kete-embarq-ver2
TRANSCRIPT
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 1/30
Mobilizing Resources t o Manage Risk
& Pursue Opport unit ies
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 2/30
EMBARQ
• A catalyst for socially, financially, and
environmentally sound solutions to theproblems of urban mobility
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 3/30
EMBARQ
• A center within World Resources Institute, anindependent non-profit research and policyorganization
• Founded in May 2002 by WRI with a 5 yr grantfrom Shell Foundat ion
• Additional EMBARQ contributors include – Hew let t Foundat ion – Netherlands Minist ry of Foreign Affairs – Asian Development Bank – Energy Foundat ion – Blue Moon Fund
– US Environmental Protect ion Agency
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 4/30
EMBARQ’s St rat egy
• Work with politically and financially empowereddecision makers
• Form strategic public-private partnerships
• Inject “business DNA” into government/NGOprojects or a Disciplined Drive for Quality
– Learn from corporate sectors’ mistakes and successes
to save time and money in public sector
– Reduce risks and costs by good project planning andmanagement techniques
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 5/30
EMBARQ in Mexico
From t heory t o pract ice
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 6/30
EMBARQ’ s St rategy
• Work with politicallyand financiallyempowered entities
• Form strategic
public-privatepartnerships
GENERAL MEXI CO CI TY
• GDF• Shell & Hewlett
Foundations
• Vehicle manufacturers• World Bank
• MOU with City Gov to
create CTS-Mexico andto cooperate onsustainable transport
1
2
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 7/30
EMBARQ’ s St rategy
• Form strategicpublic-privatepartnerships
• Inject “BusinessDNA” to obtain bestoutcomes
GENERAL MEXI CO CI TY• Partnered with national
government, other NGOand numerous privatecompanies to implement
solution set
• Orientation
• Opportunity Framing
• Risk Analysis
• Decision Road Maps
• FAST Diagrams
3
4
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 8/30
I nt egrated solut ions for Mexico Cit
• Bus Rapid Transit – Technical advisory services t o cit y on:
• Design and infrast ructure• I nst it ut ional/ Organizat ional Reform• Negotiat ion w it h service providers
• Diesel Retrofit – Test potent ial emissions reduct ion for heavydiesel
– I nt roduct ion of top-of- t he-line t echnologies
• Test Clean Fuels and Buses – Secured donat ions/ loans from MNC
– I dent ify best -perform ing fuel/ enginecombinat ions for Mexico Cit y condit ions
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 9/30
Bus Rapid Transit
• Systemat ic Reorganizat ion of Sur face
Transport – Rapid implementation, stable finances still possible – Reliable (mostly private) operators, relatively transparent
regulations,
– Potential for integration with other modes (smart cards)• Backbone of I nt egrated Mass Transit System
– Friendly to other modes – Clearly branded and popular (High customer satisfaction)
– Can be integrated with State of Mexico transit services• Priorit y t o t he Client
– Speed through protected lanes, traffic signal synch. – Greater comfort and security on board, smoother ride
– Reliability and high frequency, with pre-paid fares
• Health impacts baseline and w it h corr idor
More than just lines on a map!
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 10/30
Scaling Up: Mexico City
Met ro & l ightMet ro & l ightrailrail
FutureFutureBRTBRTcorridorscorridors
InsurgentesInsurgentesBRT corr idorBRT corr idor
TLALPAN
CUAUHTÉMOC
AZCAPOTZALCO
VENUSTI ANOCARRANZA
BENI TOJUÁREZ
COYOACÁN
XOCHI MI LCO
I ZTAPALAPA
TLÁHUAC
G. A. MADERO
I ZTACALCO
ÁLVAROOBREGÓN
MI GUELHI DALGO
L 1, 5, 9, A
LAL8L2
L3
L7
L1 L9 L4
L4
L2LB
L6
L5L6
L7
LB
L8
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 11/30
Ret rof it t ing Mexico Cit y’s Diesel Fleet
• Exhaust retrofit of existing heavy vehicles;
90% less PM, 20% less NOx
with catalyst-based diesel particulate filters• Used cleanest diesel available (<15 PPM)
• Careful testing to pick best buses to retrofit
• Competitive bidding for equipment
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 12/30
Test ing for best engine/ fuel combo
• Advanced Systems – Maybe Now , MaybeLater – Fuel cells: Feedstock and infrastructure main
uncertainties; cost is high
– Hybrid showed lowest emissions, fuel use, butnot best value
– Clean diesels (with ultra low sulfur fuel) likelythe most cost-effective option
– CNG buses good emissions performance butwill require system change - a high hurdle
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 13/30
Tractor t rai75,000
Light t ruck19,000
Buses30,000
Other9,100
Passenger32,000
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 14/30
Anatomy of a Train Wreck
Why large projects fail in cost-efficiency & performance
• Poor front-end loading (early-stage planning)
• Schedule Driven Vs. Decision Driven
• Caught up in company politics
• Ignored best practices:Learning curve does not curve!
