3 · 2018-09-11 · 97 85 81 71 75 87 91 shelter 4.53m...
TRANSCRIPT
Purcell H
o
4
3
4
6
Aldrich H
o
4
3
4
4
5
2
1
(PH)
11
1
14
14
5
6
2
10
Hotel
5
3
Greenbank
11
107
55
5
0
2
4
7
7
1
9
21
5
1
5
3
58 to 62
79
83
69
73
99
95
89
77
93
97
85
81
71
75
87
91
Shelter
4.53m
Material
Scheme Ref.
Background
Border
Letter colour
Ref.
SIGN FACE
Width
Height
Area
x-heightSign P 7014
E16018
50.0
WHITE
RED
WHITE
Class RA2 (12899-1:2007) 0.1521m²
390mm
390mm
Material
Scheme Ref.
Background
Border
Letter colour
Ref.
SIGN FACE
Width
Height
Area
x-heightSign P 7014
E16018
50.0
WHITE
RED
WHITE
Class RA2 (12899-1:2007) 0.1521m²
390mm
390mm
Material
Scheme Ref.
Background
Border
Letter colour
Ref.
SIGN FACE
Width
Height
Area
x-heightSign P 7014
E16018
50.0
WHITE
RED
WHITE
Class RA2 (12899-1:2007) 0.1521m²
390mm
390mm
3
.5
2
m
5.55m
1.28m
PD
DK
PD
DK
P
D
D
K
P
D
D
K
PD
DK
CS
2 6
mm
CS
2 6
mm
PD
DK
OS NORTH
P
D
D
K
P
D
D
K
P
D
D
K
P
D
D
K
PE
NN
AN
T
ST
AN
LE
Y P
AR
K
C
A
R
T
LE
D
G
E
R
O
A
D
G
RE
EN
BA
NK
RO
AD
B
E
L
L
E
V
U
E
R
O
A
D
GR
EE
NB
AN
K A
VE
NU
E E
AS
T
C
R
O
M
E
R
R
O
A
D
LO
AD
ING
O
NLY
P
P
P
P
PD
DK
PD
DK
C
S2 6m
m
CS
2 6m
m
C
S
2
6
m
m
C
S
2
6
m
m
1.54m
Install new gully.
Re-use existing
frame and grate.
Install 3 no. New Cycle
stands to SD04-015.
Installed Dropped kerbs as
per SD 02-002 and tactile
paving to provide crossing
points.
Install new gully
with pedestrian
grate and connect
to manhole
Re-locate
Post box here.
Install new
Double
Yellow Lines
Install Loading Bay
.
Tactile paving to be
installed to provide
crossing point
Build Out Footway.
Plane out existing and
Install new Roadmarkings
Install Side inlet
gully and
connect to
manhole.
150mm dia. type z storm
water carrier drain laid as
per SD 05-008.
Install 125mm
Footway Channel
Install 125mm
Footway Channel
Type C Manhole.
600x600 Type C
Manhole to be
connected to existing
Outfall.
150mm dia. type z storm
water carrier drain laid as
per SD 05-008.
4.42m
0.86m
1.04m
5.80m
3.64m
1.89m
1.32m
Install new gully.
Re-use existing
frame and grate.
Kerbs (types as shown)
laid as per SD02-002-B
200x100x65 Tactile
Block paver Buff as per
SD03-007-B and
SD03-006-B
Proposed road gully
grating and pot
To SD05-007
Flow Arrow
Full Footway Construction (Built
Out Area) as per SD01-004-B:
20mm Surface Course AC6
55mm Binder Course AC20
150mm Type 1 granular Sub Base.
Footway Construction as per SD01-004-B
KEY
Footway Surfacing
as per SD 01-004-B
Carriageway Construction as per SD 01-009:
40mm Surface Course: HRA 30/14 F Surf 40/60.
60mm Binder Course: AC 20 dense bin 100/150.
200mm Base: AC 32 HDM base 40/60.
150mm Type 1 granular sub base.
150mm dia. type Z storm
water carrier drain laid as
per SD05-008.
Repositioned Post Box
Utility covers to be
raised / lowered
New manhole Type 'C'
as per SD05-003
CS2
PDDK PDDKP=PennantP=Pennant
(100mm Upstand)
as per SD 02-002
Pennant Double
Dropped kerb as
per SD 02-002
(100mm Upstand)
as per SD 02-002
as per SD 02-002
KEY to Kerb Types (All Pennant)
6mm
Upstand
Pennant Double
Dropped kerb as
per SD 02-002
B L
OTSIR
LC
CYTI
O U NCI
Rev. Date Description By
Project
Title
Client
Drawn by
Date Drawn
Scale
Checked by
Date Issued
Issued byStatus
Project Number
-Drawing
-Revision
PO Box 3176, Bristol. BS3 9FS
CITY DESIGNENGINEERING
DESIGN
CONSTRUCTION
Cycle Ambition Fund 2Easton Safer Streets
Greenbank Roadj/w Bellevue RoadGeneral Arrangement
Sustainable TransportTransport - PLACE
PAK
Nov 18
1:200 @ A1
AB
09.11.18
PAK
E16018-01 C01
NOTES:
1. All dimensions are in metres (m) unless
otherwise stated.
2. For typical concrete major road construction
refer to standard detail SD 01-001-B.
3. For footway standard details refer to SD
01-004-B.
4. For typical edge of carriageway standard
detail refer to SD 01-008-B.
5. For typical flexible industrial pavement
reinstatement standard details refer to SD
01-009-B.
6. For typical kerb standard details refer to SD
02-001-B to SD 02-003-B.
7. For typical channel standard detail refer to
SD 02-004-B.
8. For typical edging kerb standard detail refer
to SD 02-005-B.
9. For typical block paver edging standard
details refer to SD 02-006-B.
10. For typical pedestrian drop kerbs standard
detail refer to SD 03-003-B.
11. For typical pedestrian crossing standard
details refer to SD 03-005-B to SD 03-009-B.
12. For typical Type 2 pedestrian island standard
detail refer to SD 04-005-B.
13. For signage drawing see dwg E15058-004
14. Do not scale this drawing.