• Inappropriate contracting strategies
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 15/30
Ignoring best practices
• Exceptionalism: “We do it differently
here”• Lack of ownership: “Give me a call
when its finished”
• Inadequate front-end planning: “It’s afast track project”
• Corporate arrogance: “This project isdifferent”
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 16/30
Risks and Opportunities
• Municipal proj ect s exhibi t all of t hese r isks,and t hen some
• They have less access to good practices thanbusiness, less money to waste, but less incentive to
be efficient
• Partnership with EMBARQ contingent upon beingwilling to manage risks and opportunities
collaboratively, using process adapted from Shelland other businesses
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 17/30
The EMBARQ Process: Objectives
• To produce clarity and alignment among theteam, interest groups, and decision makers
about what is, in fact, the opportunity;• Identify the main motivation points and
success factors, as well as the risks andopportunities;
• Define the range of efforts necessary to
develop the opportunity;• Build a road map oriented by decisions and
a plan to reach success.
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 18/30
Why Plan so Carefully?
DEFI NEI DENTI FY &EVALUATE EXECUTE
OPERATE YMAINTAIN
Abil i ty t oinf luence cost
TiME
Low
High
Cost t o Change
Abil i ty t oinf luence cost
SELECTStage of t heproject
$1 $10 $100 $1000>$10,000I nvestment in$1,000
De ining t e Opportunity an t e
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 19/30
De ining t e Opportunity an t elife cycle of a Generic Project
Defining the opportunity
SELECT DEFI NEI DENTI FY AND
ESTI MATE EXECUTEPERFORM AND
MAINTAIN
Determine theopportunity’s
pot encial valueand t heal ignment w iththe business’strategy
Generat e andselect t he
concept t otake theopportunity
Finalize t herange, costs,
chronogram,and ger t heexecutionresources
Build andproduce in a
consistentmanner w i thdefined range,cost s, andchronogram
Start t o performand evaluate to
guarantee acorrectperformance andthe return t oshareholders
Identification of the Value Realization of the Value
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 20/30
Good front -end planning
• What is left t o do?
• What are the risks andopportunities?
• Act ions/ decisions
• What m ust be done to makeprogress and succeed?
3. How do w e get t here?3. How do w e get t here?
•Objectives
• Definit ionof success
2. Where
do w e w antt o be?
2. Where2. Where
do w e w antdo w e w antt o be?to be?
•What has beendone up unt ilnow?
•Why this proj ect?
•Where are w e int he project?
1. Whereare w e?1. Where1. Whereare w e?are w e?
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 21/30
The opport unit y statement defines w hat t he opport unit y is andisn’t!
• Serves as basis for t he design and it w ill be tested as w e
move forw ard;• Serves to mant ain t he team’s focus;• Establishes a reference point .
A good pportunit y st at ement should have the follow ingcharacteristics:• Be logical;• Allow all t eam m embers t o use it as a reference;• Open enough opport unit ies t o invest igate creat ive
alternatives;• Be clear and concise to all t hat read it ;• Consider ful l li fe cicle.
The opportunity statement
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 22/30
Framing
• By 2007, Cit y X w ant s t o beoperat ing a new , high qualit yBRT, w it h a t runk-feed design,
managed/ administ rated by anindependent ent it y, w hich offersusers an improvement in service
and w hich creates new businessopport unit ies for t he incumbentsoperat ing in t he system today.
2. Where
do w ew ant t obe?
Opportunity Statement
2. Where2. Where
do w edo w ew ant t ow ant t obe?be?
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 23/30
Framing
Opportunity Statement
By t he end of 2007, a corr idor going
through t he cit y center w il l be w ork ing,t aking out stops and t erminals,improving the space and t ransport
circulat ion; aspir ing t o be of highperformance and keeping the arr ival ofpeople t o t he cent er. The operat ion of
t he corr idor w ill be economicallysustainable, t ranscending change ingovernment and creat ing opport unit iesof pr ivate investment s.
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 24/30
Framing
Definition of success
Principal Success Crit eria • Rest ructure of public spaces in t he cit y
cent er, start ing by removing buses f romSuch and Such an Avenue;
• High customer sat isfact ion;• No more lines of people w ait ing for
buses in t he cit y cent er .
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 25/30
InfrastructureProjectTecnology
InfrastructureProjectTecnology
BudgetsCostsEconomic ModelFinancing
BudgetsCostsEconomic ModelFinancing
ContractsCommercial ModelMarketing
ContractsCommercial ModelMarketing
StructureResponsabilitiesProcedures
Structure
ResponsabilitiesProcedures
GovernmentInterested GroupsEmployment
GovernmentInterested Groups
Employment
Risk Analysis – the TECOP Concept
Technical
Economic
Polit ic
Organizational
Commercial
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 26/30
Process
Where arew e?
How do we get t here?Where do wew ant t o go?
LimitsDecisions m adePressuposts
Business Cont ext
Management of I nterestGroups
Define the opportunit y
Define the success
Key-factors for success
Success measurements
Success
Path t o be followed
Risks
InfrastruturaProjetoTecnología
InfrastruturaProjetoTecnología
OrcamentosCustosModeloeconômicofinanciamento
OrcamentosCustosModeloeconômicofinanciamento
ContratosModeloComercialMarketing
ContratosModeloComercialMarketing
EstruturaCompetênciasProcedimentos
EstruturaCompetênciasProcedimentos
GovernoGruposinteressadosEmprego
GovernoGruposinteressadosEmprego
Técnico
Econômico
Político
Organisacional
Comercial
Proj ect phasesPrincipal goals
Key-decisions
Business Minds BV
TECOP A infraestrutura, o Projeto, a Tecnologia…
Riscos técnicos
23
2221
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
OportunidadeAmeaçaRiscoRef
The Risks
D i i R d M
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 27/30
Decision Road Map
Quien Decide Quien Decide Quien Decide Quien Decide Quien Decide
Líder del equipo:
Equipo:
Líder del equipo:
Equipo:
Líder del equipo:
Equipo:
Líder del equipo:
Equipo:
Líder del equipo:
Equipo:
Fase 1 Fase 2 Fase 3 Fase 4 Fase 5
Detenerse, Espera, Reciclar Detenerse, Espera, Reciclar Detenerse, Espera, Reciclar Detenerse, Espera, Reciclar Detenerse, Espera, Reciclar
Tiempo Tiempo Tiempo Tiempo Tiempo Tiempo
OBJECTI VE
TIME
KEYDECI SI ONS
DECI SI ON
MAKERSDELI VERABLES
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 28/30
The most recurring risks
• Prioritizing the project (assign projectmanager full time)
• Prioritizing the project (mayor gives itsufficient budget and attention)
• Exclusive focus on technological• Time to define financial model vs time
to execute the project
• Resistence to change (incumbentoperators, street vendors, users, etc)
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 29/30
Thank You
Nancy Kete28 March 2006
www.embarq.wri.org
S stainable T anspo t Sol tions
8/2/2019 kete-embarq-ver2
http://slidepdf.com/reader/full/kete-embarq-ver2 30/30
Sustainable Transport Solutions
Operate & Maintain
ExecuteDefineSelectIdentify& Assess
Diagnose
Decide to Go
Ready to start
up
A portfolio of solutions to be implementedProblems are now well defined
Typical EMBARQ Solution Set
•Mass Transit - BRT typically, and/ortransit system business model restructuring
• Non-motorized transport• Transport demand management• Traffic engineering• Retire, Replace, or Retrofit for emissions
control• Transport oriented development• Policy reforms to enable any of the above
Typical Diagnosis Outputs
•Emissions Inventory• Indicators•Preliminary assessment